课题基金 / 基金详情

SBIR Phase I: Enterprise Decision making using Activity Interaction technology

SBIR Phase I: Enterprise Decision making using Activity Interaction technology
SBIR 第一阶段:使用活动交互技术进行企业决策
批准号:
0945777
负责人:
David Zhang
金额:
$0.0万
依托单位:
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
2010
资助国家:
美国
项目状态:
已结题
起止时间:
2010-01-01 至 2010-12-31

项目摘要

项目成果

David Zhang的其他基金

相似基金

相关文献

中文摘要
翻译
该小型企业创新研究(SBIR)第一阶段项目旨在开发一种网络算法,用于高效运行大规模网络模拟,以执行企业规划和风险分析。目前,供应链模型只由简单的、低细节的节点组成,这些节点只近似于它们所代表的设施的参数。因此,很难确定运营级别的变化和关系在整个网络级别上的影响。研究表明,运行由详细运营模型组成的大规模供应链模型将运行得太慢,无法及时执行任何有意义的分析。该项目旨在开发一种模拟方法,将高度详细的运行级模型与其大型网络规模模型有效地联系在一起。每个运营模拟都将通过供需、产品流动和库存保存中心等网络关系联系在一起。然后,可以创建存储这些关系参数的矩阵,从而将所需的计算时间投资降至最低。该项目的广泛影响/商业潜力将使组织更好地了解他们在内部和整个生产网络中面临的风险。工业事故,如爱立信工厂火灾,使该公司的库存水平大幅下降,突显了理解公司之间以及公司内部复杂内部关系的必要性。通过网络模拟器,分析人员可以明确了解设施之间的相互关系,以及不良事件不仅会影响一个设施,还会影响整个网络。这项技术有可能应用于整个生物制药行业,既提高了对患者的护理质量,又降低了类似数量的制造成本。
英文摘要
This Small Business Innovation Research (SBIR) Phase I Project seeks to develop a Network Algorithm for efficiently running large-scale network simulations to perform enterprise planning and risk analysis. Currently, supply-chain models consist of only simplistic, low-detail nodes which only approximate the facility's parameters that they represent. Because of this, it is difficult to determine the effect of operational level changes and relationships on a network-wide level. Research has shown that running a large-scale, supply chain model consisting of detailed operational models will run too slowly to perform any meaningful analysis in a timely manner. This project aims to develop a simulation methodology that meaningfully links together highly-detailed operational level models with its large network-scale model. Each operations simulation will be linked by network relationships such as supply and demand, product flows, and inventory holding centers. It is then possible to create a matrix which stores these relational parameters that minimize the computing time investment required. The broader impact/commercial potential of this project will provide organizations with a better understand of the risks they face both internally and across the entire production network. Industrial mishaps, such as the Ericsson facility fire which decimated the firm's inventory levels, have underlined the need to understand the complex inter-relationships between, as well as within, companies. A network simulator allows analysts to explicitly see how facilities are interrelated and how adverse events affect not just one facility, but the entire network. The technology has to potential to be used across the biopharmaceutical industry and both increase quality of care to the patient as well as reduce manufacturing costs by a similar amount.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
SBIR Phase II: Enterprise Decision Making Using Activity Interaction Technology
  • 批准号:
    1052566
  • 项目类别:
    Standard Grant
  • 资助金额:
    $50.0万
  • 财政年份:
    2011
  • 负责人:
    David Zhang
  • 依托单位:
国内基金
海外基金
Baryogenesis, Dark Matter and Nanohertz Gravitational Waves from a Dark Supercooled Phase Transition
  • 批准号:
    24ZR1429700
  • 项目类别:
    省市级项目
  • 资助金额:
    --
  • 批准年份:
    2024
  • 负责人:
    YUICHIRO NAKAI
  • 依托单位:
ATLAS实验探测器Phase 2升级
  • 批准号:
    11961141014
  • 项目类别:
    国际(地区)合作与交流项目
  • 资助金额:
    3350万元
  • 批准年份:
    2019
  • 负责人:
    刘衍文
  • 依托单位:
地幔含水相Phase E的温度压力稳定区域与晶体结构研究
  • 批准号:
    41802035
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    12.0万元
  • 批准年份:
    2018
  • 负责人:
    张里
  • 依托单位:
基于数字增强干涉的Phase-OTDR高灵敏度定量测量技术研究