Logistical Planning Problems in Disaster Relief: Simultaneous Operational Planning for RoadClearance Operations and Relief Distribution

Logistical Planning Problems in Disaster Relief: Simultaneous Operational Planning for RoadClearance Operations and Relief Distribution
救灾中的后勤规划问题:道路清理作业和救灾物资分配的同步作业规划
批准号:
386302536
负责人:
Professor Dr. Alf Kimms
金额:
$0.0万
依托单位国家:
德国
项目类别:
Research Grants
财政年份:
2017
资助国家:
德国
项目状态:
已结题
起止时间:
2016-12-31 至 2019-12-31

项目摘要

项目成果

Professor Dr. Alf Kimms的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
In the first days and weeks after a natural disaster struck (e.g. earthquake or tsunami), the most urgent task is to transport relief goods as well as search and rescue teams as fast as possible to the affected regions in order to alleviate the suffering of the disaster victims. In this first phase of disaster relief a fast and efficient relief distribution is regularly hampered by blocked roads. Because of fallen trees, landslides or debris parts of the road network are impassable, so that affected villages are completely cut off or vehicles have to make time-consuming detours to transport relief goods to these places.From a methodological point of view, two planning problems arise. On the hand relief goods have to be delivered as fast as possible with a fleet of capacity constrained vehicles. On the other hand the cooperative operation of clearance crews with different abilities and equipment has to be scheduled in order to clear blocked roads, so that these roads are passable for vehicles loaded with relief goods in a timely manner. Both planning problems are interdependent, as on the one side order and duration of the road clearance operations influence the speed of the relief distribution. On the other side visiting order and arrival times at the demand nodes within relief distribution have an effect on the scheduling of the road clearance operations. Thus, both planning problems have to be tackled simultaneously in an integrated approach, so that road clearance operations and relief distribution are coordinated in order to achieve an equal coverage of the disaster victims. Up to now only a few articles in the scientific literature have tackled this combined planning problem. Diverse relevant aspects of the problem have not yet been considered. Therefore, pursuing the development of mathematical models and solution algorithms for simultaneous planning of road clearance operations and relief distribution is the aim of this intended project.
期刊论文(1)
专著(0)
科研奖励(0)
会议论文
DOI: 10.1007/s00291-020-00589-7
发表时间: 2020-04-27
期刊: OR SPECTRUM
影响因子: 2.7
作者: [Briskorn, Dirk, Kimms, Alf, Olschok, Denis]
通讯作者: Olschok, Denis
Cooperative Routing Problems under a Rolling Horizon Framework