课题基金 / 基金详情

Forecasting tools for micro-grid applications

Forecasting tools for micro-grid applications
微电网应用的预测工具
批准号:
485777-2015
负责人:
Zareipour, Hamidreza
金额:
$1.46万
依托单位:
依托单位国家:
加拿大
项目类别:
Collaborative Research and Development Grants
财政年份:
2017
资助国家:
加拿大
项目状态:
已结题
起止时间:
2017-01-01 至 2018-12-31

项目摘要

项目成果

Zareipour, Hamidreza的其他基金

相似基金

相关文献

中文摘要
翻译
加拿大通用电气(GE)Digital Energy Multilin(以下简称GE)与卡尔加里大学合作开发了一项合作研究与开发(CRD)计划。该计划将重点关注GE Grid IQ微电网控制系统平台的价格和负荷预测技术。该平台在加拿大开发,是第一个进入世界市场的工业微电网控制器。CRD计划的研究问题是如何开发微电网优化运行所需的预测模块。更具体地说,本提案的第一项任务是制定和实施一个能够无缝适应不同市场结构的价格预测机制。这是为了确保在不同司法管辖区安装平台时,只需进行最低限度的调整即可生成相关的电力市场价格预测。本研究的第二个任务是建立确定性和概率性微电网负荷预测模型,这些模型对微电网负荷的高波动性具有鲁棒性。负荷预测模型的设计将考虑到微电网负荷组成的具体特点。最后,本研究的第三个任务是研究预测误差如何影响微电网的整体经济效率,以及如何调整预测模型以减轻与预测误差相关的任何经济缺陷。该计划将在几个方面使加拿大受益,包括(i)从改进的加拿大技术中创造经济机会,(ii)通过改进工业微电网控制平台促进更多可再生资源的整合,以及(iii)通过改进作为偏远离网社区微电网优化重要组成部分的平台来节省资金并避免排放。
英文摘要
General Electric (GE) Digital Energy Multilin in Canada, referred to as GE here onward, has partnered with the University of Calgary to develop a Collaborative Research and Development (CRD) program. The program will be focused on price and load forecasting technologies for GE's Grid IQ Micro-grid Control System platform. The platform, developed in Canada, is the first industrial micro-grid controller to enter the world market. The research problem in the CRD program is how to develop forecasting modules required for optimal operation of micro-grids. More specifically, the first task in this proposal is to develop and implement a price forecasting mechanism that is seamlessly adaptable to different market structures. This is to ensure that when installing the platform in different jurisdictions, minimal adjustments are necessary to generate relevant electricity market price forecasts. The second task in this research is to build deterministic and probabilistic micro-grid load forecasting models that are robust against the high volatility of micro-grid loads. The load forecasting models will be designed such that they take into account the specific characteristics of micro-grid load composition. Finally, the third task in this research is to investigate how forecast errors may impact the overall economic efficiency of micro-grids, and how the forecasting models could be adjusted to mitigate any economic deficiency associated with forecast errors. This program will benefit Canada in several ways, including (i) creating economic opportunities from an improved Canadian technology, (ii) facilitating the integration of more renewable resources by improving an industrial micro-grid control platform, and (iii) saving money and avoiding emissions by improving a platform that is an essential part of micro-grid optimization in remote, off-grid communities.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Modelling Uncertainty in Modern Power Systems
  • 批准号:
    RGPIN-2018-04247
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $6.7万
  • 财政年份:
    2022
  • 负责人:
    Zareipour, Hamidreza
  • 依托单位:
Optimal utilization and planning of modernized electricity transmission grids
  • 批准号:
    556578-2020
  • 项目类别:
    Alliance Grants
  • 资助金额:
    $3.73万
  • 财政年份:
    2021
  • 负责人:
    Zareipour, Hamidreza
  • 依托单位:
Modelling Uncertainty in Modern Power Systems
  • 批准号:
    RGPIN-2018-04247
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $3.35万
  • 财政年份:
    2021
  • 负责人:
    Zareipour, Hamidreza
  • 依托单位:
Optimal utilization and planning of modernized electricity transmission grids
  • 批准号:
    556578-2020
  • 项目类别:
    Alliance Grants
  • 资助金额:
    $3.59万
  • 财政年份:
    2020
  • 负责人:
    Zareipour, Hamidreza
  • 依托单位:
海外基金