课题基金 / 基金详情

IPEC Ltd - Offshore windfarm array cable and switchgear Partial Discharge (PD) monitoring

IPEC Ltd - Offshore windfarm array cable and switchgear Partial Discharge (PD) monitoring
IPEC Ltd - 海上风电场阵列电缆和开关设备局部放电 (PD) 监测
批准号:
710007
负责人:
金额:
$12.74万
依托单位:
依托单位国家:
英国
项目类别:
GRD Proof of Concept
财政年份:
2011
资助国家:
英国
项目状态:
已结题
起止时间:
2011 至 --

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
Partial Discharge (PD) is a pre-breakdown phenomenon that occurs in cables, switchgear andaccessories. IPEC have pioneered PD monitoring technology as a tool for use in assetmanagement over the last 8 years, largely in collaboration with EDF Energy on their Londonand South East based distribution network. As the technology has developed and marketsevolved it has become apparent that the most compelling business case for installation ofpermanent monitoring is on high criticality circuits where a failure would pose safetyconcerns or have a high financial impact. As a result IPEC’s strongest sales have been in theindustrial sector and in particular process plants for instance, chemical plants, steel plants andsemi-conductor fabs. In order to do this we have developed very sophisticated data acquisitionand analysis algorithms that can detect the small PD signals in very high background noise.Much of IPEC’s business has been overseas into regions investing in manufacturing soalthough gross margins on the technology are high so are the costs of sale. A typicalinstallation for a single substation may cost in the region of £25-35K.With the high and rapidly increasing investment in off-shore wind farms around the UK, IPEChave identified an opportunity to bring the benefits PD monitoring to offshore assetmanagement. The working environment of the high voltage network connecting wind turbinesis harsh, increasing the likelihood of defects and failure. In addition the cost of repairing afailed component and the consequential damages are very high.By permanently monitoring the network of subsea cables and switchgear that interconnect theturbines, the asset operators will be able to identify and very accurately locate defects before afailure occurs. In many cases this will allow preventative maintenance to be carried out thusavoiding failure altogether.Off-shore wind farms generally have a 20 year design lifetime and it is estimated that the costof this monitoring technology would be offset by avoiding just two failures over this period.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
国内基金
海外基金
星形胶质细胞通过与中间神经元的相互作用调控LTD及恐惧记忆
  • 批准号:
  • 项目类别:
    省市级项目
  • 资助金额:
    30.0万元
  • 批准年份:
    2024
  • 负责人:
    刘吉红
  • 依托单位:
糖原合酶激酶-3β磷酸化GluN2B介导LTD导致阿尔茨海默病认知障碍及机制研究
  • 批准号:
    82301620
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    30万元
  • 批准年份:
    2023
  • 负责人:
    周秋至
  • 依托单位:
捕光色素蛋白转运因子LTD调控叶绿素合成及组装机理
  • 批准号:
    32170258
  • 项目类别:
    面上项目
  • 资助金额:
    58万元
  • 批准年份:
    2021
  • 负责人:
    徐秀美
  • 依托单位:
m6A识别蛋白YTHDF1在长时程抑制(LTD)和学习记忆中的作用及分子机制