Development of an Analysis Methods for the Progressive Failure of Discontinuous Solids
Development of an Analysis Methods for the Progressive Failure of Discontinuous Solids
批准号:
12450175
负责人:
HORII Hideyuki
金额:
$7.49万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (B)
财政年份:
2000
资助国家:
日本
项目状态:
已结题
起止时间:
2000 至 2002
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Deformation in excavation disturbed zone is investigated by a model tunnel of high level nuclear waste repository. The experiment is conducted using artificial soft rock under a plane strain condition. The deformation is measured by a newly developed measurement system which consists of a microscope and a high precision X-Y stage. From the experiment, it is clarified that a wedge shaped damaged zone is formed during the course of stress redistribution. Taking into account the result of the experiment new tunnel design concept is proposed, in which the formation of the wedge shaped damaged zone is considered to be the final stage of tunnel breakage. A numerical analysis method is developed by introducing an interface element which enables us to analyze propagation of rupture zone and the formation of the wedge shaped damaged zone. From the analysis, it is shown that the design depth is deepened by adopting a formation of rapture zone in the excavation disturbed zone. In the present study, creep experiment is also conducted using artificial soft rock, in order to clarify the mechanism of creep rapture. In the experiment, displacement field is measured by the measurement system developed in the present study. From the experiment, the deformation field is heterogeneous from the very first stage of stress state, in the case of high state, in the case of high stress level which is comparable with the capacity of the material. On the contrary, in the cased of low stress level, the deformation field is almost homogeneous and the shear band which is observed almost from the beginning of a test in the case of high stress level is not formed until the creep rapture takes place. From the experiment, it is clarified that the development of a model based on the mechanism of creep rapture and localization mode is indispensable in order to evaluate long term safety of underground structures, in which the creep rupture becomes a dominant problem to be clarified.
期刊论文(60)
专著(0)
科研奖励(0)
会议论文
登录
查看更多内容
Keisuke Hibiya, Takayuki Mori, Seiji Morikawa, Kazuto Tabei, Naoto Goto, Hideyuki Horii, Hidenori Yoshida: "Parameter analysis of MBC model for underground caver"EUROCK. (2001)
Keisuke Hibiya、Takayuki Mori、Seiji Morikawa、Kazuto Tabei、Naoto Goto、Hideyuki Horii、Hidenori Yoshida:“地下探洞 MBC 模型的参数分析”EUROCK。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
堀井秀之 他: "節理性岩盤を対象とした各種解析手法による要素解析結果の比較"土木学会論文集. No.659 III-52. 229-240 (2000)
Hideyuki Horii 等:“使用节理岩石的各种分析方法的元素分析结果的比较”日本土木工程师学会会议录第 659 III-52 号(2000 年)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
堀井秀之 他: "等価連続体解析手法による塩原発電所空洞掘削時挙動の比較検討"土木学会論文集. No.659 III-52. 211-227 (2000)
Hideyuki Horii 等人:“使用等效连续介质分析方法对盐原发电厂空腔开挖过程中的行为进行比较研究”,日本土木工程师学会会刊第 659 III-52 号(2000 年)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
H.M.Kim, M.Kuwabara, J.Inoue, H.Horii: "Evaluation of the change in permeability of jointed rock mass due to excavation using micromechanics-based continuum (MBC)model"Rock Mechanics in the National Interest, Swets & Zeitlinger Lisse. 721-728 (2001)
H.M.Kim、M.Kuwabara、J.Inoue、H.Horii:“使用基于微力学的连续介质 (MBC) 模型评估节理岩体渗透性变化”《国家利益中的岩石力学》,Swets
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
M.Sawada, H.Horii, H.Yoshida: "Analysis of Hydraulic Fracturing and Circulation Test in Hot Dry Rock Project"Journal of Geotechnical Engineering. No.680, III-55. 109-121 (2001)
M.Sawada、H.Horii、H.Yoshida:《干热岩工程水力压裂与循环试验分析》岩土工程学报。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
共 30 条
Political Process Analysis of the dispute processes in Toyo-cho, Japan and Wellenberg, Switzerland regarding radioactive waste disposal siting
-
批准号:21360465
-
项目类别:Grant-in-Aid for Scientific Research (B)
-
资助金额:$8.82万
-
财政年份:2009
-
负责人:HORII Hideyuki
-
依托单位:
Mechanics of Discontinuous Solids for the Safety Evaluation of Nuclear Waste Disposal- Development of Coupled Flow Analysis Method
-
批准号:13555127
-
项目类别:Grant-in-Aid for Scientific Research (B)
-
资助金额:$5.76万
-
财政年份:2001
-
负责人:HORII Hideyuki
-
依托单位:
Development of a numerical method and proposal of design method for structures in discontinuous rock
-
批准号:10555151
-
项目类别:Grant-in-Aid for Scientific Research (B)
-
资助金额:$5.57万
-
财政年份:1998
-
负责人:HORII Hideyuki
-
依托单位:
Development of theory and analysis method for localization and progressive failure
-
批准号:10450166
-
项目类别:Grant-in-Aid for Scientific Research (B)
-
资助金额:$8.13万
-
财政年份:1998
-
负责人:HORII Hideyuki
-
依托单位:
Constitutive modeling of jointed rock mass and development of measurement system with bore hole television
-
批准号:06452262
-
项目类别:Grant-in-Aid for General Scientific Research (B)
-
资助金额:$4.29万
-
财政年份:1994
-
负责人:HORII Hideyuki
-
依托单位:
Establishment of fracture mechanics based design method for SFRC tunnel lining
-
批准号:06555131
-
项目类别:Grant-in-Aid for Developmental Scientific Research (B)
-
资助金额:$4.48万
-
财政年份:1994
-
负责人:HORII Hideyuki
-
依托单位:
Establishment of analysis method for crack growth in concrete and rock
-
批准号:04555106
-
项目类别:Grant-in-Aid for Developmental Scientific Research (B)
-
资助金额:$3.52万
-
财政年份:1992
-
负责人:HORII Hideyuki
-
依托单位:
Design method of frame structures with effective length based on eigen value analysis
-
批准号:60850087
-
项目类别:Grant-in-Aid for Developmental Scientific Research
-
资助金额:$2.75万
-
财政年份:1985
-
负责人:HORII Hideyuki
-
依托单位:
海外基金