课题基金 / 基金详情

The NARS-Baja Seismic Array: Continued Operations and Research

The NARS-Baja Seismic Array: Continued Operations and Research
NARS-Baja 地震台阵:持续运行和研究
批准号:
0405437
负责人:
Robert Clayton
金额:
$22.5万
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
2004
资助国家:
美国
项目状态:
已结题
起止时间:
2004-05-01 至 2008-04-30

项目摘要

项目成果

Robert Clayton的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
A broadband seismograph network - the NARS-Baja network (Network of Autonomously Recording Seismographs) - consisting of 14 three-component broadband seismographs is being completed and operated in Baja and Sonora, Mexico, around the Gulf of California. The instruments have been installed in cooperation with the University of Utrecht and Centro de Investigacion Cientifica y de Educacion Superior de Ensenada and will be in operation for at least for 3 years. The data are retrieved from the stations approximately every three months and are available through the IRIS-Data Management Center and the Southern California Earthquake Data Center. With these data, the investigators are mapping the crustal and upper mantle structure around the Gulf of California using receiver functions, tomography, and surface wave analysis with the aim to investigate the: 1) difference in mantle structure beneath the Gulf of California and the North American plate boundary; 2) the possible relation of along-strike structural complexity in the crust and mantle and the systematic change in deformation style in the Gulf of California rift; and 3) the location of active faults in the Gulf and their slip direction. This project has strong synergism with other NSF-funded large-scale projects such as EarthScope and MARGINS).
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Collaborative Research: A New 3-D Velocity and Structural Model of the Northern Basins in the Los Angeles Region for Improved Ground Motion Estimates
  • 批准号:
    2105358
  • 项目类别:
    Standard Grant
  • 资助金额:
    $21.86万
  • 财政年份:
    2021
  • 负责人:
    Robert Clayton
  • 依托单位:
Collaborative Research: Improving the Interpretability of Tomographic Images Using Geologically Motivated Parametrizations
  • 批准号:
    2011107
  • 项目类别:
    Standard Grant
  • 资助金额:
    $6.5万
  • 财政年份:
    2020
  • 负责人:
    Robert Clayton
  • 依托单位:
Collaborative Research: Understanding the crustal link between the Columbia River flood basalts and lithospheric foundering.
  • 批准号:
    1546635
  • 项目类别:
    Continuing Grant
  • 资助金额:
    $22.76万
  • 财政年份:
    2016
  • 负责人:
    Robert Clayton
  • 依托单位:
Imaging the Eastern Trans-Mexican Volcanic Belt
  • 批准号:
    1645063
  • 项目类别:
    Continuing Grant
  • 资助金额:
    $17.86万
  • 财政年份:
    2016
  • 负责人:
    Robert Clayton
  • 依托单位:
海外基金