课题基金 / 基金详情

Investigating earthquake determinism with a multi-method approach

Investigating earthquake determinism with a multi-method approach
用多种方法研究地震决定论
批准号:
2438252
负责人:
金额:
$0.0万
依托单位:
依托单位国家:
英国
项目类别:
Studentship
财政年份:
2020
资助国家:
英国
项目状态:
未结题
起止时间:
2020 至 --

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
On average there are about 140,000 detectable earthquakes a year, of which around 15 grow to be magnitude 7 or greater. After an earthquake, we can simply calculate this final magnitude, but it is unclearif an earthquake `knows' its final magnitude before rupture ends. If characteristics of nucleation and early rupture allow us to determine earthquake magnitude, we say nucleation is deterministic (1). In the past, wehave applied many different approaches to understand the extent to which this paradigm is true. However, I have identified a key limitation of existing work on determinism, in that it generally uses a single methodor class of methods on small subsets of earthquakes which are all in similar geographical or tectonic settings. In my DPhil, I will apply a variety of methods to a large dataset spanning magnitudes, mechanisms andtectonic settings.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
国内基金
海外基金
隧道超前探测的三分量光纤地震加速度检波机理与应用研究
  • 批准号:
    51079080
  • 项目类别:
    面上项目
  • 资助金额:
    32.0万元
  • 批准年份:
    2010
  • 负责人:
    蒋奇
  • 依托单位:
汶川地震后不同时期儿童创伤后应激障碍和生命质量的比较分析及对策研究