Distribution Network Resilience Enhancement with Topological Neural Networks

Distribution Network Resilience Enhancement with Topological Neural Networks
利用拓扑神经网络增强配电网弹性
批准号:
2229417
负责人:
Baris Coskunuzer
金额:
$34.99万
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
2023
资助国家:
美国
项目状态:
未结题
起止时间:
2023-01-01 至 2025-12-31

项目摘要

项目成果

Baris Coskunuzer的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The number of outages caused by severe weather as a result of climate change rose from about 50 annually nationwide in the early 2000s to over 100 annually on average over the past five years. With the increasing trend of cyber-physical threats and extreme weather events due to climate change, resilience of the power network has emerged as a problem of utmost societal importance. By facilitating the cross-disciplinary exchange of ideas, this project will develop a novel geometric deep learning model to significantly improve the security, reliability, and efficiency of the modern power grid by leveraging clean energy resources – thereby, impacting the safety and economic well-being of our society across a broad front. The project will provide training opportunities to graduate students. In particular, the PIs will develop a novel geometric deep learning model supported with topological data analysis tools for robust decision-making and efficient knowledge transfer for disruptions with time-dominant characteristics, particularly focusing on predicting the distribution network evolution and operational decisions (by leveraging distributed energy resources and clean energy resources) for resilience under disruptive events such as natural disasters and adversarial attacks. Envisioned gains in generalizability, robustness and learning efficiency via knowledge-transfer (across events and operation timescales) will be demonstrated by studying response and recovery operation problems in power grids. The developed model will be applied to enhance the resilience of the power distribution network under disruptive events, ranging from preparatory to restorative tasks. The pre-emptive measures adopted include (i) outage prediction and defensive islanding, while (ii) network reconfiguration is used as a restorative action.This award reflects NSF's statutory mission and has been deemed worthy of support through evaluation using the Foundation's intellectual merit and broader impacts review criteria.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
ATD: Predictive Anomaly Detection for Spatio-Temporal Data with Multidimensional Persistence
  • 批准号:
    2220613
  • 项目类别:
    Standard Grant
  • 资助金额:
    $10.0万
  • 财政年份:
    2023
  • 负责人:
    Baris Coskunuzer
  • 依托单位:
Minimal Surfaces in Hyperbolic 3-Manifolds
  • 批准号:
    2202584
  • 项目类别:
    Standard Grant
  • 资助金额:
    $11.49万
  • 财政年份:
    2022
  • 负责人:
    Baris Coskunuzer
  • 依托单位:
Algorithms for Modern Power Systems PI Workshop
  • 批准号:
    1841312
  • 项目类别:
    Continuing Grant
  • 资助金额:
    $4.95万
  • 财政年份:
    2018
  • 负责人:
    Baris Coskunuzer
  • 依托单位:
国内基金
海外基金
丝氨酸/甘氨酸/一碳代谢网络(SGOC metabolic network)调控炎症性巨噬细胞活化及脓毒症病理发生的机制研究
  • 批准号:
    81930042
  • 项目类别:
    重点项目
  • 资助金额:
    305.0万元
  • 批准年份:
    2019
  • 负责人:
    王迪
  • 依托单位:
多维在线跨语言Calling Network建模及其在可信国家电子税务软件中的实证应用
  • 批准号:
    91418205
  • 项目类别:
    重大研究计划
  • 资助金额:
    170.0万元
  • 批准年份:
    2014
  • 负责人:
    郑庆华
  • 依托单位:
基于Wireless Mesh Network的分布式操作系统研究
  • 批准号:
    60673142
  • 项目类别:
    面上项目
  • 资助金额:
    27.0万元
  • 批准年份:
    2006
  • 负责人:
    罗惠琼
  • 依托单位: