Feasibility of applying C-Capture process with low cost materials to reduce cost of biogas upgrading
Feasibility of applying C-Capture process with low cost materials to reduce cost of biogas upgrading
批准号:
133324
负责人:
金额:
$13.24万
依托单位:
依托单位国家:
英国
项目类别:
Feasibility Studies
财政年份:
2018
资助国家:
英国
项目状态:
已结题
起止时间:
2018 至 --
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Renewable biomethane is one of the key low carbon fuels of the future. Distributing biomethane in the national gas grid presents a major opportunity to reduce the carbon footprint of heat, electricity and renewable fuel. Estimates for biogas output in 2020 are significant, however there is a need for lower gas production costs to increase the amount of biogas that can be economically utilised for grid injection. Biogas upgrading represents a significant part of the production cost of biomethane. This project will look at the feasibility of scale up and cost reduction of C-Capture's (CCL) biogas upgrading process for improved grid injection economics. CCL has developed a range of patented amine-free CO2 separation solvents with drastically reduced energy use, lower corrosion and smaller environmental footprint, while also having a low capital cost as compared to the state-of-the-art.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
海外基金