Optimising transmission infrastructure for accelerated offshore wind
Optimising transmission infrastructure for accelerated offshore wind
批准号:
2588505
负责人:
金额:
$0.0万
依托单位:
依托单位国家:
英国
项目类别:
Studentship
财政年份:
2021
资助国家:
英国
项目状态:
未结题
起止时间:
2021 至 --
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Offshore wind is growing rapidly with a push for clean, renewable energy in the United Kingdom and atransition towards this direction globally. Offshore wind is predicted to have on average 13% annual growthfrom 2020 to 2050 [1]. Energy generated by wind is the most developed thus far and National Grid'sFuture Energy Scenarios (FES) predict that offshore and onshore wind will increase by 23-33 GW by 2030and a total of 54 GW by 2040 [1]. However, with 16 new generation projects granted to Scottish PowerRenewables alone via the Contracts for (CfD) scheme [2] the onshore electrical grid needs to transformexpeditiously. At present, the grid capacity in Scotland is 6.6 GW, approximately a quarter of the futuredemand [3]. As a result, offshore developers are generating energy that cannot be transmitted due to theonshore transmission infrastructure's lack of capacity. Developers are forced to cease operation and as aresult the GB consumer pays a curtailment cost, which for Scotland was £446 million in 2021-22 [3]. Theelectrical network operators are working hard to reinforce and build new infrastructure with the prescribed94 reinforcements totalling £21.7 billion from the Holistic Network Design report [2]. There is an increasedneed for energy security and independence too, heightened by the conflict in Ukraine which has pressuredgas supplies and increased energy prices within Europe.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
国内基金
海外基金
Transmission 特征值及其相关逆散射问题的研究
-
批准号:11571132
-
项目类别:面上项目
-
资助金额:50.0万元
-
批准年份:2015
-
负责人:严国政
-
依托单位:
无线输电关键技术理论与实验研究
-
批准号:60471033
-
项目类别:面上项目
-
资助金额:23.0万元
-
批准年份:2004
-
负责人:王秩雄
-
依托单位: