Framework Design for Deregulated Electricity Market based on the decentralized Simulation Environment
Framework Design for Deregulated Electricity Market based on the decentralized Simulation Environment
批准号:
15560733
负责人:
TEZUKA Tetsuo
金额:
$1.79万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (C)
财政年份:
2003
资助国家:
日本
项目状态:
已结题
起止时间:
2003 至 2004
中文摘要
点击翻译按钮获取中文摘要
英文摘要
The deregulation trend in the electric power market since 1980's is partly due to the anticipation that introducing a pool market boosts the power companies' competitiveness and also lowers the electricity prices. Through California Electricity Crisis, however, it has been well understood that a pool market principle sometimes leads to the investment circumspection and the resultant price fluctuation. In general, power companies in the locally-monopolized market can easily invest in power-generation plants so as to meet the power demand, and the deregulation of the power industry inevitably makes the investment more risky. Furthermore, there have been invented no rules for making sufficient incentives in strategic investment. Stabilization of the power supply under the deregulated power market is an important requirement for the deregulated framework of the power market.This study aims to develop a simulation model of the deregulated power market and to propose the design method for the appropriate market rules that can stabilize the power prices. The market mechanism for the liberalized market needs to stabilize the market under variety of decision-making algorithms of stakeholders. However the strict market rules prevent stakeholders from joining the trading. The proposed design method may avoid the undesirable unstable behavior under the prepared decision-making algorithm-sets. The market rule is decided so that the desirability indicator such as the stability of the market price may be maximized. The effectiveness of the proposed method was demonstrated through the simulation study.
期刊论文(12)
专著(0)
科研奖励(0)
会议论文
登录
查看更多内容
Simulating the Influence of the Amount of Wind Power Generation on the Electricity Market Price
风力发电量对电力市场价格影响的模拟
DOI:
--
发表时间:
2004
期刊:
Wind Power Asia 2004 Conference (CD-ROM)
影响因子:
--
作者:
[Walter Reinisch, Tetsuo Tezuka]
通讯作者:
Tetsuo Tezuka
電力自由市場への短期的移行過程に関する分析
向自由电力市场的短期过渡过程分析
DOI:
--
发表时间:
2004
期刊:
エネルギー資源 25・1
影响因子:
--
作者:
[米谷龍幸, 手塚哲央, 佐和隆光]
通讯作者:
佐和隆光
米谷龍幸, 手塚哲央, 佐和隆光: "電力自由市場への短期的移行過程に関する分析"エネルギー・資源. 25・1. 63-69 (2004)
Tatsuyuki Yonetani、Tetsuo Tezuka、Takamitsu Sawa:“向自由电力市场的短期过渡过程分析”能源与资源 63-69 (2004)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
手塚哲央 他: "エネルギー・環境・社会 現代技術社会論"丸善. 193 (2004)
Tetsuo Tezuka 等人:“能源、环境和社会:现代技术和社会理论”Maruzen 193 (2004)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
DOI:
--
发表时间:
2004
期刊:
Energy and Resources 25・1
影响因子:
--
作者:
[MAITANI Tatsuyuki, TEZUKA Tetsuo, SAWA Takamitsu]
通讯作者:
SAWA Takamitsu
共 6 条
Measures for promoting Renewable Energy Introduction by taking Nested Decentralized Autonomous Decision-making Structure
-
批准号:21560881
-
项目类别:Grant-in-Aid for Scientific Research (C)
-
资助金额:$2.83万
-
财政年份:2009
-
负责人:TEZUKA Tetsuo
-
依托单位:
Robust Framework Design for Electric Power Market with Supply Stability
-
批准号:17560752
-
项目类别:Grant-in-Aid for Scientific Research (C)
-
资助金额:$2.18万
-
财政年份:2005
-
负责人:TEZUKA Tetsuo
-
依托单位:
Open Simulation Framework for Deregulated Electric Power Market
-
批准号:13680575
-
项目类别:Grant-in-Aid for Scientific Research (C)
-
资助金额:$2.11万
-
财政年份:2001
-
负责人:TEZUKA Tetsuo
-
依托单位:
海外基金