项目摘要

Inventory inaccuracy does exist in main stages of supply chain management, e.g., raw materials replenishment, production control and distribution scheduling, which leads to significant negative impact on its performance. Therefore, in this project, we will investigate the robust integrated replenishment, production control and distribution scheduling problem to hedge against inventory inaccuracy. The objective of this problem is to maximize the probability that the operation cost of a supply chain is less than an expected value in the situation of inventory inaccuracy. This probability is defined as robustness measurement. To solve this problem, we propose the robust integrated replenishment, production control and distribution policy by integrating state prediction method, robust optimization theory, robust control theory, and backstepping method to overcome the difficulties of ordering time-delay, and the coupling between replenishment, production and distribution. We also prove that the robustness of the proposed policy is better than that of traditional replenishment, production control and distribution policies, analyze the sensitivity of the robustness with respect to inventory errors, and find the quantitative condition of adopting the proposed robust policy. Base on that, we combine the proposed robust policy and the radio frequency identification (RFID) technology, which has been applied extensively in supply chain management, and solve the integrated optimization problem of robust policy adoption and RFID devices deployment so that the cost of RFID system is minimized while robustness of a supply chain system with inventory inaccuracy can be ensured. Finally, an experimental system of robust integrated replenishment, production control and distribution scheduling will be developed.
库存不精确性在供应链管理的主要环节(如原材料补货、生产控制与分销调度)中客观存在,并给其性能带来很大负面影响。因此,本项目研究克服库存不精确性的鲁棒集成补货计划、生产控制及分销调度问题,其目标是最大化库存不精确条件下供应链运行成本低于预期值的概率,并定义此概率为鲁棒性度量。为解决此问题,把状态预测方法、鲁棒优化理论、鲁棒控制理论与逆推方法相结合,克服订货时延和补货、生产、分销三者之间的耦合等困难,提出鲁棒集成补货、生产控制和分销策略;从理论上证明这一策略的鲁棒性优于传统的补货、生产控制和分销策略;对这一策略的鲁棒性关于库存误差的灵敏度进行分析,并提出其定量化适用条件。在此基础上,把这一鲁棒策略与供应链管理中广泛应用的射频识别技术结合起来,解决鲁棒策略应用与射频识别设备部署综合优化问题,在保证鲁棒性指标的基础上,最小化射频识别系统实施成本;并开发鲁棒集成补货、生产控制与分销调度实验系统。

结项摘要

库存记录误差普遍存在,且会对生产/库存系统产生严重不利影响;本课题研究了克服库存不精确的鲁棒集成补货、生产控制及分销策略。. 在鲁棒补货策略方面,针对由不可见库存损失导致的库存不精确,提出一种递归算法来估算真实库存水平的概率分布,并提出了一种鲁棒再订货时间/订货量策略。.在鲁棒生产控制策略方面,首先分别针对单阶段和多阶段单品种生产/库存系统,考虑补货提前期,提出一种库存精确时的近似最优补货及生产控制策略;在此基础上,考虑库存不精确性,提出一种在系统状态空间区域边界上光滑变化的鲁棒补货及生产控制策略,有效抑制了库存不精确性的负面影响。进一步针对多阶段、多品种、考虑物料运输时延的生产库存系统,应用动态规划获得库存记录精确时的近似最优补货及生产控制策略,然后针对库存不精确的情形,提出了一种基于库存水平条件数学期望的鲁棒生产/库存控制策略。. 在鲁棒分销策略方面,首先研究含补货提前期的库存路径规划问题:针对一个供应商两个零售商的简单情形,证明了最优库存路径策略具有切换曲线结构特征;推广到多零售商情形,提出了一种近似策略并将其与遗传算法结合来优化库存路径。进一步针对库存不精确、考虑补货提前期的多零售商分销调度问题,提出了当前及未来库存概率分布的估算方法;在此基础上,针对候选配送路径,提出了鲁棒补货时间、补货量及补货周期优化算法;最后,设计了含成本估计规则的遗传算法来优化配送路径。. 基于上述结果,提出了库存不精确时鲁棒集成补货、生产控制及分销的逆向递推策略,并开发了实验系统。进一步研究了鲁棒生产控制策略与射频识别系统的综合应用方法,建立了库存不精确时多阶段生产系统的马尔可夫决策过程模型,通过策略迭代获得了阈值型鲁棒生产控制策略,建立了射频识别设备部署优化的整数规划模型并提出了解此模型的启发式算法。. 本课题成果对库存、生产、分销控制理论有新的贡献,对克服库存数据误差带来的不利影响有重要应用价值。

项目成果

期刊论文数量(8)
专著数量(0)
科研奖励数量(0)
会议论文数量(5)
专利数量(0)
Heuristic Production and Sale Policy for a Two-Product-Type Manufacturing System With Downward Substitution
向下替代的两种产品型制造系统的启发式生产和销售策略
  • DOI:
    10.1109/tsmc.2014.2371876
  • 发表时间:
    2015
  • 期刊:
    IEEE Transactions on Systems, Man, and Cybernetics: Systems
  • 影响因子:
    --
  • 作者:
    Zheng Wang;Stanley B. Gershwin
  • 通讯作者:
    Stanley B. Gershwin
A robust inventory routing policy under inventory inaccuracy and replenishment lead-time
针对库存不准确和补货提前期的稳健库存路由策略
  • DOI:
    10.1016/j.tre.2016.05.001
  • 发表时间:
    2016
  • 期刊:
    Transportation Research Part E: Logistics and Transportation Review
  • 影响因子:
    --
  • 作者:
    Li Ming;Wang Zheng;Chan Felix T. S.
  • 通讯作者:
    Chan Felix T. S.
An integrated replenishment and production control policy under inventory inaccuracy and time-delay
库存不准确和延误情况下的综合补货和生产控制策略
  • DOI:
    10.1016/j.cor.2017.06.014
  • 发表时间:
    2017-12
  • 期刊:
    Computers and Operations Research
  • 影响因子:
    4.6
  • 作者:
    Ming Li;Zheng Wang
  • 通讯作者:
    Zheng Wang
An Inventory Routing Policy Under Replenishment Lead Time
补货提前期下的库存路径策略
  • DOI:
    10.1109/tsmc.2016.2562561
  • 发表时间:
    2017-12-01
  • 期刊:
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS
  • 影响因子:
    8.7
  • 作者:
    Li, Ming;Wang, Zheng;Chan, Felix T. S.
  • 通讯作者:
    Chan, Felix T. S.
A Robust Replenishment and Production Control Policy for a Single-Stage Production/Inventory System with Inventory Inaccuracy
针对库存不准确的单阶段生产/库存系统的稳健补货和生产控制策略
  • DOI:
    10.1109/tsmc.2014.2329284
  • 发表时间:
    2015-02
  • 期刊:
    IEEE Transactions on Systems, Man, and Cybernetics: Systems
  • 影响因子:
    --
  • 作者:
    Zheng Wang;Felix T. S. Chan
  • 通讯作者:
    Felix T. S. Chan

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi || "--"}}
  • 发表时间:
    {{ item.publish_year || "--" }}
  • 期刊:
    {{ item.journal_name }}
  • 影响因子:
    {{ item.factor || "--"}}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ patent.updateTime }}

其他文献

基于Petri网与SimEvents的半导体晶圆生产线建模与仿真
  • DOI:
    --
  • 发表时间:
    --
  • 期刊:
    工业控制计算机
  • 影响因子:
    --
  • 作者:
    汪峥;曹静静
  • 通讯作者:
    曹静静
Job Shop 型制造系统任务分配和能力规划问题的并行优化
  • DOI:
    --
  • 发表时间:
    --
  • 期刊:
    工业控制计算机
  • 影响因子:
    --
  • 作者:
    汪峥;黄海燕
  • 通讯作者:
    黄海燕
知识化制造环境下航空发动机装配车间自进化
  • DOI:
    --
  • 发表时间:
    --
  • 期刊:
    控制与决策
  • 影响因子:
    --
  • 作者:
    姜天华;严洪森;汪峥
  • 通讯作者:
    汪峥
基于Creator/Vega Prime的单件生产系统虚拟现实仿真
  • DOI:
    --
  • 发表时间:
    --
  • 期刊:
    计算机技术与发展
  • 影响因子:
    --
  • 作者:
    李明;汪峥
  • 通讯作者:
    汪峥
基于知识制造系统优化及ASP.NET下实现
  • DOI:
    --
  • 发表时间:
    --
  • 期刊:
    计算机技术与发展
  • 影响因子:
    --
  • 作者:
    姚立;汪峥;穆华灵
  • 通讯作者:
    穆华灵

其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi || "--" }}
  • 发表时间:
    {{ item.publish_year || "--"}}
  • 期刊:
    {{ item.journal_name }}
  • 影响因子:
    {{ item.factor || "--" }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}
empty
内容获取失败,请点击重试
重试联系客服
title开始分析
查看分析示例
此项目为已结题,我已根据课题信息分析并撰写以下内容,帮您拓宽课题思路:

AI项目思路

AI技术路线图

汪峥的其他基金

生鲜农产品库存、价格及质量综合控制与优化
  • 批准号:
    61673109
  • 批准年份:
    2016
  • 资助金额:
    60.0 万元
  • 项目类别:
    面上项目
基于RFID/EPC技术的网络化单件生产实时监控
  • 批准号:
    60974096
  • 批准年份:
    2009
  • 资助金额:
    30.0 万元
  • 项目类别:
    面上项目
精益设计过程动力学宏观与微观综合分析
  • 批准号:
    50505006
  • 批准年份:
    2005
  • 资助金额:
    22.0 万元
  • 项目类别:
    青年科学基金项目

相似国自然基金

{{ item.name }}
  • 批准号:
    {{ item.ratify_no }}
  • 批准年份:
    {{ item.approval_year }}
  • 资助金额:
    {{ item.support_num }}
  • 项目类别:
    {{ item.project_type }}

相似海外基金

{{ item.name }}
{{ item.translate_name }}
  • 批准号:
    {{ item.ratify_no }}
  • 财政年份:
    {{ item.approval_year }}
  • 资助金额:
    {{ item.support_num }}
  • 项目类别:
    {{ item.project_type }}
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了

AI项目解读示例

课题项目:调控A型流感病毒诱导IFN-β表达的机制研究

AI项目摘要:

本研究聚焦于TRIM2蛋白在A型流感病毒诱导的IFN-β表达中的调控机制。A型流感病毒是全球性健康问题,其感染可导致严重的呼吸道疾病。IFN-β作为关键的抗病毒因子,其表达水平对抗病毒防御至关重要。然而,TRIM2如何调控IFN-β的表达尚未明确。本研究假设TRIM2通过与病毒RNA或宿主因子相互作用,影响IFN-β的产生。我们将采用分子生物学、细胞生物学和免疫学方法,探索TRIM2与A型流感病毒诱导IFN-β表达的关系。预期结果将揭示TRIM2在抗病毒免疫反应中的作用,为开发新的抗病毒策略提供理论基础。该研究对理解宿主抗病毒机制具有重要科学意义,并可能对临床治疗流感病毒感染提供新的视角。

AI项目思路:

科学问题:TRIM2如何调控A型流感病毒诱导的IFN-β表达?
前期研究:已有研究表明TRIM2参与抗病毒反应,但其具体机制尚不明确。
研究创新点:本研究将深入探讨TRIM2在IFN-β表达中的直接作用机制。
技术路线:包括病毒学、分子生物学、细胞培养和免疫检测技术。
关键技术:TRIM2与病毒RNA的相互作用分析,IFN-β启动子活性检测。
实验模型:使用A型流感病毒感染的细胞模型进行研究。

AI技术路线图

        graph TD
          A[研究起始] --> B[文献回顾与假设提出]
          B --> C[实验设计与方法学准备]
          C --> D[A型流感病毒感染模型建立]
          D --> E[TRIM2与病毒RNA相互作用分析]
          E --> F[TRIM2对IFN-β启动子活性的影响]
          F --> G[IFN-β表达水平测定]
          G --> H[TRIM2功能丧失与获得研究]
          H --> I[数据收集与分析]
          I --> J[结果解释与科学验证]
          J --> K[研究结论与未来方向]
          K --> L[研究结束]
      
关闭
close
客服二维码