COst-Reducing Dynamic Electrification gradient System (CODES)
COst-Reducing Dynamic Electrification gradient System (CODES)
批准号:
10063722
负责人:
金额:
$3.04万
依托单位:
依托单位国家:
英国
项目类别:
Collaborative R&D
财政年份:
2023
资助国家:
英国
项目状态:
已结题
起止时间:
2023 至 --
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Currently, 42% of the UK's routed rail network is electrified, with 4,238km using overhead electrification infrastructure (Office of Road and Rail 2018/19). According to Network Rail plans, there is a positive business case for electrification. However, the projected cost of rolling programmes in the UK is around £2.5 - £3.5 million per single track kilometre (stk) against for instance Germany, it is typically £1m per stk. The RIA Electrification Cost Challenge -- March 2019 highlighted that the contribution of civil interventions to the total cost of electrification can be as high as 40%.In response, Furrer+Frey are proposing to develop a physical gradient dynamic system at GCRE, that will allow rapid, real-life replication of current and proposed electrification gradients, so that dynamic testing of the train and electrification interface can be tested in the real world in order to reduce the need for civils interventions.Furrer+Frey modelling shows that at least 20% of the civil interventions on recent major electrification projects could have been removed through better testing. The CODES project (COst-Reducing Dynamic Electrification gradient System) is designed to allow us and Network Rail to create real-life twins of the rail infrastructure, so different gradients can be tested quickly, affordably and efficiently in a test environment. CODES will save testing costs, reduce project durations, reduce railway electrification costs by removing civil interventions and also reduce the embodied carbon of raising bridges.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
海外基金