课题基金 / 基金详情

Advanced study of the atmospheric flow Integrating REal climate conditions to enhance wind farm and wind turbine power production and increase components durability

Advanced study of the atmospheric flow Integrating REal climate conditions to enhance wind farm and wind turbine power production and increase components durability
大气流动的高级研究结合真实的气候条件,以提高风电场和风力涡轮机的发电量并提高部件的耐用性
批准号:
10039246
负责人:
金额:
$63.08万
依托单位国家:
英国
项目类别:
EU-Funded
财政年份:
2023
资助国家:
英国
项目状态:
未结题
起止时间:
2023 至 --

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
To deliver the future needed renewable energy capacity, wind farm developers will have to use larger turbines, at higher altitudes, explore novel geographical regions and offshore sites. Currently, wind turbines and wind farms are designed and operated considering “just” wind conditions. Consequently, the models do not take into account the physics and aerodynamics of atmospheric wind flows at high altitudes, neither how this is affected by the location, the effect of precipitation and/or sand. This reduces the expected efficiency of wind energy production, and makes hard to estimate the energy outputs, operating costs and lifespan of blades and turbines, increasing variability and the risk to investors and project developers when designing wind farms, reducing the total potential investment. Unless new sites can be identified and designed optimally, the LCOEs will start to rise as developers have to design wind farms that cannot be well predicted with conventional models. The AIRE consortium foresees precipitation and other events (clouds, sand, shear, inflow) that wind brings into the state of play to be the new key parameters for siting of wind turbines, wind farm design, component design and O&M strategies planning. AIRE will investigate solution to assess the potential impact of REAL climate conditions in different terrains, and different altitudes both onshore and offshore, gathering information from 4 experimental sites and 4 commercial wind farms. Specially AIRE will bring together researchers, blade manufacturers and utilities to create an open access knowledge hub of experimental data, develop new numerical models, build tools to design and control wind turbines and wind farms. The effectiveness of the developed tools and models will be validated using data from commercial wind farms.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
国内基金
海外基金
Incentive and governance schenism study of corporate green washing behavior in China: Based on an integiated view of econfiguration of environmental authority and decoupling logic
  • 批准号:
    --
  • 项目类别:
    外国学者研究基金项目
  • 资助金额:
    --
  • 批准年份:
    2024
  • 负责人:
    YU BYUNGJUN
  • 依托单位:
Got2基因对浆细胞样树突状细胞功能的调控及其在系统性红斑狼疮疾病中的作用研究
  • 批准号:
    82371801
  • 项目类别:
    面上项目
  • 资助金额:
    47.00万元
  • 批准年份:
    2023
  • 负责人:
    周海波
  • 依托单位:
糖尿病ED中成纤维细胞衰老调控内皮细胞线粒体稳态失衡的机制研究
  • 批准号:
    82371634
  • 项目类别:
    面上项目
  • 资助金额:
    49.00万元
  • 批准年份:
    2023
  • 负责人:
    赵福军
  • 依托单位:
酶响应的中性粒细胞外泌体载药体系在眼眶骨缺损修复中的作用及机制研究
  • 批准号:
    82371102
  • 项目类别:
    面上项目
  • 资助金额:
    49.00万元
  • 批准年份:
    2023
  • 负责人:
    苏蕴
  • 依托单位: