Supplement for compensation of additional construction costs for the central plot experiment of PP 2089 at the field station Bad Lauchstädt

巴特劳赫施塔特 (Bad Lauchstädt) 野外站 PP 2089 中心地块实验额外建设费用补偿补助

基本信息

项目摘要

The current proposal is an addition to the approved coordination proposal of the priority program 2089 ‘Rhizosphere spatiotemporal organisation – a key to rhizosphere functions’. This supplement is required as the estimated costs for the establishment of the central soil plot experiment at the field station Bad Lauchstädt, required by most research groups of PP 2089, increased by 58% . The reasons for the financial gap are:• the general increase in construction costs from 2017 to 2018 by about 6%• the short bid period combined with high capacity utilization of building industry (project approval 10/07/2018; work has to be conducted before winter)• more detailed specification of excavation work (Annex I, 3.1, 3.2) (vertical side walls – tolerance ± 5 cm; compaction of soil layers with a light weight vibrator) • larger requirement of form-work panels to reduce pressure load (Annex I, 5.1)• supplier of quartz sand had to be changed as the foreseen supplier is not able to provide the necessary amount in the required quality (free of carbonate) (Annex I, 7.2).The financial gap is too large to be covered by cutbacks in other positions of the coordination project. Hence without the supplement the central plot experiment is at risk. Alternatively the coordination project cannot fulfill its original tasks (sampling and analysis of shoot, root and soil samples in the field plot experiment throughout the three year period, organisation of annual meetings, synthesis, scientific board including travel expenses, international conference, workshop/tutorials, and young investigator meetings).
目前的提案是对2089年优先计划“根际时空组织-根际功能的关键”的已批准协调提案的补充。本补充资料是在Bad Lauchstädt野外站建立中央土壤试验的估计成本,PP 2089的大多数研究小组都要求进行该试验, 增长了58%。资金缺口的原因是: 2017年至2018年建筑成本普遍上涨约6%· 投标期短,建筑业产能利用率高 (项目批准10/07/2018;工作必须在冬季之前进行)· 开挖工程的更详细规范(附录I,3.1,3.2) (垂直侧壁-公差± 5 cm;使用轻型振动器压实土层)· 为减少压力荷载,模板要求更高(附录I,5.1)· 由于预期的供应商无法提供所需质量的必要数量(不含碳酸盐),因此必须更换石英砂供应商(附件一,7.2)。财务缺口太大,无法通过削减其他职位来弥补协调项目。因此,如果没有补充剂,中心区实验就处于危险之中。或者,协调项目无法完成其最初的任务(在整个三年期间的田间小区试验中对芽、根和土壤样品进行取样和分析,组织年度会议,综合,科学委员会,包括差旅费,国际会议,研讨会/辅导,以及青年研究者会议)。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Professorin Dr. Doris Vetterlein其他文献

Professorin Dr. Doris Vetterlein的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Professorin Dr. Doris Vetterlein', 18)}}的其他基金

Durch Pflanzen induzierte Heterogenität des osmotischen Potentials in Böden. Bedeutung für Wasseraufnahme und Wachstum der Pflanzen
植物引起的土壤渗透势异质性。
  • 批准号:
    5197822
  • 财政年份:
    1999
  • 资助金额:
    --
  • 项目类别:
    Research Grants
Coordination Funds
协调基金
  • 批准号:
    403801423
  • 财政年份:
  • 资助金额:
    --
  • 项目类别:
    Priority Programmes

相似海外基金

Collaborative Research: NSFDEB-NERC: Warming's silver lining? Thermal compensation at multiple levels of organization may promote stream ecosystem stability in response to drought
合作研究:NSFDEB-NERC:变暖的一线希望?
  • 批准号:
    2312706
  • 财政年份:
    2024
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
Examining the Function of a Novel Protein in the Cardiac Junctional Membrane Complex
检查心脏连接膜复合体中新型蛋白质的功能
  • 批准号:
    10749672
  • 财政年份:
    2024
  • 资助金额:
    --
  • 项目类别:
Bilingualism as a cognitive reserve factor: the behavioral and neural underpinnings of cognitive control in bilingual patients with aphasia
双语作为认知储备因素:双语失语症患者认知控制的行为和神经基础
  • 批准号:
    10824767
  • 财政年份:
    2024
  • 资助金额:
    --
  • 项目类别:
NSFDEB-NERC: Warming's silver lining? Thermal compensation at multiple levels of organization may promote ecosystem stability in response to drought
NSFDEB-NERC:变暖的一线希望?
  • 批准号:
    NE/Y00549X/1
  • 财政年份:
    2024
  • 资助金额:
    --
  • 项目类别:
    Research Grant
Naturalistic Social Communication in Autistic Females: Identification of Speech Prosody Markers
自闭症女性的自然社交沟通:语音韵律标记的识别
  • 批准号:
    10823000
  • 财政年份:
    2024
  • 资助金额:
    --
  • 项目类别:
Collaborative Research: NSFDEB-NERC: Warming's silver lining? Thermal compensation at multiple levels of organization may promote stream ecosystem stability in response to drought
合作研究:NSFDEB-NERC:变暖的一线希望?
  • 批准号:
    2312707
  • 财政年份:
    2024
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
Collaborative Research: Improving Worker Safety by Understanding Risk Compensation as a Latent Precursor of At-risk Decisions
合作研究:通过了解风险补偿作为风险决策的潜在前兆来提高工人安全
  • 批准号:
    2326937
  • 财政年份:
    2023
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
A Study on Implementation Method of Highly Efficient Motion Compensation Prediction Scheme Using DNN in Video Coding
视频编码中DNN高效运动补偿预测方案的实现方法研究
  • 批准号:
    23K03843
  • 财政年份:
    2023
  • 资助金额:
    --
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
eCD4-mediated control of SIV infection in the brain
eCD4 介导的脑部 SIV 感染控制
  • 批准号:
    10698442
  • 财政年份:
    2023
  • 资助金额:
    --
  • 项目类别:
Dynamic neural coding of spectro-temporal sound features during free movement
自由运动时谱时声音特征的动态神经编码
  • 批准号:
    10656110
  • 财政年份:
    2023
  • 资助金额:
    --
  • 项目类别:
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了