课题基金 / 基金详情

An optimization framework for block-cave mine planning

An optimization framework for block-cave mine planning
块洞式矿山规划优化框架
批准号:
RGPIN-2016-06163
负责人:
Pourrahimian, Yashar
金额:
$1.75万
依托单位:
依托单位国家:
加拿大
项目类别:
Discovery Grants Program - Individual
财政年份:
2016
资助国家:
加拿大
项目状态:
已结题
起止时间:
2016-01-01 至 2017-12-31

项目摘要

项目成果

Pourrahimian, Yashar的其他基金

相似基金

相关文献

中文摘要
翻译
加拿大的采矿业是北美增长最快的行业之一。根据加拿大的经济行动计划,能源和采矿业每年为政府提供超过300亿美元的收入,这些钱用于支持医疗保健、教育和公共养老金等关键的社会项目。加拿大负有以可持续和最佳方式开发和利用其矿产资源的全球责任。当今采矿业的经济状况是这样的,主要的矿业公司正在增加大规模采矿方法的使用。他们预计,到2020年,全球大约50%的铜产量将来自地下矿山。这是该行业的一个重大转变,从传统的露天开采转向地下开采。在现有的采矿方法中,崩落法因其成本低、产量高而受到青睐。块洞开采是深露天矿停矿后继续生产的最佳解决方案之一。
英文摘要
The Canadian mining industry is one of the fastest growing sectors in North America. According to Canada's Economic Action Plan the energy and mining sector provides over $30 billion a year in revenue to governments- money that supports critical social programs such as health care, education and public pensions. Canada has a global responsibility to develop and utilize its mineral resources sustainably and optimally. The economics of today’s mining industry are such that the major mining companies are increasing the use of massive mining methods. They expect that, approximately 50 percent of the world’s copper production will come from underground mines by 2020. It is a step change for the industry, from the traditional open-pit to a move underground. Among the mining methods available, caving methods are favored because of their low-cost and high-production rates. Block-cave mining is one of the best solutions for continuing the operation after shutting down the mine in deep open-pit mines. The proposed research program builds on our past findings to develop an optimization framework for block-cave mine planning. This research directly contributes to the creation of new knowledge, and innovative technologies for block-cave production planning. This research is focused on applications of operations research in the context of mine planning. It is anticipated that the outcome of this research will contribute to responsible resource development by transferring knowledge to practitioners and end-users through prototype open-source software applications in the resources industry. The importance of this study can be examined from different perspectives. A production scheduling methodology that is based on a limited number of influential parameters will lead to optimistic production schedules. Also, relying only on manual planning methods or computer software that is based on heuristic algorithms will lead to mine schedules that are not the optimal global solution. Unfortunately, common methodologies and tools used in mining industry for block-cave scheduling are not adequate in dealing with the complexity of the optimal production scheduling of mineable deposits. Moreover, decisions related to block-cave planning are based on models that predict the behavior of rock masses and the recovery of ore. Rarely do these models account for variation in metallurgical characteristics or the influence of cave fragmentation on mill performance. Development of new technologies, optimization, and uncertainty quantification in long-term planning play a vital role in reducing environmental footprint and financial risk of block-cave projects. The outcome of the research is expected to result in sustainable optimal block-cave plans. This research will also result in training HQP with key capabilities in block-cave mine design and optimization.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
A Theoretical Paradigm Shift for Compliance of Strategic and Short-term Block Caving Mine Plans towards Sustainable Mineral Development
  • 批准号:
    RGPIN-2022-03276
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.89万
  • 财政年份:
    2022
  • 负责人:
    Pourrahimian, Yashar
  • 依托单位:
An optimization framework for block-cave mine planning
  • 批准号:
    RGPIN-2016-06163
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.75万
  • 财政年份:
    2021
  • 负责人:
    Pourrahimian, Yashar
  • 依托单位:
An optimization framework for block-cave mine planning
  • 批准号:
    RGPIN-2016-06163
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.75万
  • 财政年份:
    2020
  • 负责人:
    Pourrahimian, Yashar
  • 依托单位:
Optimization of open pit mine production scheduling with in-pit waste disposal
  • 批准号:
    538085-2019
  • 项目类别:
    Engage Grants Program
  • 资助金额:
    $1.82万
  • 财政年份:
    2019
  • 负责人:
    Pourrahimian, Yashar
  • 依托单位:
海外基金