课题基金 / 基金详情

Development of New Rutile Extraction Process and Titanium Resources

Development of New Rutile Extraction Process and Titanium Resources
金红石提取新工艺及钛资源开发
批准号:
18360360
负责人:
ITOH Satoshi
金额:
$10.78万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (B)
财政年份:
2006
资助国家:
日本
项目状态:
已结题
起止时间:
2006 至 2007

项目摘要

项目成果

ITOH Satoshi的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The oxidation by the fluidized bed reactor and the acid leaching experiments were conducted using the natural ilmenite ores from Australia and Mozambique to know the most suitable condition for the newly developed rutile extraction process. The results are summarized as follows:(1) From the analyses by XRD and EPMA of the sample before and after oxidation, it was found that ilmenite (FeTiO_3) was oxidized by fluidized bed reactor to form the two phases of pseudobrookite (Fe_2TiO_5) and rutile (TiO_2). The oxidation reaction of 2FeTiO_3(s)+1/2 O_2(g)=Fe_2TiO_5(s)+TiO_2(s) almost completed in about 20 minutes at temperatures of 1173 and 1223 K both for the two kinds of ore in 5%O_2-Ar gas mixture. The experiment that changed the cooling rate after the oxidation was also conducted because the nature like crystalline of the rutile formed might be influenced by the cooling rate after the oxidation by fluidized bed.(2) The leaching of the oxidized ore was carried out both with sulfuric and p … More hosphoric acid solution. The fractional leach rate of the pseudobrookite tended to become larger with decreasing the cooling rate, and the slow cooling of 5K/min was more suitable. On the other hand, the leach rate of the rutile was 10% that was about one-third of the case of air-cooled. Therefore, the effect of the cooling rate was significant in terms of the fractional leach rate of the rutile.(3) The process assessment for the two processes which were the oxidation followed by diluted-acid leaching and the conventional sulfuric acid processes was conducted by calculating and comparing the amount of energy required and the amount of the CO_2 exhaust. Based on the stoichiometric oxidation reaction, the amount of energy required in the process proposed by the present authors was estimated 11.4 MJ less than the sulfuric acid process, and that of the CO_2 exhaust was 0.9kg less per 1kg TiO_2, respectively. This indicates that the proposed process is superior and favorable compared to the conventional sulfuric acid process. Less
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
イルメナイト鉱石からの酸化・酸浸出法によるルチル抽出エコプロセスの開発
开发利用氧化和酸浸方法从钛铁矿矿石中提取金红石的生态工艺
DOI: --
发表时间: 2008
期刊:
影响因子: --
作者: [丸山雄市, 中川晃成, 伊藤 聰, 長坂徹也]
通讯作者: 長坂徹也
Feasibility Study of the New Rutile Extraction Process Based on Oxidation Reaction from Natural Ilmenite Ore
基于天然钛铁矿氧化反应提取金红石新工艺的可行性研究
DOI: --
发表时间: 2006
期刊: Metallurgical and Materials Transactions B Vol.37B
影响因子: --
作者: [S. Itoh, S. Sato, J. Ono, H. Okada and T. Nagasaka]
通讯作者: H. Okada and T. Nagasaka
DOI: --
发表时间: 2008
期刊:
影响因子: --
作者: [Y. Maruyama, A. Nakagawa, S. Itoh and T. Nagasaka]
通讯作者: S. Itoh and T. Nagasaka
IL-25 exacerbates autoimmune aortitis in IL-1 receptor antagonist-deficient mice
  • 批准号:
    16K10666
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
  • 资助金额:
    $3.0万
  • 财政年份:
    2016
  • 负责人:
    ITOH Satoshi
  • 依托单位:
Interleukin-17 Accelerates Allograft Rejection by Suppressing Regulatory T Cell Expansion
  • 批准号:
    23791573
  • 项目类别:
    Grant-in-Aid for Young Scientists (B)
  • 资助金额:
    $2.58万
  • 财政年份:
    2011
  • 负责人:
    ITOH Satoshi
  • 依托单位:
Fundamental Study on New Zinc Distilllation Process
  • 批准号:
    06650825
  • 项目类别:
    Grant-in-Aid for General Scientific Research (C)
  • 资助金额:
    $1.34万
  • 财政年份:
    1994
  • 负责人:
    ITOH Satoshi
  • 依托单位:
Reduction Rates for the Mixture of Iron Oxide and Zinc Oxide, and ZnFe_2O_4 with CO-CO_2 Gas Mixtures
  • 批准号:
    01550516
  • 项目类别:
    Grant-in-Aid for General Scientific Research (C)
  • 资助金额:
    $1.34万
  • 财政年份:
    1989
  • 负责人:
    ITOH Satoshi
  • 依托单位:
海外基金