课题基金 / 基金详情

Robust Framework Design for Electric Power Market with Supply Stability

Robust Framework Design for Electric Power Market with Supply Stability
供应稳定的电力市场稳健框架设计
批准号:
17560752
负责人:
TEZUKA Tetsuo
金额:
$2.18万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (C)
财政年份:
2005
资助国家:
日本
项目状态:
已结题
起止时间:
2005 至 2006

项目摘要

项目成果

TEZUKA Tetsuo的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The deregulation trend in the electric power market since 1980's is partly due to the anticipation that introducing a pool market boosts the power companies' competitiveness and also lowers the electricity prices. Through California Electricity Crisis, however, it has been well understood that a pool market principle sometimes leads to the investment circumspection and the resultant price fluctuation. In general, power companies in the locally-monopolized market can easily invest in power-generation plants so as to meet the power demand, and the deregulation of the power industry inevitably makes the investment more risky. Furthermore, there have been invented no rules for making sufficient incentives in strategic investment. Stabilization of the power supply under the deregulated power market is an important requirement for the deregulated framework of the power market.This study aims to develop a simulation model of the deregulated power market and to propose the design method for the appropriate market rules that can stabilize the power prices. The market mechanism for the liberalized market needs to stabilize the market under variety of decision-making algorithms of stakeholders. However the strict market rules prevent stakeholders from joining the trading. The proposed design method may avoid the undesirable unstable behavior under the prepared decision-making algorithm-sets. The market rules are decided so that the desirability indicator such as the stability of the market price may be maximized. The decision-making models for plant-investment have been made through experimental economics method. And the desirable rule sets have been investigated based on the simulation-based simulation methods. The effectiveness of the proposed method was demonstrated through the simulation study.
期刊论文(6)
专著(0)
科研奖励(0)
会议论文
Robust Framework Design for Electric Power Market by Simulation-Based Experiment
基于仿真实验的电力市场鲁棒框架设计
DOI: --
发表时间: 2006
期刊: ENERGEX 2006, Norway (CD-ROM)
影响因子: --
作者: [Shenghua Cai, Tetsuo Tezuka]
通讯作者: Tetsuo Tezuka
Market Power and Trading Strategies on the Electricity Market : a Market Design View
电力市场的市场力量和交易策略:市场设计视角
DOI: --
发表时间: 2006
期刊: IEEE Transaction on Power Systems Vol. 21, No. 3
影响因子: --
作者: [Walter Reinisch, Tetsuo Tezuka]
通讯作者: Tetsuo Tezuka
自由化電力市場における原油価格の上昇の影響分析-シミュレーション・モデルを用いたアプローチ-
原油价格上涨对电力市场自由化的影响分析——使用模拟模型的方法——
DOI: --
发表时间: 2006
期刊: 電気学会論文誌C部門 Vol. 126-C、 No. 1
影响因子: --
作者: [米谷龍幸, 手塚哲央]
通讯作者: 手塚哲央
Measures for promoting Renewable Energy Introduction by taking Nested Decentralized Autonomous Decision-making Structure
  • 批准号:
    21560881
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
  • 资助金额:
    $2.83万
  • 财政年份:
    2009
  • 负责人:
    TEZUKA Tetsuo
  • 依托单位:
Framework Design for Deregulated Electricity Market based on the decentralized Simulation Environment
  • 批准号:
    15560733
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
  • 资助金额:
    $1.79万
  • 财政年份:
    2003
  • 负责人:
    TEZUKA Tetsuo
  • 依托单位:
Open Simulation Framework for Deregulated Electric Power Market
  • 批准号:
    13680575
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
  • 资助金额:
    $2.11万
  • 财政年份:
    2001
  • 负责人:
    TEZUKA Tetsuo
  • 依托单位:
海外基金