Erosion of embankment dams and dam spillways
Erosion of embankment dams and dam spillways
批准号:
LP110100389
负责人:
Prof Robin Fell
金额:
$33.42万
依托单位国家:
澳大利亚
项目类别:
Linkage Projects
财政年份:
2011
资助国家:
澳大利亚
项目状态:
已结题
起止时间:
2011-11-15 至 2015-12-31
中文摘要
每年花费超过2.5亿美元用于维护、升级、提高安全性和监测澳大利亚水坝的性能。将发展评估溢洪道和内部侵蚀的改进方法,这是50%的堤防大坝失败和需要维修的事故的原因,从而最大限度地提高大坝的安全性,并尽量减少维修开支。
英文摘要
In excess of $250M is spent annually to maintain, upgrade, improve safety and monitor performance of Australian dams. Improved methods for assessing both spillway and internal erosion, the cause of 50 per cent of embankment dam failures and incidents requiring repairs, will be developed, maximising dam safety and minimising maintenance expenditure.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure
-
批准号:ARC : LP0219306
-
项目类别:Linkage Projects
-
资助金额:$12.85万
-
财政年份:2002
-
负责人:Prof Robin Fell
-
依托单位:
Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure
-
批准号:LP0219306
-
项目类别:Linkage Projects
-
资助金额:$8.91万
-
财政年份:2002
-
负责人:Prof Robin Fell
-
依托单位:
海外基金