Hazardous Waste Worker Training Program

危险废物工人培训计划

基本信息

  • 批准号:
    6987503
  • 负责人:
  • 金额:
    $ 382.47万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
  • 财政年份:
    1992
  • 资助国家:
    美国
  • 起止时间:
    1992-09-01 至 2010-07-31
  • 项目状态:
    已结题

项目摘要

Laborers-AGC Education and Training Fund (Laborers-AGC) is applying for the Hazardous Materials Worker Health and Safety Training cooperative agreement, RFA-ES-04-005 to conduct a Hazardous Waste Worker Training Program (HWWTP - $24,169,912) and a Hazmat Disaster Preparedness Training Program (HDPTP - $2,341,200), at a total cost of $26,511,112 over the five years of the program. Laborers-AGC will train approximately 23,000 trainees under the HWWTP and 2,060 trainees under the HDPTP. Laborers-AGC will use 24 fixed training sites and 2 mobile units to train workers who are, or have the potential to be, employed on hazardous waste sites, who are at risk of exposure to hazardous waste on the job, or who may provide assistance as Skilled Support Personnel (SSP) on disaster sites. Workers will learn to work safely in highly hazardous environments. The trained SSP will learn how an emergency response operation functions, understand the roles of SSP and other participating responders, and obtain an awareness of potential problems and appropriate mechanisms for their resolution. Laborers-AGC's training will meet job and regulatory requirements and help protect worker health and safety during the entire remediation or emergency response. Training includes hazardous waste worker (exceeding OSHA and NIEHS Minimum Criteria requirements) and other environmental remediation courses, health and safety training and specific job skills courses as required to meet regional and specific job site needs. Training incorporates hands-on exercises, activity based instruction, and advanced training technologies. This nationwide training program targets Construction Craft Laborers; other building trades; and environmental contractor and government personnel. Special outreach and training efforts will focus on recruitment and retention of minority and non-or limited-English speaking workers. Environmental Preparatory, General Construction, and Life Skills training along with social support services provided by community based organizations will help disadvantaged workers succeed in training and job retention.
Laborers-AGC Education and Training Fund (Laborers-AGC) is applying for the Hazardous Materials Worker Health and Safety Training cooperative agreement, RFA-ES-04-005 to conduct a Hazardous Waste Worker Training Program (HWWTP - $24,169,912) and a Hazmat Disaster Preparedness Training Program (HDPTP - $2,341,200), at a total cost of $26,511,112 over the five years程序。劳动者-AGC将根据HWWTP培训大约23,000名受训者,在HDPTP下培训2,060名受训者。劳动者 - AGC将使用24个固定培训站点和2个移动设备来培训有可能在危险废物网站上使用的工人,这些工人面临着危险的废物站点,他们面临着工作中有危险废物的风险,或者可以在灾难网站上提供熟练的支持人员(SSP)的帮助。工人将学会在高度危险的环境中安全地工作。训练有素的SSP将学习紧急响应操作如何功能,了解SSP和其他参与响应者的角色,并了解潜在问题和解决方案的适当机制。劳动者-AGC的培训将满足工作和监管要求,并在整个补救或紧急响应期间帮助保护工人的健康和安全。培训包括有害废物工人(超过OSHA和NIEHS的最低标准要求) 以及其他环境补救课程,健康和安全培训以及满足区域和特定工作现场需求的特定工作技能课程。培训结合了动手练习,基于活动的教学和高级培训技术。该全国性培训计划针对建筑工艺工人;其他建筑行业;以及环境承包商和政府人员。特别的外展和培训工作将集中于招募和保留少数派和非限量性英语工人。环境预备,一般建筑和生活技能培训以及由社区组织提供的社会支持服务将有助于弱势工人成功地培训和保留工作。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

John J. LeConche其他文献

John J. LeConche的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('John J. LeConche', 18)}}的其他基金

DOE Hazardous Waste Worker Training Program
美国能源部危险废物工人培训计划
  • 批准号:
    10458079
  • 财政年份:
    2020
  • 资助金额:
    $ 382.47万
  • 项目类别:
DOE Hazardous Waste Worker Training Program
美国能源部危险废物工人培训计划
  • 批准号:
    10673654
  • 财政年份:
    2020
  • 资助金额:
    $ 382.47万
  • 项目类别:
DOE Hazardous Waste Worker Training Program
美国能源部危险废物工人培训计划
  • 批准号:
    10251339
  • 财政年份:
    2020
  • 资助金额:
    $ 382.47万
  • 项目类别:
DOE Hazardous Waste Worker Training Program
美国能源部危险废物工人培训计划
  • 批准号:
    10060039
  • 财政年份:
    2020
  • 资助金额:
    $ 382.47万
  • 项目类别:
The LIUNA Training and Education Fund Ebola Biosafety and Infectious Disease Training Program
LIUNA 培训和教育基金埃博拉生物安全和传染病培训项目
  • 批准号:
    9169995
  • 财政年份:
    2016
  • 资助金额:
    $ 382.47万
  • 项目类别:
The LIUNA Training and Education Fund Ebola Biosafety and Infectious Disease Training Program
LIUNA 培训和教育基金埃博拉生物安全和传染病培训项目
  • 批准号:
    9492825
  • 财政年份:
    2016
  • 资助金额:
    $ 382.47万
  • 项目类别:
Hazardous Waste Worker Training Program (HWWTP)
危险废物工人培训计划(HWWTP)
  • 批准号:
    8306153
  • 财政年份:
    2011
  • 资助金额:
    $ 382.47万
  • 项目类别:
Hazmat Disaster Preparedness Training Program (HDPTP)
危险品备灾培训计划 (HDPTP)
  • 批准号:
    8306154
  • 财政年份:
    2011
  • 资助金额:
    $ 382.47万
  • 项目类别:
Hazardous Waste Worker Training Program (HWWTP)
危险废物工人培训计划(HWWTP)
  • 批准号:
    8015700
  • 财政年份:
    2010
  • 资助金额:
    $ 382.47万
  • 项目类别:
Hazardous Waste Worker Training Program
危险废物工人培训计划
  • 批准号:
    7920276
  • 财政年份:
    2009
  • 资助金额:
    $ 382.47万
  • 项目类别:

相似国自然基金

教育人工智能背景下课程智慧大脑构建研究
  • 批准号:
    62367003
  • 批准年份:
    2023
  • 资助金额:
    29 万元
  • 项目类别:
    地区科学基金项目
面向在线开放课程的捆绑推荐方法研究
  • 批准号:
    72301112
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
面向复杂任务的课程强化学习——生成、表示与复用
  • 批准号:
    62306088
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
多课程场景下的学习者建模技术研究
  • 批准号:
    62307032
  • 批准年份:
    2023
  • 资助金额:
    30.00 万元
  • 项目类别:
    青年科学基金项目
基于图谱补全与评价循证的中学STEM课程资源智能组织方法研究
  • 批准号:
    62307023
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目

相似海外基金

CATCH Healthy Smiles: A cluster-RCT of an elementary school oral health intervention
CATCH 健康微笑:小学口腔健康干预的集群随机对照试验
  • 批准号:
    10668996
  • 财政年份:
    2020
  • 资助金额:
    $ 382.47万
  • 项目类别:
Administrative/Clinical Trials Core
行政/临床试验核心
  • 批准号:
    7290718
  • 财政年份:
    2007
  • 资助金额:
    $ 382.47万
  • 项目类别:
Using Military & Aviation Simulation Experience to Impr*
使用军事
  • 批准号:
    7009718
  • 财政年份:
    2005
  • 资助金额:
    $ 382.47万
  • 项目类别:
Community Effective Violence Prevention Programs
社区有效的暴力预防计划
  • 批准号:
    7014957
  • 财政年份:
    2005
  • 资助金额:
    $ 382.47万
  • 项目类别:
Neurocognitive Habilitation for Children with FAS/ARND
FAS/ARND 儿童的神经认知康复
  • 批准号:
    7073558
  • 财政年份:
    2005
  • 资助金额:
    $ 382.47万
  • 项目类别:
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了