课题基金 / 基金详情

STTR Phase I: EBC/TBC coating system for Si-based ceramic components for improved gas turbine performance and lifetimes

STTR Phase I: EBC/TBC coating system for Si-based ceramic components for improved gas turbine performance and lifetimes
STTR 第一阶段:用于硅基陶瓷部件的 EBC/TBC 涂层系统,可提高燃气轮机的性能和使用寿命
批准号:
0930750
负责人:
Satish Dixit
金额:
$15.0万
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
2009
资助国家:
美国
项目状态:
已结题
起止时间:
2009-07-01 至 2010-12-31
关键词:

项目摘要

项目成果

Satish Dixit的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
This award is funded under the American Recovery and Reinvestment Act of 2009 (Public Law 111-5).This Small Business Technology Transfer Phase I project between Plasma Technology Incorporated and Boston University will develop a functionally graded thermal barrier/environmental barrier coating (TBC/EBC) system for aerospace and power generation gas turbines. Introducing ceramic components (such as SiC/SiC composites) into gas turbines increases their operating temperatures, leading to increased efficiency and reduced environmental impact. However, these silicon-based ceramics are susceptible to hot-corrosion and recession in the presence of hot corrosive gases, particulates, and water vapor. The innovation in this project involves developing an integrated TBC/EBC system on SiC/SiC composite components in gas turbines, where the multifunctional mullite-based chemically vapor deposited EBC layer prevents recession and hot-corrosion and reduces thermal stresses by being functionally graded, dense, and crack-free. This coating layer is also substantially thinner than EBCs currently being used, leading to weight savings, which is of critical importance in aerospace applications. Subsequently, a plasma sprayed YSZ topcoat with engineered crack microstructure will be deposited over the EBC layer which will further increase the operating temperature and/or reduce the temperatures the components are exposed to, thereby enhancing sustainability of the gas turbine components.This innovative coating system will reduce costs by increasing the coating lifetime and reducing the need for refurbishment and repair. It will also lead to fuel savings due to increased efficiency and reduce emissions that adversely affect the global climate, thereby increasing environmental sustainability. This project will also provide a Materials Science and Engineering graduate student with commercially relevant research experience in this very critical area of gas turbine technology. The major customers who will be benefited are Solar Turbines, GE, Siemens and Pratt & Whitney. The world turbine industry is roughly a $90 billion industry, and there is a high market potential for the developed technology. For example, the projected supply and demand for turbine engines alone in the United States is about $10 billion by year 2012. Successfully capturing just 0.1 % of this potential market translates into a $10 million business. Therefore, the large market potential provides justification for the development of EBC coating techniques and PTI will work closely with industry partners to commercialize the technology.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
SBIR Phase I: Erosion Resistant Nano-composite Physical Vapor Deposition Coatings for High Temperature Polymer Matrix Composites Applications
  • 批准号:
    0638221
  • 项目类别:
    Standard Grant
  • 资助金额:
    $0.0万
  • 财政年份:
    2007
  • 负责人:
    Satish Dixit
  • 依托单位:
国内基金
海外基金
Baryogenesis, Dark Matter and Nanohertz Gravitational Waves from a Dark Supercooled Phase Transition
  • 批准号:
    24ZR1429700
  • 项目类别:
    省市级项目
  • 资助金额:
    --
  • 批准年份:
    2024
  • 负责人:
    YUICHIRO NAKAI
  • 依托单位:
ATLAS实验探测器Phase 2升级
  • 批准号:
    11961141014
  • 项目类别:
    国际(地区)合作与交流项目
  • 资助金额:
    3350万元
  • 批准年份:
    2019
  • 负责人:
    刘衍文
  • 依托单位:
地幔含水相Phase E的温度压力稳定区域与晶体结构研究
  • 批准号:
    41802035
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    12.0万元
  • 批准年份:
    2018
  • 负责人:
    张里
  • 依托单位:
基于数字增强干涉的Phase-OTDR高灵敏度定量测量技术研究