Quantification of unplanned ore dilution associated with longitudinal sublevel stoping - Development of new numerical-empirical models

与纵向分段采矿相关的计划外矿石贫化的量化 - 新数值经验模型的开发

基本信息

  • 批准号:
    356293-2007
  • 负责人:
  • 金额:
    $ 2.3万
  • 依托单位:
  • 依托单位国家:
    加拿大
  • 项目类别:
    Collaborative Research and Development Grants
  • 财政年份:
    2009
  • 资助国家:
    加拿大
  • 起止时间:
    2009-01-01 至 2010-12-31
  • 项目状态:
    已结题

项目摘要

In a global competitive minerals market, there is continued pressure on mines to reduce costs. One approach to reducing mine costs is by the reduction of ore dilution. Unplanned ore dilution has a direct influence on the cost of a mine stope and ultimately on the profitability of a mining operation. The economic impact of dilution is due to costs associated with the transportation and treatment of waste or low grade rock having little or no mineral value. The additional time required for the backfilling of the larger stope volumes produced by the occurrence of ore dilution due to the extraction of waste rock can also lead to production delays, changes to the mining schedule, and potentially, development rehab costs. The goal of this project is to quantify unplanned ore dilution (or overbreak) associated with longitudinal sublevel stoping method, by establishing new, numerical-empirical dilution models for stope and orezone design, with respect to anticipated stope overbreak and mine scheduling. Identified factors influencing unplanned dilution such as induced stress environment, stope geometry, and the stope setting within the orezone extraction sequence are to be considered. The project case study will be the Lapa Mine of Agnico Eagle Mines Limited located in the Abbitibi region of the province of Quebec. The project findings will be applicable to underground mines employing longitudinal, sublevel stoping to extract steeply dipping, tabular orezones with longhole mining. Such mining systems are commonly found in Canada, USA, Mexico, Australia and South America.
在全球竞争激烈的矿产市场上,矿山继续面临降低成本的压力。降低采矿成本的一种方法是减少矿石贫化。计划外矿石贫化直接影响采矿场的成本,并最终影响采矿作业的盈利能力。稀释的经济影响是由于与运输和处理具有很少或没有矿物价值的废物或低品位岩石相关的成本。由于开采废石而发生矿石稀释,产生较大采场体积,因此需要额外时间进行采矿,这也可能导致生产延迟、采矿计划变更以及潜在的开发恢复成本。本项目的目标是量化与纵向分段采矿法相关的非计划矿石贫化(或超挖),通过建立新的,数值经验贫化模型的采场和矿带设计,预计采场超挖和矿山调度。应考虑已确定的影响非计划贫化的因素,如诱发应力环境、采场几何形状和矿区开采序列内的采场设置。项目案例研究将是位于魁北克省Abbitibi地区的Agnico Eagle矿业有限公司的Lapa矿。该项目的研究结果将适用于采用纵向分段采矿法开采大倾角板状矿带的地下矿山。这种采矿系统在加拿大、美国、墨西哥、澳大利亚和南美洲很常见。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Mitri, Hani其他文献

Dynamic Modelling of Seismic Wave Propagation due to a Remote Seismic Source: A Case Study
远程地震源引起的地震波传播的动态建模:案例研究
  • DOI:
    10.1007/s00603-020-02217-w
  • 发表时间:
    2020-08-03
  • 期刊:
  • 影响因子:
    6.2
  • 作者:
    He, Shengquan;Chen, Tuo;Mitri, Hani
  • 通讯作者:
    Mitri, Hani
Enhanced coalbed gas drainage based on hydraulic flush from floor tunnels in coal mines
煤矿底板巷道水力冲刷强化煤层瓦斯抽采
Fuzzy comprehensive evaluation of virtual reality mine safety training system
  • DOI:
    10.1016/j.ssci.2019.07.009
  • 发表时间:
    2019-12-01
  • 期刊:
  • 影响因子:
    6.1
  • 作者:
    Zhang, Hui;He, Xueqiu;Mitri, Hani
  • 通讯作者:
    Mitri, Hani
THE DIFFERENCE OF THE MOLECULAR STRUCTURES BETWEEN DEFORMED SOFT AND HARD COAL AND THEIR INFLUENCES ON THE CHARACTERISTICS OF ADSORPTION METHANE
变形软硬煤分子结构差异及其对吸附甲烷特性的影响
  • DOI:
    10.1142/s0218625x19501592
  • 发表时间:
    2020-06-01
  • 期刊:
  • 影响因子:
    1.1
  • 作者:
    Liu, Yanwei;Li, Peibo;Mitri, Hani
  • 通讯作者:
    Mitri, Hani
Pore Structure Characteristics and Adsorption and Desorption Capacity of Coal Rock after Exposure to Clean Fracturing Fluid.
  • DOI:
    10.1021/acsomega.2c00436
  • 发表时间:
    2022-06-28
  • 期刊:
  • 影响因子:
    4.1
  • 作者:
    Zuo, Weiqin;Zhang, Wenming;Liu, Yanwei;Han, Hongkai;Huang, Cheng;Jiang, Wenji;Mitri, Hani
  • 通讯作者:
    Mitri, Hani

Mitri, Hani的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Mitri, Hani', 18)}}的其他基金

Ground control strategies for burst prone mines
易爆地雷的地面控制策略
  • 批准号:
    RGPIN-2020-05645
  • 财政年份:
    2022
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Discovery Grants Program - Individual
Ground control strategies for burst prone mines
易爆地雷的地面控制策略
  • 批准号:
    RGPIN-2020-05645
  • 财政年份:
    2021
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Discovery Grants Program - Individual
Ground control strategies for burst prone mines
易爆地雷的地面控制策略
  • 批准号:
    RGPIN-2020-05645
  • 财政年份:
    2020
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Discovery Grants Program - Individual
Rock mass dynamic response to extraction
岩体对开采的动态响应
  • 批准号:
    RGPIN-2015-04851
  • 财政年份:
    2019
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Discovery Grants Program - Individual
Rock mass dynamic response to extraction
岩体对开采的动态响应
  • 批准号:
    RGPIN-2015-04851
  • 财政年份:
    2018
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Discovery Grants Program - Individual
Rock mass dynamic response to extraction
岩体对开采的动态响应
  • 批准号:
    RGPIN-2015-04851
  • 财政年份:
    2017
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Discovery Grants Program - Individual
Rock mass dynamic response to extraction
岩体对开采的动态响应
  • 批准号:
    RGPIN-2015-04851
  • 财政年份:
    2016
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Discovery Grants Program - Individual
Evaluation of fault-slip potential in underground mines
地下矿山断层滑移潜力评价
  • 批准号:
    453033-2013
  • 财政年份:
    2015
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Collaborative Research and Development Grants
Rock mass dynamic response to extraction
岩体对开采的动态响应
  • 批准号:
    RGPIN-2015-04851
  • 财政年份:
    2015
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Discovery Grants Program - Individual
Causes and effects of backfill dilution in open stoping method
露天回填法充填稀释的原因及影响
  • 批准号:
    41603-2010
  • 财政年份:
    2014
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Discovery Grants Program - Individual

相似海外基金

The safety of discharging children directly home from the pediatric intensive care unit (PICU); a Canadian population cohort
将儿童从儿科重症监护病房 (PICU) 直接送回家的安全性;
  • 批准号:
    469657
  • 财政年份:
    2022
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Operating Grants
Unplanned ICU Admissions: Understanding Mechanisms and Identifying Associations with Patient- and Family-Centered Outcomes
计划外 ICU 入院:了解机制并确定与以患者和家庭为中心的结果的关联
  • 批准号:
    10364037
  • 财政年份:
    2022
  • 资助金额:
    $ 2.3万
  • 项目类别:
Unplanned ICU Admissions: Understanding Mechanisms and Identifying Associations with Patient- and Family-Centered Outcomes
计划外 ICU 入院:了解机制并确定与以患者和家庭为中心的结果的关联
  • 批准号:
    10621707
  • 财政年份:
    2022
  • 资助金额:
    $ 2.3万
  • 项目类别:
Artificial Intelligence for the Prevention of Unplanned Dialysis
人工智能预防意外透析
  • 批准号:
    460491
  • 财政年份:
    2022
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Operating Grants
Diagnostics and advanced models for the reduction of unplanned underground conductor failures
用于减少地下导体意外故障​​的诊断和先进模型
  • 批准号:
    543705-2019
  • 财政年份:
    2021
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Collaborative Research and Development Grants
Fate and transport of enteric viruses through unplanned potable reuse
肠道病毒通过意外饮用水再利用的命运和传播
  • 批准号:
    20F20061
  • 财政年份:
    2020
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Grant-in-Aid for JSPS Fellows
SBIR Phase I: A Medical Device to Secure Endotracheal Tubes and Reduce Unplanned Extubations for Neonates in Intensive Care
SBIR 第一阶段:用于保护重症监护新生儿气管插管并减少意外拔管的医疗设备
  • 批准号:
    2036668
  • 财政年份:
    2020
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Standard Grant
Diagnostics and advanced models for the reduction of unplanned underground conductor failures
用于减少地下导体意外故障​​的诊断和先进模型
  • 批准号:
    543705-2019
  • 财政年份:
    2020
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Collaborative Research and Development Grants
Proposal of catheter fixation method for prevention of unplanned extubation
预防意外拔管的导管固定方法建议
  • 批准号:
    19K10804
  • 财政年份:
    2019
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Diagnostics and advanced models for the reduction of unplanned underground conductor failures
用于减少地下导体意外故障​​的诊断和先进模型
  • 批准号:
    543705-2019
  • 财政年份:
    2019
  • 资助金额:
    $ 2.3万
  • 项目类别:
    Collaborative Research and Development Grants
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了