Changes in sediment flux eroded from landuse system of Rim Pacific gee-systems during past 200 years
过去200年环太平洋吉系统土地利用系统侵蚀的沉积物通量变化
基本信息
- 批准号:13460066
- 负责人:
- 金额:$ 8.13万
- 依托单位:
- 依托单位国家:日本
- 项目类别:Grant-in-Aid for Scientific Research (B)
- 财政年份:2001
- 资助国家:日本
- 起止时间:2001 至 2004
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
This research project focused the changes in sediment flux linking with earth surface changes during recent 200 years in Pacific-rim Gee-systems. Totally 30 papers, four books and more than 10 proceedings concerning with this interest have been presented. Joint research programs with USA, New Zealand, Australia and China were also developed through this research project.The environmental factors such as geomorphologic structure, ecosystem, and landscape changes caused by human activities have studied from the view point of sediment production volume, sediment storage volume and sediment delivery volume expected. The actual observation for this project has been done in Oyabu catchment, Kyushu Island, Tenryu catchment, Nagano, and Saru Catchment, Hokkaido. In terms of comparing Japanese catchments with overseas catchment, Waiapu River basin, New Zealand, has additionally analyzed.Results are as follows.(1)Downstream change in fine particle sediment that reflected from earth surface changes were cleared (Kim et al.,2002 Kim et al.2003)(2)Relationship between catchment-scale geomorphology (catchment area, shape and drainage net) and patch-mosaic ecological tone such as forest and rural area using GIS was related with sediment production, storage and delivery (Ebisu et al.,2003 ; Itou et al., submitted).(3)Propagation and interaction between earth surface environment and sediment production, which has been successfully analyzed using the remote sensing system, were identified (Kikuchi,2003 ; Kunihuro et al.,2003 ; Mitsuda et al.,2003).(3)As a result the model developed in this study was applied to expect the sediment flux succeeding from 200 years changes in sedimentary system of Pacific-rim(Ebisu et al., submitted ; Kasai and Marutani,2004).
本研究主要研究环太平洋地区近200年来沉积物通量的变化与地表变化的关系。共提交了30篇关于这一兴趣的论文、4本书和10多个论文集。该研究项目还与美国、新西兰、澳大利亚和中国开展了联合研究项目,从产沙量、蓄沙量和预期输沙量的角度研究了人类活动引起的地貌结构、生态系统和景观变化等环境因素。该项目的实际观测已经在九州岛的大亚部流域、长野的天龙流域和北海道的Saru流域进行。在比较日本流域和国外流域的基础上,对新西兰怀阿普河流域进行了进一步的分析。结果表明:(1)从地表变化中反映出来的细颗粒泥沙在下游的变化(Kim等人,2002,Kim等人,2003);(2)基于地理信息系统的流域尺度地貌(流域面积、形状和排水网)与森林和农村等斑块镶嵌生态基调的关系与泥沙的产生、储存和输送有关(EBisu等人,2003;(3)利用遥感系统成功地分析了地球表面环境和沉积物产生之间的传播和相互作用(Kikuchi,2003;Kunihuro等人,2003;Mitsuda等人,2003)。(3)因此,本研究中开发的模型被用于预测太平洋边缘沉积系统200年来变化后的沉积物通量(EBisu等人,提交;Kasai和Marutani,2004年)。
项目成果
期刊论文数量(124)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
Patterns and control of gully complex development in a headwater catchment of the Waiapu Basin, East Coast, New Zealand
新西兰东海岸怀阿普盆地源头流域沟壑复杂发育的模式和控制
- DOI:
- 发表时间:2004
- 期刊:
- 影响因子:0
- 作者:Parkner T.
- 通讯作者:Parkner T.
The sediment budget approach : based on the Western experiences
沉积物预算方法:基于西方经验
- DOI:
- 发表时间:2003
- 期刊:
- 影响因子:0
- 作者:Parkner T.;Kasai M.;Kasai M.;丸谷知己;栫 美和;中村友輔;清水 収;光田 靖;丸谷 知己;中村 友輔;清水 収;光田 靖;清水 収;吉永子規;Marutani T.;Marutani T.;Parkner T.
- 通讯作者:Parkner T.
Yatate Creek and Oyabu River
矢立溪和大矢部川
- DOI:
- 发表时间:2001
- 期刊:
- 影响因子:0
- 作者:Kikuchi;S.;吉田まりな;国広靖志;中村友輔;中村友輔;冨永梢子;Kano M.;光田 靖;Kim H.;Kim H.;Kasai M.;Kasai M.
- 通讯作者:Kasai M.
Hoon Kim, Tomomi Marutani: "Scale dependant, seasonal changes in suspended sediment load from the mountainous catchments of Nagano, Japan"Interpraevent 2002 in the Pacific Rim. 1. 41-52 (2002)
Hoon Kim、Tomomi Marutani:“日本长野山区流域悬浮沉积物负荷的尺度依赖性、季节变化”Interpraevent 2002 年环太平洋地区。
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
Kim H, Marutani T: "Scale dependant, seasonal changes in suspended sediment load from the mountainous catchments of Nagano, Japan"Proceedings of Interpraevent 2002 in the Pacific Rim. 1. (2002)
Kim H、Marutani T:“日本长野山区集水区悬浮沉积物负荷的规模依赖性、季节变化”环太平洋地区 Interpraevent 2002 会议记录。
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
MARUTANI Tomomi其他文献
MARUTANI Tomomi的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('MARUTANI Tomomi', 18)}}的其他基金
Debris flow mitigation with water absorption
通过吸水缓解泥石流
- 批准号:
26660120 - 财政年份:2014
- 资助金额:
$ 8.13万 - 项目类别:
Grant-in-Aid for Challenging Exploratory Research
Lahar-induced disturbance of naturalresources and recovery from volcanic disaster at the Ruapehu volcano, North Island, New Zealand
新西兰北岛鲁阿佩胡火山火山泥流引起的自然资源扰动和火山灾害恢复
- 批准号:
17405002 - 财政年份:2005
- 资助金额:
$ 8.13万 - 项目类别:
Grant-in-Aid for Scientific Research (B)
Storm-induced disturbance on earth surface processes and risk management for sedimentarysystems
风暴对地表过程的扰动和沉积系统的风险管理
- 批准号:
17208012 - 财政年份:2005
- 资助金额:
$ 8.13万 - 项目类别:
Grant-in-Aid for Scientific Research (A)
Disturbance and recovery of riparian and fresh water ecosystem caused by sediment transport associated with flood events
洪水事件引起的泥沙输送对河岸和淡水生态系统的干扰和恢复
- 批准号:
09460071 - 财政年份:1997
- 资助金额:
$ 8.13万 - 项目类别:
Grant-in-Aid for Scientific Research (B)
Flood process based on disturbance and recovery of forest
基于森林扰动与恢复的洪水过程
- 批准号:
02660161 - 财政年份:1990
- 资助金额:
$ 8.13万 - 项目类别:
Grant-in-Aid for General Scientific Research (C)
相似海外基金
Impact of horst and graben subduction on sediment flux and shallow décollement geometry in the Japan Trench
地垒和地堑俯冲对日本海沟沉积物通量和浅层滑脱几何形状的影响
- 批准号:
2103514 - 财政年份:2021
- 资助金额:
$ 8.13万 - 项目类别:
Standard Grant
Collaborative Research: Reconstructing paleo-sediment flux from river deposits: toward quantifying sediment discharge from bedform to basin scale
合作研究:从河流沉积物重建古沉积物通量:量化从河床形态到盆地规模的沉积物排放
- 批准号:
1935513 - 财政年份:2020
- 资助金额:
$ 8.13万 - 项目类别:
Standard Grant
Collaborative Research: Reconstructing paleo-sediment flux from river deposits: toward quantifying sediment discharge from bedform to basin scale
合作研究:从河流沉积物重建古沉积物通量:量化从河床形态到盆地规模的沉积物排放
- 批准号:
1935669 - 财政年份:2020
- 资助金额:
$ 8.13万 - 项目类别:
Standard Grant
Development of an estimation system of high resolution and frequency coastal depth map and longshore sediment flux
高分辨率频率海岸深度图和沿岸泥沙通量估算系统的开发
- 批准号:
19H02244 - 财政年份:2019
- 资助金额:
$ 8.13万 - 项目类别:
Grant-in-Aid for Scientific Research (B)
Sediment flux in and around the Sor Rondans Mountains in East Antarctica
东南极洲索罗丹斯山脉及其周围的沉积物通量
- 批准号:
2271855 - 财政年份:2019
- 资助金额:
$ 8.13万 - 项目类别:
Studentship
[Philippines] Catchment susceptibility to hydrometeorological events: sediment flux and geomorphic change as drivers of flood risk in the Philippines
[菲律宾] 流域对水文气象事件的敏感性:泥沙通量和地貌变化是菲律宾洪水风险的驱动因素
- 批准号:
NE/S003312/1 - 财政年份:2018
- 资助金额:
$ 8.13万 - 项目类别:
Research Grant
Spatiotemporal Dynamics of Bedload Sediment Flux in Large Rivers
大江河床沙通量时空动态
- 批准号:
1561082 - 财政年份:2016
- 资助金额:
$ 8.13万 - 项目类别:
Standard Grant
Estimation of longshore sediment flux from remote sensing data
根据遥感数据估算沿岸泥沙通量
- 批准号:
16K06502 - 财政年份:2016
- 资助金额:
$ 8.13万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
High-precision sediment flux measurement and integrated sediment transport evaluation in swash zone
斜流带高精度泥沙通量测量及输沙综合评价
- 批准号:
26289161 - 财政年份:2014
- 资助金额:
$ 8.13万 - 项目类别:
Grant-in-Aid for Scientific Research (B)
Establishment of sediment flux measurement and bathymetric survey system for river-sea estuary system
江海河口系统泥沙通量测量及水深测量系统的建立
- 批准号:
25420516 - 财政年份:2013
- 资助金额:
$ 8.13万 - 项目类别:
Grant-in-Aid for Scientific Research (C)