课题基金 / 基金详情

95GHZ SPECTROMETER PULSED EXTENDED-INTERACTION KLYSTRON

95GHZ SPECTROMETER PULSED EXTENDED-INTERACTION KLYSTRON
95GHZ 光谱仪脉冲扩展交互速调管
批准号:
8364055
负责人:
CURT R DUNNAM
金额:
$0.26万
依托单位:
依托单位国家:
美国
项目类别:
财政年份:
2011
资助国家:
美国
项目状态:
已结题
起止时间:
2011-09-01 至 2012-08-31

项目摘要

项目成果

CURT R DUNNAM的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
This subproject is one of many research subprojects utilizing the resources provided by a Center grant funded by NIH/NCRR. Primary support for the subproject and the subproject's principal investigator may have been provided by other sources, including other NIH sources. The Total Cost listed for the subproject likely represents the estimated amount of Center infrastructure utilized by the subproject, not direct funding provided by the NCRR grant to the subproject or subproject staff. With completion of our recent upgrades to the integrated 95 GHz spectrometer extended-interaction klystron (EIK) pulse modulator, detailed in Subproject 0252, ACERT has entered a new era of significantly improved high-power pulse HF ESR spectroscopy. Initial high-power r.f. tests in the complete spectrometer indicate that the EIK tube bias and gated beam "on" time can now be adjusted for essentially unmeasurable power droop for intervals up to approximately 800ns. It has become evident from our initial post-upgrade empirical adjustments and observations, however, that our EIK biasing requirements under high-power pulsing are somewhat different than the manufacturer's (CPI, Inc., Canada) specifications indicate. Therefore, we have initiated a modest program for achieving a more complete picture of tube performance under different bias and drive conditions. Prior to the recent upgrade program, we had found that the EIK exhibited significant power droop during a (at that time fixed) 1¿s beam "on" time. In saturated mode the droop was measured to be a tolerable value of 21% of initial output power but the telling measurement of unsaturated droop indicated an extremely high value of 78% power loss over the beam pulse interval. Following incorporation of the modulator upgrades and repair of a modulator focus electrode bias supply offset due to component failure, approximately the same droop values were observed. However, a dramatic reduction of the EIK power droop characteristic was observed with adjustment of the h.v. switch supply above the previous 3KV limit. This observation indicates that the required focus electrode potential for optimum r.f. power extraction during the beam "on" time may be more positive than the 0¿20V specification supplied by CPI. We will in the near term investigate the best immediate bias adjustment for simultaneously minimizing power droop and overvoltage risk the modulator's expensive h.v. switch. These studies will be performed over the normal range of operating parametric conditions. In the long-term we will remove the modulator box with the goal of determining necessary modifications to the modulator to eliminate the droop effect entirely.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
AUTOMATIC FREQUENCY CONTROL (AFC) SYSTEM FOR HIGH-FIELD BRIDGE
  • 批准号:
    8363969
  • 项目类别:
  • 资助金额:
    $0.05万
  • 财政年份:
    2011
  • 负责人:
    CURT R DUNNAM
  • 依托单位:
VACUUM TEMPERATURE INSERT FOR 95 GHZ SPECTROMETRY
  • 批准号:
    8364022
  • 项目类别:
  • 资助金额:
    $0.86万
  • 财政年份:
    2011
  • 负责人:
    CURT R DUNNAM
  • 依托单位:
ESR MICROSCOPE MKII HIGH VOLTAGE PREREGULATOR
  • 批准号:
    8364083
  • 项目类别:
  • 资助金额:
    $1.5万
  • 财政年份:
    2011
  • 负责人:
    CURT R DUNNAM
  • 依托单位:
SWEPT HETRODYNE MILLIMETER-WAVE VECTOR NETWORK ANALYZER
  • 批准号:
    8364116
  • 项目类别:
  • 资助金额:
    $0.26万
  • 财政年份:
    2011
  • 负责人:
    CURT R DUNNAM
  • 依托单位:
海外基金