课题基金 / 基金详情

SBIR Phase I: Chatter Avoidance Software for High Speed Milling

SBIR Phase I: Chatter Avoidance Software for High Speed Milling
SBIR 第一阶段:用于高速铣削的颤振避免软件
批准号:
9861180
负责人:
Donald Esterling
金额:
$10.0万
依托单位:
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
1999
资助国家:
美国
项目状态:
已结题
起止时间:
1999-01-01 至 1999-06-30

项目摘要

项目成果

Donald Esterling的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
9861180 This Small Business Innovation Research (SBIR) Phase I project will explore an application of complex chatter theory to operator control of high-speed machining processes. The approach will be numerical control (NC) program verification software that alerts machinists to vibration problems that might occur using the speeds and feeds they have selected and to recommend alternate, optimized speeds. Phase I will: [1] Evaluate and bound the errors of existing chatter theory in the context of a "tool tuning" methodology for high-speed milling; [2] Confirm theoretical results at a state-of-the-art high-speed milling facility by measuring and characterizing vibrations accurately; and [3] Consolidate these results within an NC program verification software package that provides (a) recommended optimal spindle speeds, based on the theoretical stability lobes predicted for an associated tool, (b) a simple means to convey to a machinist where on the part and in the part program serious chatter is likely to arise, and (c) a means for users to amend parameters based on experience . High-speed mill operators are not likely realizing the full advantage of their mill performance capabilities, relying instead on conservative shop practice, which is based on conventional mills and a chatter avoidance strategy. This software is expected to guide shop floor personnel through an optimal chatter-free speed and feed selection process, and though based on complex theory, it will use terms familiar to them.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
SBIR Phase II: Intelligent Tool Wear Monitoring
  • 批准号:
    0923900
  • 项目类别:
    Standard Grant
  • 资助金额:
    $0.0万
  • 财政年份:
    2009
  • 负责人:
    Donald Esterling
  • 依托单位:
SBIR Phase I: Intelligent Tool Wear Monitoring
  • 批准号:
    0810434
  • 项目类别:
    Standard Grant
  • 资助金额:
    $0.0万
  • 财政年份:
    2008
  • 负责人:
    Donald Esterling
  • 依托单位:
SBIR Phase II: Chatter Avoidance Software for High Speed Milling
  • 批准号:
    0078904
  • 项目类别:
    Standard Grant
  • 资助金额:
    $40.0万
  • 财政年份:
    2000
  • 负责人:
    Donald Esterling
  • 依托单位:
Manufacturing Technology Learning Modules: Integrating Mathematics and Technology Education Curriculum
  • 批准号:
    9255715
  • 项目类别:
    Continuing grant
  • 资助金额:
    $0.0万
  • 财政年份:
    1993
  • 负责人:
    Donald Esterling
  • 依托单位:
国内基金
海外基金
Baryogenesis, Dark Matter and Nanohertz Gravitational Waves from a Dark Supercooled Phase Transition
  • 批准号:
    24ZR1429700
  • 项目类别:
    省市级项目
  • 资助金额:
    --
  • 批准年份:
    2024
  • 负责人:
    YUICHIRO NAKAI
  • 依托单位:
ATLAS实验探测器Phase 2升级
  • 批准号:
    11961141014
  • 项目类别:
    国际(地区)合作与交流项目
  • 资助金额:
    3350万元
  • 批准年份:
    2019
  • 负责人:
    刘衍文
  • 依托单位:
地幔含水相Phase E的温度压力稳定区域与晶体结构研究
  • 批准号:
    41802035
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    12.0万元
  • 批准年份:
    2018
  • 负责人:
    张里
  • 依托单位:
基于数字增强干涉的Phase-OTDR高灵敏度定量测量技术研究