Software Estimation & Measurement Issues

软件估算

基本信息

  • 批准号:
    RGPIN-2016-03745
  • 负责人:
  • 金额:
    $ 1.89万
  • 依托单位:
  • 依托单位国家:
    加拿大
  • 项目类别:
    Discovery Grants Program - Individual
  • 财政年份:
    2016
  • 资助国家:
    加拿大
  • 起止时间:
    2016-01-01 至 2017-12-31
  • 项目状态:
    已结题

项目摘要

The research hypothesis is the following: the software development process shares some characteristics with traditional engineering production processes implemented in the manufacturing of high technology products. For example, performance can vary across ranges of outputs: it may display economies of scale within some range, and it may display diseconomies of scale across other ranges of outputs. To overcome such diseconomies of scale within some range of a specific manufacturing design, production engineers design another production process with a larger capability to handle larger volumes of outputs. To investigate empirically the proposed theory and related hypotheses for software estimation purposes, requires an access to a large set of software projects for which not only specific variables must be available, but as well information about the projects size classification specific to each organization. Statistical studies will be carried on with data from two large repositories of software projects.Once research insights obtained on the presence-absence of economies-diseconomies of scale, we will revisit causal factors and related productivity impacts across size ranges, project scope and across organizations. Research will be conducted for estimation for pre-project, in-project and post-project contexts.
研究假设如下:软件开发过程与高技术产品制造中实施的传统工程生产过程具有某些特征。例如,不同产出范围的业绩可能不同:在某个范围内可能显示规模经济,在其他产出范围内可能显示规模不经济。为了在特定制造设计的一定范围内克服这种规模不经济,生产工程师设计了另一种具有更大能力的生产过程,以处理更大数量的输出。为了实证研究所提出的理论和相关假设的软件估算的目的,需要访问一个大的软件项目,不仅特定的变量必须可用,但以及信息的项目规模分类具体到每个组织。我们将利用两个大型软件项目数据库的数据进行统计研究。一旦获得关于规模经济的存在-不存在-不经济的研究见解,我们将重新审视不同规模范围,项目范围和组织的因果因素和相关生产力影响。将进行项目前、项目中和项目后背景下的评估研究。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Abran, Alain其他文献

Measurement and quantification are not the same: ISO 15939 and ISO 9126
  • DOI:
    10.1002/smr.496
  • 发表时间:
    2012-08-01
  • 期刊:
  • 影响因子:
    2
  • 作者:
    Abran, Alain;Desharnais, Jean-Marc;Cuadrado-Gallego, Juan Jose
  • 通讯作者:
    Cuadrado-Gallego, Juan Jose
Usability evaluation of mobile applications using ISO 9241 and ISO 25062 standards
  • DOI:
    10.1186/s40064-016-2171-z
  • 发表时间:
    2016-04-29
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Moumane, Karima;Idri, Ali;Abran, Alain
  • 通讯作者:
    Abran, Alain
Improved estimation of software development effort using Classical and Fuzzy Analogy ensembles
  • DOI:
    10.1016/j.asoc.2016.08.012
  • 发表时间:
    2016-12-01
  • 期刊:
  • 影响因子:
    8.7
  • 作者:
    Idri, Ali;Hosni, Mohamed;Abran, Alain
  • 通讯作者:
    Abran, Alain
Software Development Effort Estimation Using Regression Fuzzy Models
Machine Learning Techniques for Software Maintainability Prediction: Accuracy Analysis

Abran, Alain的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Abran, Alain', 18)}}的其他基金

Software Estimation & Measurement Issues
软件估算
  • 批准号:
    RGPIN-2016-03745
  • 财政年份:
    2021
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual
Software Estimation & Measurement Issues
软件估算
  • 批准号:
    RGPIN-2016-03745
  • 财政年份:
    2020
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual
Intégration des outils de l'atelier de repérage et segmentation des tâches d'ingénierie des apprentissages automatiques (AA) pour l'implantation des algorithmes AA.
自动化学徒工 (AA) 工作室功能和分段技术的集成,用于算法植入 AA。
  • 批准号:
    544423-2019
  • 财政年份:
    2019
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Engage Plus Grants Program
Software Estimation & Measurement Issues
软件估算
  • 批准号:
    RGPIN-2016-03745
  • 财政年份:
    2019
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual
Software Estimation & Measurement Issues
软件估算
  • 批准号:
    RGPIN-2016-03745
  • 财政年份:
    2018
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual
Software Estimation & Measurement Issues
软件估算
  • 批准号:
    RGPIN-2016-03745
  • 财政年份:
    2017
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual
Software metrology: Foundations, concepts and techniques for improving quantitative management in software engineering
软件计量:改进软件工程定量管理的基础、概念和技术
  • 批准号:
    197277-2011
  • 财政年份:
    2015
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual
Software metrology: Foundations, concepts and techniques for improving quantitative management in software engineering
软件计量:改进软件工程定量管理的基础、概念和技术
  • 批准号:
    197277-2011
  • 财政年份:
    2014
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual
Software metrology: Foundations, concepts and techniques for improving quantitative management in software engineering
软件计量:改进软件工程定量管理的基础、概念和技术
  • 批准号:
    197277-2011
  • 财政年份:
    2013
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual
Software metrology: Foundations, concepts and techniques for improving quantitative management in software engineering
软件计量:改进软件工程定量管理的基础、概念和技术
  • 批准号:
    197277-2011
  • 财政年份:
    2012
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual

相似海外基金

Development of a high-rate ultrasonic windspeed measurement method based on a generalization of time inverse method and wave number estimation using EKF
开发基于时间反演方法和 EKF 波数估计推广的高速超声波风速测量方法
  • 批准号:
    23K03880
  • 财政年份:
    2023
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Coincident estimation of cell elasticity and intracellular pressure by atomic force measurement and its elastic shell theory analysis
原子力测量细胞弹性和细胞内压力的一致估计及其弹性壳理论分析
  • 批准号:
    23H01143
  • 财政年份:
    2023
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Grant-in-Aid for Scientific Research (B)
IMR: MM-1C: Enabling Continual Passive Estimation of Performance of Internet Transfers: Online Measurement and Classification Methods
IMR:MM-1C:实现互联网传输性能的持续被动估计:在线测量和分类方法
  • 批准号:
    2319511
  • 财政年份:
    2023
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Standard Grant
Explaining racial and ethnic Alzheimer’s disease disparities with joint estimation of life course social inequities and measurement bias in verbal memory assessment
通过生命历程社会不平等和言语记忆评估中测量偏差的联合估计来解释种族和民族阿尔茨海默病差异
  • 批准号:
    10728325
  • 财政年份:
    2022
  • 资助金额:
    $ 1.89万
  • 项目类别:
Essential and incidental measurement error: Bayesian estimation and inference when sample measurements are random-variable-valued
基本和偶然测量误差:样本测量为随机变量值时的贝叶斯估计和推断
  • 批准号:
    RGPIN-2021-04357
  • 财政年份:
    2022
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual
Continuous estimation of pulmonary artery pressure fluctuations based on non-invasive measurement using microwave radar
基于微波雷达无创测量的肺动脉压力波动连续估计
  • 批准号:
    22K12917
  • 财政年份:
    2022
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Explaining racial and ethnic Alzheimer’s disease disparities with joint estimation of life course social inequities and measurement bias in verbal memory assessment
通过生命历程社会不平等和言语记忆评估中的测量偏差的联合估计来解释种族和民族阿尔茨海默病差异
  • 批准号:
    10387926
  • 财政年份:
    2022
  • 资助金额:
    $ 1.89万
  • 项目类别:
Estimation of "Denseness" of Tofu Microstructure by Simultaneous Triple-Wavelength Laser Light Scattering Measurement
通过同时三波长激光散射测量估计豆腐微观结构的“致密性”
  • 批准号:
    22K20600
  • 财政年份:
    2022
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Grant-in-Aid for Research Activity Start-up
Essential and incidental measurement error: Bayesian estimation and inference when sample measurements are random-variable-valued
基本和偶然测量误差:样本测量为随机变量值时的贝叶斯估计和推断
  • 批准号:
    DGECR-2021-00428
  • 财政年份:
    2021
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Launch Supplement
Essential and incidental measurement error: Bayesian estimation and inference when sample measurements are random-variable-valued
基本和偶然测量误差:样本测量为随机变量值时的贝叶斯估计和推断
  • 批准号:
    RGPIN-2021-04357
  • 财政年份:
    2021
  • 资助金额:
    $ 1.89万
  • 项目类别:
    Discovery Grants Program - Individual
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了