An Automated Pull-in and Lock-Off System for Offshore Wind Farm Cable Installation
An Automated Pull-in and Lock-Off System for Offshore Wind Farm Cable Installation
批准号:
132962
负责人:
金额:
$5.79万
依托单位:
依托单位国家:
英国
项目类别:
Feasibility Studies
财政年份:
2017
资助国家:
英国
项目状态:
已结题
起止时间:
2017 至 --
中文摘要
点击翻译按钮获取中文摘要
英文摘要
This project considers a novel device for the automated pull-in and lock-off of medium and high voltage subseacables during offshore wind farm installation. The mechanical lock-off system aims to decrease thedependency of operations on viable weather windows for personnel transfer by automating the cable clampingprocess inside each turbine support structure. The risks associated with time delays will be minimised, as willthose relating to personnel transfer between vessels and turbine supports structures during weather windowswith marginal sea states.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
国内基金
海外基金
流场中多尺度Pull型自驱动颗粒聚集行为的研究
-
批准号:QN25A020005
-
项目类别:省市级项目
-
资助金额:--
-
批准年份:2025
-
负责人:刘琛
-
依托单位:
供应链多级库存网络的RFID使能的Push/Pull混合控制策略的研究
-
批准号:61273203
-
项目类别:面上项目
-
资助金额:80.0万元
-
批准年份:2012
-
负责人:汪定伟
-
依托单位: