课题基金 / 基金详情

Assessing Uncertainties in Balanced Cross Sections

Assessing Uncertainties in Balanced Cross Sections
评估平衡横截面的不确定性
批准号:
1019252
负责人:
Richard Allmendinger
金额:
$22.37万
依托单位:
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
2010
资助国家:
美国
项目状态:
已结题
起止时间:
2010-08-01 至 2013-07-31

项目摘要

项目成果

Richard Allmendinger的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
Balanced cross sections were first developed and widely deployed by the oil and gas industry to improve the success of exploration efforts in mountain belts such as the Canadian Rocky Mountains. Despite five decades of widespread use in both academia and industry, no formal method for assessing the uncertainty in these sections has ever been proposed. In this project, the investigators will remedy this shortcoming by developing the first generally applicable method to propagate errors through the calculation that leads to horizontal shortening estimates from balanced sections. Without these uncertainty estimates, it is impossible to predict the reliability, as suggested by either academic or industry practitioners, of balanced section models.The investigators will develop formal error propagation using an area balance approach, which has the advantages that it encompasses all possible structural models, includes seldom incorporated factors such as stratigraphic thickness variation and shortening mechanisms below the resolution of the section, and can be achieved analytically, obviating the need to draw a large number of sections in the same region. Testing of the method on thrust belts in the Canadian Rockies and Taiwan will allow this research group to explore the effect of stratigraphic variations as well as kinematic styles on the degree of uncertainty in these iconic balanced cross sections.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
RAPID: Investigation of Co-seismic Surface Cracks Produced during the April 1, 2014, Magnitude 8.2 Pisagua, Chile, Earthquake
  • 批准号:
    1443410
  • 项目类别:
    Standard Grant
  • 资助金额:
    $2.48万
  • 财政年份:
    2014
  • 负责人:
    Richard Allmendinger
  • 依托单位:
Permanent Upper Plate Deformation Associated with the Mw8.8 Maule, Chile Earthquake of 2010
  • 批准号:
    1118678
  • 项目类别:
    Standard Grant
  • 资助金额:
    $17.0万
  • 财政年份:
    2012
  • 负责人:
    Richard Allmendinger
  • 依托单位:
Collaborative Research: Forearc Cracks and the Rupture Segments of Great Earthquakes, N. Chile and S. Peru
  • 批准号:
    0738633
  • 项目类别:
    Standard Grant
  • 资助金额:
    $32.42万
  • 财政年份:
    2008
  • 负责人:
    Richard Allmendinger
  • 依托单位:
The Co-evolution of Thin- and Thick-skinned Deformation Associated with Flat Subduction, Western Argentina
  • 批准号:
    0510785
  • 项目类别:
    Continuing Grant
  • 资助金额:
    $33.15万
  • 财政年份:
    2005
  • 负责人:
    Richard Allmendinger
  • 依托单位:
海外基金