Effects of the Northridge Earthquake on Small Business Survival: An Analysis of the Causes and Prevention of Small Business Failure Due to Earthquakes

北岭地震对小企业生存的影响:小企业因地震倒闭的原因分析及预防

基本信息

  • 批准号:
    9416228
  • 负责人:
  • 金额:
    $ 9.84万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    1994
  • 资助国家:
    美国
  • 起止时间:
    1994-09-01 至 1996-02-29
  • 项目状态:
    已结题

项目摘要

9416228 Alesch This project is being funded as part of the National Earthquake Hazards Reduction Program's investigation into the causes and effects of the January 17, 1994 earthquake. The purpose of the research is to: learn the extent to which the earthquake contributed to small business failures; identify the extent to which structural mitigation, insurance, noninsurance risk management techniques, and disaster assistance contributed to small business survival and recovery; field test a theoretical model that estimates the probable financial effects of damaging earthquakes on small businesses based on business and industry characteristics; and provide a basis for furthering risk management strategies for small businesses. Data will be collected through telephone and face-to-face interviews with a stratified, random sample of small business owners and operators in the Los Angeles area. ***
9416228 Alesch这个项目是作为国家减少地震灾害计划调查1994年1月17日地震的原因和影响的一部分而得到资助的。 这项研究的目的是:了解地震在多大程度上导致了小企业的倒闭;确定地震在多大程度上导致了小企业的倒闭。 结构 减轻、保险、非保险 风险管理技术和灾害援助有助于小企业的生存和恢复;实地测试一个理论模型,该模型根据企业和行业特点估计破坏性地震对小企业可能产生的财务影响;并为 促进 小企业的风险管理策略。 数据将 通过电话和面对面的访谈,对洛杉矶地区的小企业主和经营者进行分层随机抽样。 ***

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Daniel Alesch其他文献

Daniel Alesch的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Daniel Alesch', 18)}}的其他基金

Evaluation of Ordinances For Earthquake Hazard Abatement in Existing Buildings
现有建筑防震减灾条例评估
  • 批准号:
    8024728
  • 财政年份:
    1981
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Continuing Grant

相似海外基金

Influence of Soil-Structure Interation on Motions Recorded at the Jensen Filtration Plant during Northridge Earthquake & Aftershocks & its Implications for Nonlinear Site R
北岭地震期间土壤-结构相互作用对詹森过滤厂记录的运动的影响
  • 批准号:
    9815053
  • 财政年份:
    1999
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Standard Grant
LARSE II: A Seismic Profile Through the 1994 Northridge Earthquake Epicentral Region and Central Transverse Ranges
LARSE II:1994 年北岭地震震中地区和中央横断山脉的地震剖面
  • 批准号:
    9725413
  • 财政年份:
    1998
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Standard Grant
Earthquake Disaster Mitigation for Urban Transportation Systems: An Integrated Methodology that Builds on the Kobe and Northridge Experiences
城市交通系统的地震减灾:基于神户和北岭经验的综合方法
  • 批准号:
    9812503
  • 财政年份:
    1998
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Continuing Grant
Earthquake Disaster Mitigation for Urban Transportation Systems: An Integrated Methodology that Builds on the Kobe and Northridge Experiences
城市交通系统的地震减灾:基于神户和北岭经验的综合方法
  • 批准号:
    9816193
  • 财政年份:
    1998
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Continuing Grant
Creation of a Web Site for Resolution of Site Response Issues from the 1994 Northridge Earthquake (ROSRINE)
创建网站以解决 1994 年北岭地震现场响应问题 (ROSRINE)
  • 批准号:
    9712787
  • 财政年份:
    1997
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Standard Grant
U.S.-Japan Workshop on Mitigation of Near-Field Earthquake Damage in Urban Areas-Comparative Studies of the Northridge and Kobe Experience
美日减轻城市近场地震损害研讨会——北岭和神户经验比较研究
  • 批准号:
    9602932
  • 财政年份:
    1997
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Standard Grant
Resolution of Site Response Issues from the Northridge Earthquake
北岭地震现场响应问题的解决
  • 批准号:
    9529159
  • 财政年份:
    1996
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Standard Grant
Northridge Earthquake Research Conference and Report (to be held in Los Angeles in January 1997)
北岭地震研究会议和报告(1997年1月在洛杉矶举行)
  • 批准号:
    9617053
  • 财政年份:
    1996
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Standard Grant
Analysis of the 1994 Northridge Earthquake Aftershocks Using Micropolar Continuum Theory
利用微极连续体理论分析 1994 年北岭地震余震
  • 批准号:
    9416318
  • 财政年份:
    1995
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Standard Grant
Modeling the Long-Period Basin Response in San Fernando and Los Angeles Regions During the 1994 Northridge Earthquake
模拟 1994 年北岭地震期间圣费尔南多和洛杉矶地区的长周期盆地响应
  • 批准号:
    9422238
  • 财政年份:
    1995
  • 资助金额:
    $ 9.84万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了