Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure
Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure
批准号:
ARC : LP0219306
负责人:
Prof Robin Fell
金额:
$12.85万
依托单位国家:
澳大利亚
项目类别:
Linkage Projects
财政年份:
2002
资助国家:
澳大利亚
项目状态:
已结题
起止时间:
2002-01-01 至 2005-12-31
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure. Internal erosion and piping causes half of embankment dam failures and accidents. Historically about two percent of dams have been affected. The most common cause of initiation of erosion is in cracks or by hydraulic fracture in low stress zones. This project will develop methods for predicting the opening width and depth of desiccation and stress induced cracking in the dam crest, and for assessing whether the cracks will close before erosion begins as the reservoir water rises, or whether erosion will self limit or continue.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Erosion of embankment dams and dam spillways
-
批准号:LP110100389
-
项目类别:Linkage Projects
-
资助金额:$33.42万
-
财政年份:2011
-
负责人:Prof Robin Fell
-
依托单位:
Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure
-
批准号:LP0219306
-
项目类别:Linkage Projects
-
资助金额:$8.91万
-
财政年份:2002
-
负责人:Prof Robin Fell
-
依托单位:
海外基金