课题基金 / 基金详情

95 GHZ PULSE SPECTROMETER DEADTIME REDUCTION

95 GHZ PULSE SPECTROMETER DEADTIME REDUCTION
95 GHZ 脉冲光谱仪死区时间缩短
批准号:
8363995
负责人:
CURT R DUNNAM
金额:
$0.16万
依托单位:
依托单位国家:
美国
项目类别:
财政年份:
2011
资助国家:
美国
项目状态:
已结题
起止时间:
2011-09-01 至 2012-08-31

项目摘要

项目成果

CURT R DUNNAM的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
This subproject is one of many research subprojects utilizing the resources provided by a Center grant funded by NIH/NCRR. Primary support for the subproject and the subproject's principal investigator may have been provided by other sources, including other NIH sources. The Total Cost listed for the subproject likely represents the estimated amount of Center infrastructure utilized by the subproject, not direct funding provided by the NCRR grant to the subproject or subproject staff. Deadtime in the ACERT 95 GHz pulse spectrometer is presently around 40 nanoseconds, which carries substantial impact on the system SNR, and therefore spin sensitivity. This limitation is significant when collecting data on biological samples of low concentration. Our estimate is that the spectrometer's present intrinsic deadtime can be reduced to 15 ns or less by a.) modifications to the Extended-Interaction klystron Amplifier (EIA) modulator and b.) reduction of the quasioptical bridge corrugated waveguide length. With regard to the latter contribution we note that the ringdown time of the present 900mm corrugated waveguide section is predicted to be ca 20ns, a figure that is in good agreement with our low power evaluation data. Installation of the Cryogenic, Ltd. 9T magnet to replace the present Oxford 6T magnet, scheduled for late August, will permit substituting a 300mm section for the present corrugated waveguide section, thereby reducing the waveguide length and ringdown time by a factor of 3. The resulting waveguide-related deadtime contribution in attaining the spectrometer receiver noise floor of approximately 1 nW from an initial level of 1KW will accordingly fall from 20ns to 6.7ns. Regarding the modulator timing, the modulator internal timing hardware was initially designed to operate for a fixed retriggerable interval of approximately 1 ¿s to simplify the original external timing system configuration consisting of discrete timing modules. This "triggerable" hardware option, however, has the unwanted side effect of introducing around 10ns r.m.s. modulator turn-off jitter, which contributes about 20ns of additional deadtime. The solution to this minimizing this deadtime contribution is straightforward. Our 95 GHz spectrometer timing system has been upgraded with a commercial multichannel programmable card and companion high-resolution (1ns) card of ACERT design. A suitably programmed timing control line, with our planned modulator internal logic modifications, will permit us to operate the EIA modulator in a "strobed" mode, where the modulator turn-off time will then reflect the system's intrinsic resolution of 1ns and a deadtime improvement of about 20ns. We estimate that the two system improvements described in this Subproject will reduce the 95 GHz deadtime to ca 15ns, from the present value of ca 40ns.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
AUTOMATIC FREQUENCY CONTROL (AFC) SYSTEM FOR HIGH-FIELD BRIDGE
  • 批准号:
    8363969
  • 项目类别:
  • 资助金额:
    $0.05万
  • 财政年份:
    2011
  • 负责人:
    CURT R DUNNAM
  • 依托单位:
VACUUM TEMPERATURE INSERT FOR 95 GHZ SPECTROMETRY
  • 批准号:
    8364022
  • 项目类别:
  • 资助金额:
    $0.86万
  • 财政年份:
    2011
  • 负责人:
    CURT R DUNNAM
  • 依托单位:
ESR MICROSCOPE MKII HIGH VOLTAGE PREREGULATOR
  • 批准号:
    8364083
  • 项目类别:
  • 资助金额:
    $1.5万
  • 财政年份:
    2011
  • 负责人:
    CURT R DUNNAM
  • 依托单位:
SWEPT HETRODYNE MILLIMETER-WAVE VECTOR NETWORK ANALYZER
  • 批准号:
    8364116
  • 项目类别:
  • 资助金额:
    $0.26万
  • 财政年份:
    2011
  • 负责人:
    CURT R DUNNAM
  • 依托单位:
海外基金