课题基金 / 基金详情

Stabilization of railway subgrade by lime-flyash slurry injection

Stabilization of railway subgrade by lime-flyash slurry injection
喷石灰粉煤灰浆稳定铁路路基
批准号:
LP0349174
负责人:
Dr Asadul Haque
金额:
$5.7万
依托单位:
依托单位国家:
澳大利亚
项目类别:
Linkage Projects
财政年份:
2003
资助国家:
澳大利亚
项目状态:
已结题
起止时间:
2003-12-03 至 2007-11-28

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
澳大利亚的铁路网为通勤者和货物运输提供了一条主要的交通路线。铁路轨道路基应对上覆的压载物和封顶层提供足够的支撑。因此,较差的路基总是会导致轨道问题,包括轨道不平整、压舱物污染和轨道错位。本项目将详细研究注入石灰粉煤灰浆体改善路基土的基本机理和关键参数。该项目将在实验和数值模拟的基础上,开发一种改进的石灰粉煤灰浆液注入设计程序。
英文摘要
The rail network in Australia provides a major transport route for commuters as well as transportation of goods. The subgrade of railway track should provide adequate support for the overlying ballast and capping layers. Hence, a poor subgrade always results in track problems associated with uneven track, fouled ballast, and misalignment of the track. This project will investigate in detail the fundamental mechanisms and key parameters involved in the improvement of subgrade soil by injecting lime-flyash slurry. This project will develop an improved design procedure for lime-flyash slurry injection in the field based on experimental and numerical modelling.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
海外基金