课题基金 / 基金详情

An Automated Pull-in and Lock-Off System for Offshore Wind Farm Cable Installation

An Automated Pull-in and Lock-Off System for Offshore Wind Farm Cable Installation
用于海上风电场电缆安装的自动拉入和锁定系统
批准号:
132962
负责人:
金额:
$5.79万
依托单位:
依托单位国家:
英国
项目类别:
Feasibility Studies
财政年份:
2017
资助国家:
英国
项目状态:
已结题
起止时间:
2017 至 --

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
该项目考虑了一种新型装置,用于在海上风电场安装期间自动拉入和锁定中高压海底电缆。机械锁定系统旨在通过自动化每个涡轮机支撑结构内的电缆夹紧过程,减少操作对人员转移的可行天气窗口的依赖。与时间延迟相关的风险将最小化,在边缘海况的天气窗口期间,与船舶和涡轮机支撑结构之间的人员转移相关的风险也将最小化。
英文摘要
This project considers a novel device for the automated pull-in and lock-off of medium and high voltage subseacables during offshore wind farm installation. The mechanical lock-off system aims to decrease thedependency of operations on viable weather windows for personnel transfer by automating the cable clampingprocess inside each turbine support structure. The risks associated with time delays will be minimised, as willthose relating to personnel transfer between vessels and turbine supports structures during weather windowswith marginal sea states.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
国内基金
海外基金
流场中多尺度Pull型自驱动颗粒聚集行为的研究
  • 批准号:
    QN25A020005
  • 项目类别:
    省市级项目
  • 资助金额:
    --
  • 批准年份:
    2025
  • 负责人:
    刘琛
  • 依托单位:
供应链多级库存网络的RFID使能的Push/Pull混合控制策略的研究
  • 批准号:
    61273203
  • 项目类别:
    面上项目
  • 资助金额:
    80.0万元
  • 批准年份:
    2012
  • 负责人:
    汪定伟
  • 依托单位: