Accelerating Retrofit for Net-Zero Housing
Accelerating Retrofit for Net-Zero Housing
批准号:
10065696
负责人:
金额:
$2.8万
依托单位:
依托单位国家:
英国
项目类别:
Collaborative R&D
财政年份:
2023
资助国家:
英国
项目状态:
已结题
起止时间:
2023 至 --
中文摘要
点击翻译按钮获取中文摘要
英文摘要
The UK Government is committed to achieving net-zero CO2 emissions by 2050 and energy-efficiency improvements to homes have a significant part to play in achieving this goal. Current rates of retrofit to properties are inadequate and must accelerate significantly to meet these targets.Accelerating works could lead to shortcuts being taken, less experienced or able contractors being used and risks of failures increased. There are numerous examples of retrofit installations not achieving their expected outcomes, failing prematurely and in some extreme cases undermining the integrity of the structure itself. Frameworks such as PAS 2030 and PAS 2035 are designed to remove these issues through control of processes, however, their use is not widespread and there is no effective means of ensuring adherence to the standards.This project will deliver an innovative new end-to-end tool that will help social housing providers, and their agents, to identify and sequence energy efficiency improvement work effectively. The proposed system will allow an agile and iterative approach for authorities that still provides effective oversight that would otherwise have to be provided by having suitably qualified staff or contractors involved throughout. This is seen as impractical for many schemes and, when it is necessary to substantially ramp up activity in the sector, it is a need that cannot be met with available resources.This product will initially be developed, tested and deployed for use by local authorities and their contractors.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
海外基金