Effect of block distribution system on water supply after earthquake

分区分配系统对震后供水的影响

基本信息

  • 批准号:
    09450197
  • 负责人:
  • 金额:
    $ 5.12万
  • 依托单位:
  • 依托单位国家:
    日本
  • 项目类别:
    Grant-in-Aid for Scientific Research (B)
  • 财政年份:
    1997
  • 资助国家:
    日本
  • 起止时间:
    1997 至 1999
  • 项目状态:
    已结题

项目摘要

Distribution network analyses have been carried out to investigate earthquake countermeasures from the viewpoints of the effect of emergency stop valves set on service pipes for fire fighting and restoration processes of damaged pipes in a block distribution system.Emergency stop valves can increase the number of hydrants available for fire fighting. It has also suggested that it is necessary to replace older pipes by earthquake-resistant pipes. Water in a service reservoir can be utilized for fire fighting for a longer time if emergency valves function detecting leakage volume.It was found that a back-up system in supplying water is an important factor in addition to forms of a distribution network in a block system. In the restoration process, the order of it in distribution classes must be distribution mains, distribution mains in blocks, distribution submains. In addition to this, pipes in larger diameter have to be repaired earlier. Frthermore, pipes in blocks on the upper stream in a supply area have to be repaired earlier. Formation of a block system does not decrease equitability during the repair work. A process to start to repair pipes in the district where there are many damaged pipes could contribute to decrease unequitability during the repair work.
为了研究地震对策,对配电网进行了分析,从消防管道上设置紧急截止阀的效果和分区配电系统中受损管道的恢复过程的角度进行了研究。紧急截止阀可以增加消防可用的消防栓数量。它还建议有必要用抗震管道取代旧管道。如果紧急阀能够检测泄漏量,则配水库中的水可以更长时间地用于消防。发现除了块系统中的分配网络的形式之外,供水的备用系统也是一个重要因素。在恢复过程中,它在配电类中的顺序必须是配电干线、分段配电干线、配电次干线。此外,直径较大的管道必须提前修复。首先,供水区上游街区的管道必须提前修复。在修理工作期间,块系统的形成不会降低公平性。在有许多损坏管道的地区开始修复管道的过程可能有助于减少修复工作中的不公平。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
Hisashi Sumifomo: "Distribution network analyses on restoration Process of damaged pipes and effect of stop valves on service pipes for fire fighting after earthquake"Proceedings of Award-Winning Papers, International Water Supply Symposium in Tokyo'98. 6
Hisashi Sumifomo:“地震后消防供水管道受损管道修复过程和截止阀效果的配电网络分析”获奖论文集,98年东京国际供水研讨会。
  • DOI:
  • 发表时间:
  • 期刊:
  • 影响因子:
    0
  • 作者:
  • 通讯作者:
汐崎剛: "管路および配水管網の地震被害対策" 第4回水道管路国際シンポジウム講演集. 137-145 (1997)
Tsuyoshi Shiozaki:“管道和配水网络的地震破坏对策”第四届国际输水管道研讨会论文集137-145(1997)。
  • DOI:
  • 发表时间:
  • 期刊:
  • 影响因子:
    0
  • 作者:
  • 通讯作者:
住友 恒: "管路および配水管網の地震被害対策"第4回水道管路国際シンポジウム講演集. 137-145 (1997)
Hisashi Sumitomo:“管道和配水管网的震害对策”第四届国际输水管道研讨会论文集137-145(1997)。
  • DOI:
  • 发表时间:
  • 期刊:
  • 影响因子:
    0
  • 作者:
  • 通讯作者:
住友 恒: 国際水道シンポジウム東京'98. 65-72 (1998)
住友恒:国际供水研讨会东京98。65-72(1998)
  • DOI:
  • 发表时间:
  • 期刊:
  • 影响因子:
    0
  • 作者:
  • 通讯作者:
Hisashi Sumifomo: "System analysis of earthquake damages on water supply networks in Kobe City"The 4th International Symposium on Water Pipe Systems,12-14 Nov.. 137-145 (1997)
Hisashi Sumifomo:“神户市供水网络地震损害的系统分析”第四届国际供水管道系统研讨会,11月12-14日。137-145(1997)
  • DOI:
  • 发表时间:
  • 期刊:
  • 影响因子:
    0
  • 作者:
  • 通讯作者:
{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

SUMITOMO Hisashi其他文献

SUMITOMO Hisashi的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('SUMITOMO Hisashi', 18)}}的其他基金

Development of Control Technology of Removal Efficiency in Biological Activated Carbon
生物活性炭去除效率控制技术的研究进展
  • 批准号:
    08555138
  • 财政年份:
    1996
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Grant-in-Aid for Scientific Research (B)
New Strategy for Environmental Pollution Control
环境污染治理新战略
  • 批准号:
    08045036
  • 财政年份:
    1996
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Grant-in-Aid for international Scientific Research
Biological decomposition of agricultural chemicals in water resources
水资源中农用化学品的生物分解
  • 批准号:
    06454034
  • 财政年份:
    1994
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Grant-in-Aid for General Scientific Research (B)
Advanced biological water treatment for water supply
供水的先进生物水处理
  • 批准号:
    05555153
  • 财政年份:
    1993
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Grant-in-Aid for Developmental Scientific Research (B)
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了