课题基金 / 基金详情

Heuristic Scheduling in Machining-Assembly Flowshop under Supply Chain Environment

Heuristic Scheduling in Machining-Assembly Flowshop under Supply Chain Environment
供应链环境下加工装配流水作业启发式调度
批准号:
17510130
负责人:
MORIZAWA Kazuko
金额:
$0.9万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (C)
财政年份:
2005
资助国家:
日本
项目状态:
已结题
起止时间:
2005 至 2006

项目摘要

项目成果

MORIZAWA Kazuko的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
This research dealt with scheduling problems to minimize makespan in a flexible manufacturing cell(FMC). FMC has attracted manufactures because it is effective for machining various component parts and assembling them into many kinds of products in a small lot to meet a rapid change in production-mix and its demand. We formulated the FMCs as machining-assembly flowshop(MAFS) models to minimize makespan and proposed two types of heuristic algorithms for finding a near optimum schedule to this problem efficiently.One of the proposed algorithms is a heuristic algorithm, in which some promising schedules for the original MAFS model are found by applying NEH algorithm to converted virtual flowshop models in various ways, and then better schedules are searched by applying some job-moving strategies, such as Johnson-rule-based strategy, critical-job/line-based strategies, to the schedules.Another one is a Branch-and-Bound(B&B) based local search algorithms, which searches neighborhood of initial schedules in an enumerative manner by using a branching procedure in a branch-and-bound algorithm. In this algorithm, some initial schedules are found first by using promising heuristic methods, and then a B&B-based parallel local search is implemented for obtaining an optimal(or a near-optimal) schedule.Numerical experiments were implemented to demonstrate that booth of the proposed algorithms can efficiently provide a nearoptimum schedule with high accuracy such as mean relative error being less than 1% and the maximum relative error being at most 3%.Extension of the proposed algorithms to the case of dynamic and multiobjective scheduling will be one of our future works.
期刊论文(10)
专著(0)
科研奖励(0)
会议论文
List-based Branch-and-Bound Algorithm for Minimizing Makespan in a Machine-unfixed, Machining-Assembly Flowshop Scheduling Problem
基于列表的分支定界算法,用于最小化机器未固定的加工装配流水作业调度问题中的完工时间
DOI: --
发表时间: 2005
期刊: Journal of Japan Industrial Management Association Vol.56, No.5
影响因子: --
作者: [K.Tsuchimoto, K.Morizawa, H.Nagasawa]
通讯作者: H.Nagasawa
DOI: --
发表时间: 2006
期刊: 日本経営工学会平成18年度秋季研究大会予稿集
影响因子: --
作者: [今井啓裕, 平林直樹, 長沢啓行]
通讯作者: 長沢啓行
List-based Squeezing Branch and Bound Algorithm for Flowshop Scheduling Problems
基于列表的流水作业调度问题的挤压分支定界算法
DOI: --
发表时间: 2005
期刊: Proceedings of 18th International Conference on Production Research CD-ROM
影响因子: --
作者: [K.Morizawa, H.Nagasawa]
通讯作者: H.Nagasawa
Dynamic Layout Method using Evolution Strategies in Case of Different Areas of Facilities
不同设施区域情况下采用演化策略的动态布局方法
DOI: --
发表时间: 2005
期刊: Proceedings of 18th International Conference on Production Research CD-ROM
影响因子: --
作者: [N.Hirabayashi, H.Nagasawa]
通讯作者: H.Nagasawa
7
    A nurse scheduling system under the situation of temporary shortage of nurses
    • 批准号:
      22510157
    • 项目类别:
      Grant-in-Aid for Scientific Research (C)
    • 资助金额:
      $1.83万
    • 财政年份:
      2010
    • 负责人:
      MORIZAWA Kazuko
    • 依托单位:
    A nurse scheduling system for rerostering following a sudden absence of nurses
    • 批准号:
      19510151
    • 项目类别:
      Grant-in-Aid for Scientific Research (C)
    • 资助金额:
      $2.0万
    • 财政年份:
      2007
    • 负责人:
      MORIZAWA Kazuko
    • 依托单位:
    海外基金