高土石坝工程建设期风险动态协同管理研究

结题报告
项目介绍
AI项目解读

基本信息

  • 批准号:
    51379192
  • 项目类别:
    面上项目
  • 资助金额:
    80.0万
  • 负责人:
  • 依托单位:
  • 学科分类:
    E0906.水工结构
  • 结题年份:
    2017
  • 批准年份:
    2013
  • 项目状态:
    已结题
  • 起止时间:
    2014-01-01 至2017-12-31

项目摘要

High earth-rock dams' construction periods are so long that the risk factors always change, especially in the cofferdam water retaining stage, the temporary water retaining stage and reservoir initial filling stage, and meanwhile the risk levels and the capability against risks of dams are also different. Most of researches were done on the static analysis of risk factors which are relatively independent; while seldom took risk factors changing over time and the factors collaboration into consideration. Based on the principle of recognition after classification, firstly this study will establish multi-dimensional characteristic graph and dynamic risk identification model of WBS-RBS on the basis of Hall three-dimensional structure. Secondly, the uncertainty of the risk factors weighting will be evaluated by using systems engineering, unascertained mathematics and matter element analysis theories. Thirdly, combined with the development of social and economic, the acceptable risk assessment criteria will be determined and dynamic risk evaluation model will be established. Fourthly, on the base of exploring the intrinsic links and optimal control ranges in different stages of risk factors, collaborative control methods will be proposed when the risk factors always change. Finally, collaborative risk management model will be established to reach the input (measures which should be taken to control overall risk) -output(risk control effect) optimization, and the efficiency of risk management will be improved effectively.
高土石坝工程建设周期长,在围堰挡水阶段、坝体临时挡水阶段、水库初期蓄水阶段风险因子在不断变化,风险程度也不一样,大坝抵抗风险的能力也不同。已有的研究大多是对相对独立的风险要素进行静态的分析,很少考虑风险因子随时间变化以及因子之间协同控制的风险管理。本研究依据先分类后识别的原则,建立风险因子多维特性功效图形和基于霍尔三维结构的WBS-RBS风险动态识别模型;利用系统工程学、未确知数学及物元分析等理论,解决风险因子权重评价的不确定性,结合社会、经济发展,确定可接受的风险评价准则,构建风险动态评价模型;研究各风险因子的内在联系及不同阶段的最优控制范围,提出风险因子动态变化下的协同控制方法,建立风险动态协同管理模型,寻求投入(为控制总体风险而采取的各种措施)- - 产出(风险控制效果)的最优化,提高风险管理效率。

结项摘要

高土石坝工程建设期各项功能尚未完善,各类参数指标尚未达到设计要求,影响安全、质量、进度和成本等目标协同实现的定性、定量指标多且相互作用,因而是风险事件的高发期。.本研究基于霍尔三维结构和风险形成路径分析,采用WBS-RBS矩阵和logistic回归分析理论,定性与定量相结合识别高土石坝建设期风险因子。分析上游来水、导流建筑物泄流能力和挡水建筑物顶部高程等关键因素的不确定性,基于Monte-Carlo方法模拟水文、水力和施工进度,建立高土石坝建设期漫坝风险动态分析模型,揭示相关因素不确定性对于土石坝建设期漫坝风险的影响特性。采用S型曲线分布作为拟合函数,将常规突变评价值映射到底层指标隶属度上得到改进的突变评价值,解决常规突变评价法存在的突变评价值过高、优劣方案的突变评价值过于接近的问题,并应用于土石坝建设期安全、质量、进度和成本多目标风险评价,分析结果更具客观性的同时也更为清晰。定量分析标准反应谱下降段衰减系数值的变化与高土石坝地震响应之间的关系,提出对于高度超过200m土石坝,其规范化的标准反应谱下降段的衰减系数γ取0.7比规范规定的0.6更为合适。拟合土石坝建设期质量-工期分段函数和质量-工期-成本函数,构建多目标综合均衡优化模型并提出了一种基于遗传免疫算子的骨干微粒群算法,解决了模糊不确定环境中多种作业实施模式下的工期-成本-质量综合优化问题。引入加权广义马氏距离解决传统TOPSIS方法中决策结果受属性指标量纲影响大、未考虑属性指标间的相关性、协方差矩阵不可逆的问题,对工期-成本-质量均衡优化结果进行智能决策优选。.本研究将周期性风险管理与高土石坝建设过程有机结合,建立综合考虑质量、安全、进度、成本以及外部环境因素的风险动态协同管理模型。对于完善水库大坝风险管理理论,促进其在高土石坝工程建设中的实际应用具有重要的理论和实际意义。

项目成果

期刊论文数量(14)
专著数量(0)
科研奖励数量(0)
会议论文数量(2)
专利数量(0)
水利工程模糊多模式工期-成本-质量均衡优化
  • DOI:
    --
  • 发表时间:
    2015
  • 期刊:
    水力发电学报
  • 影响因子:
    --
  • 作者:
    关宏艳;李宗坤;王娟;葛巍
  • 通讯作者:
    葛巍
反应谱衰减系数变化对高土石坝地震响应的影响
  • DOI:
    --
  • 发表时间:
    2015
  • 期刊:
    岩土工程学报
  • 影响因子:
    --
  • 作者:
    李宗坤;赵梦蝶;徐建国;葛巍
  • 通讯作者:
    葛巍
中国水库大坝风险标准与应用研究
  • DOI:
    10.13243/j.cnki.slxb.20141359
  • 发表时间:
    2015
  • 期刊:
    水利学报
  • 影响因子:
    --
  • 作者:
    李宗坤;葛巍;王娟;李巍
  • 通讯作者:
    李巍
Methodology for Establishing Risk Criteria for Dams in Developing Countries, Case Study of China
发展中国家水坝风险标准的制定方法,中国案例研究
  • DOI:
    10.1007/s11269-017-1728-0
  • 发表时间:
    2017
  • 期刊:
    Water Resources Management
  • 影响因子:
    4.3
  • 作者:
    Ge Wei;Li Zongkun;Liang Robert Y.;Li Wei;Cai Yingchun
  • 通讯作者:
    Cai Yingchun
土石坝建设期漫坝风险分析
  • DOI:
    --
  • 发表时间:
    2015
  • 期刊:
    水力发电学报
  • 影响因子:
    --
  • 作者:
    李宗坤;葛巍;王娟;赵海培;关宏艳
  • 通讯作者:
    关宏艳

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi || "--"}}
  • 发表时间:
    {{ item.publish_year || "--" }}
  • 期刊:
    {{ item.journal_name }}
  • 影响因子:
    {{ item.factor || "--"}}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ patent.updateTime }}

其他文献

基于集对分析-可变模糊集耦合方法的溃坝环境影响评价
  • DOI:
    --
  • 发表时间:
    2019
  • 期刊:
    天津大学学报 (自然科学与工程技术版)
  • 影响因子:
    --
  • 作者:
    李宗坤;李巍;葛巍;徐宏殷
  • 通讯作者:
    徐宏殷
溃坝风险后果研究现状与发展趋势
  • DOI:
    --
  • 发表时间:
    2020
  • 期刊:
    水科学进展
  • 影响因子:
    --
  • 作者:
    葛巍;焦余铁;李宗坤;张兆省;郭新燕
  • 通讯作者:
    郭新燕
基于模糊集理论的土石坝开裂破坏风险分析
  • DOI:
    10.13705/j.issn.1671-6833.2020.03.019
  • 发表时间:
    2020
  • 期刊:
    郑州大学学报(工学版)
  • 影响因子:
    --
  • 作者:
    李宗坤;宋子元;葛巍;王特;张兆省
  • 通讯作者:
    张兆省
基于未确知集对联系数法的溃坝社会影响评价
  • DOI:
    --
  • 发表时间:
    2020
  • 期刊:
    水电能源科学
  • 影响因子:
    --
  • 作者:
    李宗坤;姬艳婷;张兆省;葛巍
  • 通讯作者:
    葛巍
土石坝施工期安全风险—成本风险综合评价
  • DOI:
    --
  • 发表时间:
    2019
  • 期刊:
    水力发电
  • 影响因子:
    --
  • 作者:
    李宗坤;宗克强;张兆省;皇甫泽华
  • 通讯作者:
    皇甫泽华

其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi || "--" }}
  • 发表时间:
    {{ item.publish_year || "--"}}
  • 期刊:
    {{ item.journal_name }}
  • 影响因子:
    {{ item.factor || "--" }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}
empty
内容获取失败,请点击重试
重试联系客服
title开始分析
查看分析示例
此项目为已结题,我已根据课题信息分析并撰写以下内容,帮您拓宽课题思路:

AI项目思路

AI技术路线图

李宗坤的其他基金

梯级水库群大坝风险评估及工程等级划分方法研究
  • 批准号:
    52179144
  • 批准年份:
    2021
  • 资助金额:
    58 万元
  • 项目类别:
    面上项目
中国水库大坝风险后果分析模型研究
  • 批准号:
    51679222
  • 批准年份:
    2016
  • 资助金额:
    63.0 万元
  • 项目类别:
    面上项目

相似国自然基金

{{ item.name }}
  • 批准号:
    {{ item.ratify_no }}
  • 批准年份:
    {{ item.approval_year }}
  • 资助金额:
    {{ item.support_num }}
  • 项目类别:
    {{ item.project_type }}

相似海外基金

{{ item.name }}
{{ item.translate_name }}
  • 批准号:
    {{ item.ratify_no }}
  • 财政年份:
    {{ item.approval_year }}
  • 资助金额:
    {{ item.support_num }}
  • 项目类别:
    {{ item.project_type }}
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了

AI项目解读示例

课题项目:调控A型流感病毒诱导IFN-β表达的机制研究

AI项目摘要:

本研究聚焦于TRIM2蛋白在A型流感病毒诱导的IFN-β表达中的调控机制。A型流感病毒是全球性健康问题,其感染可导致严重的呼吸道疾病。IFN-β作为关键的抗病毒因子,其表达水平对抗病毒防御至关重要。然而,TRIM2如何调控IFN-β的表达尚未明确。本研究假设TRIM2通过与病毒RNA或宿主因子相互作用,影响IFN-β的产生。我们将采用分子生物学、细胞生物学和免疫学方法,探索TRIM2与A型流感病毒诱导IFN-β表达的关系。预期结果将揭示TRIM2在抗病毒免疫反应中的作用,为开发新的抗病毒策略提供理论基础。该研究对理解宿主抗病毒机制具有重要科学意义,并可能对临床治疗流感病毒感染提供新的视角。

AI项目思路:

科学问题:TRIM2如何调控A型流感病毒诱导的IFN-β表达?
前期研究:已有研究表明TRIM2参与抗病毒反应,但其具体机制尚不明确。
研究创新点:本研究将深入探讨TRIM2在IFN-β表达中的直接作用机制。
技术路线:包括病毒学、分子生物学、细胞培养和免疫检测技术。
关键技术:TRIM2与病毒RNA的相互作用分析,IFN-β启动子活性检测。
实验模型:使用A型流感病毒感染的细胞模型进行研究。

AI技术路线图

        graph TD
          A[研究起始] --> B[文献回顾与假设提出]
          B --> C[实验设计与方法学准备]
          C --> D[A型流感病毒感染模型建立]
          D --> E[TRIM2与病毒RNA相互作用分析]
          E --> F[TRIM2对IFN-β启动子活性的影响]
          F --> G[IFN-β表达水平测定]
          G --> H[TRIM2功能丧失与获得研究]
          H --> I[数据收集与分析]
          I --> J[结果解释与科学验证]
          J --> K[研究结论与未来方向]
          K --> L[研究结束]
      
关闭
close
客服二维码