Erosion of embankment dams and dam spillways
Erosion of embankment dams and dam spillways
批准号:
LP110100389
负责人:
Prof Robin Fell
金额:
$33.42万
依托单位国家:
澳大利亚
项目类别:
Linkage Projects
财政年份:
2011
资助国家:
澳大利亚
项目状态:
已结题
起止时间:
2011-11-15 至 2015-12-31
中文摘要
点击翻译按钮获取中文摘要
英文摘要
In excess of $250M is spent annually to maintain, upgrade, improve safety and monitor performance of Australian dams. Improved methods for assessing both spillway and internal erosion, the cause of 50 per cent of embankment dam failures and incidents requiring repairs, will be developed, maximising dam safety and minimising maintenance expenditure.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure
-
批准号:ARC : LP0219306
-
项目类别:Linkage Projects
-
资助金额:$12.85万
-
财政年份:2002
-
负责人:Prof Robin Fell
-
依托单位:
Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure
-
批准号:LP0219306
-
项目类别:Linkage Projects
-
资助金额:$8.91万
-
财政年份:2002
-
负责人:Prof Robin Fell
-
依托单位:
海外基金