课题基金 / 基金详情

Optimal Railway Network Maintenance

Optimal Railway Network Maintenance
优化铁路网络维护
批准号:
1930689
负责人:
金额:
$0.0万
依托单位:
依托单位国家:
英国
项目类别:
Studentship
财政年份:
2017
资助国家:
英国
项目状态:
已结题
起止时间:
2017 至 --

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The UK railway comprises of 20,000 miles of track and over 40,000 bridges. Much of the infrastructure is aging and, in order to satisfy the future demand for passenger and freight transport, will experience increased traffic densities and loads. The maintenance of such systems, to ensure a safe and reliable service restricted by limited financial resources, is a significant challenge and needs to be carefully managed. Computer models are used to relate the future state of any asset (track, structures, signalling, electrification, communications etc) to the whole life costs when any maintenance strategy is adopted. To make best use of the financial resources available to maintain the railway network, decisions need to be made on a whole life, whole system basis. The assets feature dependencies between them such as common budgets, common possession time, common inspections and the ability to take advantage of opportunities where the condition of one asset provides the chance to carry out work on another. This produces large scales models and the objective of this project is to develop an optimisation framework to select the best maintenance and renewal strategies across the extensive asset base.Through our Strategic Partnership with Network Rail, this project aims to develop an optimisation software to support the decision making to set the 'best' asset maintenance strategy.
期刊论文(8)
专著(0)
科研奖励(0)
会议论文
Incorporating defect specific condition indicators in a bridge life cycle analysis
在桥梁生命周期分析中纳入缺陷特定条件指标
DOI: 10.1016/j.engstruct.2021.113003
发表时间: 2021
期刊: Engineering Structures
影响因子: 5.5
作者: [Calvert G]
通讯作者: Calvert G
Modelling interactions between multiple bridge deterioration mechanisms
对多种桥梁劣化机制之间的相互作用进行建模
DOI: 10.1016/j.engstruct.2020.111059
发表时间: 2020
期刊: Engineering Structures
影响因子: 5.5
作者: [Calvert G]
通讯作者: Calvert G
An Alternative Approach to Railway RAMS: Development of an Extended RAMS Framework
铁路 RAMS 的替代方法:扩展 RAMS 框架的开发
DOI: 10.1680/jinam.20.00002
发表时间: 2021
期刊: Infrastructure Asset Management
影响因子: 0.7
作者: [Litherland J]
通讯作者: Litherland J
Bridge Maintenance, Safety, Management, Life-Cycle Sustainability and Innovations
桥梁维护、安全、管理、生命周期可持续性和创新
DOI: 10.1201/9780429279119-374
发表时间: 2021
期刊:
影响因子: --
作者: [Calvert G]
通讯作者: Calvert G
7
    海外基金