Collaborative Research: Revealing the hidden groundwater storage dynamics of the Great Lakes Basin by synthesizing geodesy, hydrologic modeling, and remote sensing

合作研究:通过综合大地测量学、水文建模和遥感,揭示五大湖盆地隐藏的地下水储量动态

基本信息

  • 批准号:
    2218028
  • 负责人:
  • 金额:
    $ 95.73万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2022
  • 资助国家:
    美国
  • 起止时间:
    2022-09-01 至 2027-08-31
  • 项目状态:
    未结题

项目摘要

Understanding the complex and interwoven effects of changing climate and land use on hydrology is necessary to manage water resources. The Great Lakes Basin (GLB), the world’s largest surface freshwater resource, has experienced dramatic shifts in lake levels from record lows to record highs over the last decade. Despite over a century of lake level measurements, we do not fully understand what drives such fluctuations in Great Lakes levels. One reason is that the basin’s extensive groundwater resources are poorly monitored, and often ignored in models. Here, we propose to develop a hydrologic model that more accurately simulates both surface and groundwater flows, driven by and validated using data from both ground GPS instruments and satellites. This model will provide an unprecedented view of how groundwater, the “sixth Great Lake”, affects lake levels across the GLB. We propose a fusion of hydrologic modeling with GPS, InSAR, satellite imagery, and GRACE data to more accurately simulate surface and subsurface flows in the GLB. This will be the first such integration of geodesy (deformation and gravity change), measurements of groundwater-coupled surface water extent from remote sensing, and integrated hydrologic modeling. Through data assimilation, we will produce both historical and nowcast groundwater flow and storage reanalysis products to reveal the spatio-temporal distribution of groundwater across the basin, and relate this to fluctuating lake levels. This will provide reliable information about surface and groundwater storage, lake levels, and flow rates that are needed for water resource management.This award reflects NSF's statutory mission and has been deemed worthy of support through evaluation using the Foundation's intellectual merit and broader impacts review criteria.
了解气候变化和土地利用对水文的复杂和相互交织的影响对于管理水资源是必要的。五大湖流域是世界上最大的地表淡水资源,在过去十年中,湖泊水位从历史最低点急剧上升到历史最高点。尽管进行了超过世纪的湖泊水位测量,但我们并不完全了解是什么导致了五大湖水位的波动。原因之一是,该盆地广泛的地下水资源监测不力,而且在模型中经常被忽视。在这里,我们建议开发一个水文模型,更准确地模拟地表和地下水流,驱动和验证使用地面GPS仪器和卫星的数据。这个模型将提供一个前所未有的视图,地下水,“第六大湖”,如何影响整个GLB的湖泊水位。我们提出了一个融合的水文建模与GPS,干涉合成孔径雷达,卫星图像,和GRACE数据,更准确地模拟地表和地下流动的GLB。这将是第一次将大地测量学(变形和重力变化)、从遥感测量地下水-地表水耦合范围以及综合水文建模结合起来。通过数据同化,我们将产生历史和临近的地下水流量和存储再分析产品,以揭示整个流域的地下水的时空分布,并将其与波动的湖泊水位。这将为水资源管理提供有关地表水和地下水储存、湖泊水位和流速的可靠信息。该奖项反映了NSF的法定使命,并通过使用基金会的知识价值和更广泛的影响审查标准进行评估,被认为值得支持。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Jeffrey Freymueller其他文献

Measuring, modelling and projecting coastal land subsidence
测量、建模和预测沿海地面沉降
  • DOI:
    10.1038/s43017-020-00115-x
  • 发表时间:
    2020-12-10
  • 期刊:
  • 影响因子:
    71.500
  • 作者:
    Manoochehr Shirzaei;Jeffrey Freymueller;Torbjörn E. Törnqvist;Devin L. Galloway;Tina Dura;Philip S. J. Minderhoud
  • 通讯作者:
    Philip S. J. Minderhoud

Jeffrey Freymueller的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Jeffrey Freymueller', 18)}}的其他基金

Collaborative Research: RAPID: Response to the 29 July 2021 Chignik M8.2 Earthquake
合作研究:RAPID:对 2021 年 7 月 29 日奇格尼克 M8.2 地震的响应
  • 批准号:
    2147422
  • 财政年份:
    2021
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Collaborative Research: The M7.8 Simeonof earthquake: Untangling Slip from Seconds to Years across the edge of the Shumagin Seismic Gap
合作研究:M7.8 Simeonof 地震:解开舒马金地震间隙边缘从数秒到数年的滑动
  • 批准号:
    2052558
  • 财政年份:
    2021
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Continuing Grant
Collaborative Research: RAPID Geodetic Field Response to the 2018 Magnitude 7 Anchorage Earthquake
合作研究:2018 年安克雷奇 7 级地震的快速大地测量场响应
  • 批准号:
    1917435
  • 财政年份:
    2019
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Workshop for Alaska EarthScope Synthesis and Future Opportunities in Canada with EON-ROSE: September 2019
与 EON-ROSE 在加拿大举办的阿拉斯加 EarthScope 综合和未来机遇研讨会:2019 年 9 月
  • 批准号:
    1943784
  • 财政年份:
    2019
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Workshop for Alaska EarthScope Synthesis and Future Opportunities in Canada with EON-ROSE: September 2019
与 EON-ROSE 在加拿大举办的阿拉斯加 EarthScope 综合和未来机遇研讨会:2019 年 9 月
  • 批准号:
    1838450
  • 财政年份:
    2018
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Workshop: Re-examining our Grand Challenges in Geodesy; November 8-9, 2018; East Lansing, MI
研讨会:重新审视我们在大地测量学方面的重大挑战;
  • 批准号:
    1842078
  • 财政年份:
    2018
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Collaborative Research: Rheology of asthenosphere in the Kuril-Kamchatka subduction zone from postseismic GPS observations after great earthquakes
合作研究:大地震后震后 GPS 观测的千岛堪察加俯冲带软流圈流变学
  • 批准号:
    1547064
  • 财政年份:
    2016
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Collaborative Research: Ten years later: Resolving the postseismic deformation processes of the 2002 Denali Fault earthquake
合作研究:十年后:解决 2002 年德纳利断层地震的震后变形过程
  • 批准号:
    1417291
  • 财政年份:
    2014
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Continuing Grant
Collaborative research: Probing the effects of 3D rheology on postseismic deformation following the 2011 Tohoku-Oki earthquake
合作研究:探讨 2011 年东北冲地震后 3D 流变学对震后变形的影响
  • 批准号:
    1246927
  • 财政年份:
    2013
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
International Symposium: Reconciling Observations and Models of Elastic and Viscoelastic Deformation due to Ice Mass Change
国际研讨会:协调冰块变化引起的弹性和粘弹性变形的观测结果和模型
  • 批准号:
    1332939
  • 财政年份:
    2013
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant

相似国自然基金

基于PINK1/Parkin介导的线粒体自噬—铁死亡揭示《内经》“五七”后卵巢衰老机制及中药干预研究
  • 批准号:
    82374505
  • 批准年份:
    2023
  • 资助金额:
    50 万元
  • 项目类别:
    面上项目
基于多组学揭示多菌协同发酵普洱茶风味品质形成机制研究
  • 批准号:
    32360771
  • 批准年份:
    2023
  • 资助金额:
    33 万元
  • 项目类别:
    地区科学基金项目
前脑类器官多组学研究揭示L1CAM新发突变致皮层神经元移行与投射障碍
  • 批准号:
    82301345
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
全球农田地表温度时空动态规律揭示与归因研究
  • 批准号:
  • 批准年份:
    2022
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
银川-河套盆地钻孔沉积物源研究及其揭示的黄河上游水系时空演化过程
  • 批准号:
  • 批准年份:
    2022
  • 资助金额:
    54 万元
  • 项目类别:
    面上项目
贺根山-黑河缝合带北段壳-幔精细结构研究——深地震反射剖面的揭示
  • 批准号:
  • 批准年份:
    2021
  • 资助金额:
    30 万元
  • 项目类别:
靶向核酸表观遗传修饰5-羧基胞嘧啶的功能揭示与可逆调控研究
  • 批准号:
  • 批准年份:
    2021
  • 资助金额:
    60 万元
  • 项目类别:
    面上项目
多维度揭示人为干扰下荒漠啮齿动物生态位划分及共存机制研究
  • 批准号:
  • 批准年份:
    2020
  • 资助金额:
    35 万元
  • 项目类别:
    地区科学基金项目
联合动量更新与属性揭示的非凸约束型数据重构算法研究
  • 批准号:
    LY19F030016
  • 批准年份:
    2018
  • 资助金额:
    0.0 万元
  • 项目类别:
    省市级项目
供应商侵入情形下零售商需求信息获取与揭示策略研究
  • 批准号:
    71772070
  • 批准年份:
    2017
  • 资助金额:
    42.0 万元
  • 项目类别:
    面上项目

相似海外基金

EAGER/Collaborative Research: Revealing the Physical Mechanisms Underlying the Extraordinary Stability of Flying Insects
EAGER/合作研究:揭示飞行昆虫非凡稳定性的物理机制
  • 批准号:
    2344215
  • 财政年份:
    2024
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Collaborative Research: Remote Sensing of the Lower Ionosphere during 2024 Solar Eclipse: Revealing the Spatial and Temporal Scales of Ionization and Recombination
合作研究:2024 年日食期间低电离层遥感:揭示电离和重组的时空尺度
  • 批准号:
    2320259
  • 财政年份:
    2024
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Collaborative Research: Remote Sensing of the Lower Ionosphere during 2024 Solar Eclipse: Revealing the Spatial and Temporal Scales of Ionization and Recombination
合作研究:2024 年日食期间低电离层遥感:揭示电离和重组的时空尺度
  • 批准号:
    2320260
  • 财政年份:
    2024
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
EAGER/Collaborative Research: Revealing the Physical Mechanisms Underlying the Extraordinary Stability of Flying Insects
EAGER/合作研究:揭示飞行昆虫非凡稳定性的物理机制
  • 批准号:
    2344214
  • 财政年份:
    2024
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Collaborative Research: RESEARCH PGR: The epigenomic selfing syndrome: revealing the impact of breeding system on epigenomes
合作研究:研究 PGR:表观基因组自交综合症:揭示育种系统对表观基因组的影响
  • 批准号:
    2247915
  • 财政年份:
    2023
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Continuing Grant
Collaborative Research: Revealing the changing trophic niches of large herbivorous fish on modern coral reefs using an interdisciplinary approach
合作研究:利用跨学科方法揭示现代珊瑚礁上大型草食性鱼类营养生态位的变化
  • 批准号:
    2232883
  • 财政年份:
    2023
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Collaborative Research: Revealing the changing trophic niches of large herbivorous fish on modern coral reefs using an interdisciplinary approach
合作研究:利用跨学科方法揭示现代珊瑚礁上大型草食性鱼类营养生态位的变化
  • 批准号:
    2232882
  • 财政年份:
    2023
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
Collaborative Research: RESEARCH PGR: The epigenomic selfing syndrome: revealing the impact of breeding system on epigenomes
合作研究:研究 PGR:表观基因组自交综合症:揭示育种系统对表观基因组的影响
  • 批准号:
    2247914
  • 财政年份:
    2023
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Continuing Grant
Collaborative Research: Revealing Strengthening and Toughening Mechanisms in Coconut Endocarp through Integrated Multiscale Modeling and Characterization
合作研究:通过综合多尺度建模和表征揭示椰子内果皮的强化和增韧机制
  • 批准号:
    2316676
  • 财政年份:
    2023
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Continuing Grant
Collaborative Research: Revealing the changing trophic niches of large herbivorous fish on modern coral reefs using an interdisciplinary approach
合作研究:利用跨学科方法揭示现代珊瑚礁上大型草食性鱼类营养生态位的变化
  • 批准号:
    2232881
  • 财政年份:
    2023
  • 资助金额:
    $ 95.73万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了