Establishing the Quality Assurance programme for the strip sensor production of the ATLAS tracker upgrade including irradiation with neutrons, photons and protons to HL-LHC fluences

Establishing the Quality Assurance programme for the strip sensor production of the ATLAS tracker upgrade including irradiation with neutrons, photons and protons to HL-LHC fluences
复制标题

为 ATLAS 跟踪器升级的带状传感器生产制定质量保证计划,包括用中子、光子和质子照射 HL-LHC 能量流

DOI:
10.1088/1748-0221/18/05/c05009
复制
发表时间:
2023
影响因子:
1.3
通讯作者:
Kopsalis I
Kopsalis I
中科院分区:
工程技术4区
文献类型:
--
作者:
Kopsalis I

文献摘要

参考文献

被引文献

相似文献

CERN高亮度LHC(HL-LHC)升级版ATLAS探测器的新型内跟踪器(ITk)的条形传感器已成功完成预生产交付,并根据其性能开始全面生产。整个交付期预计将持续4年,以完成ITk所需的约22000个传感器。对于质量保证(QA),由Hamamatsu Photonics KK(HPK)代工厂在每个晶圆上生产由合作设计的许多测试结构,沿着大面积二极管和主传感器的微型版本。除了对每个主要传感器进行质量控制(QC)检查外,每个交付批次的QA样品在辐照前后都进行了测试,结果是在暴露于中子、伽马或质子后,其通量和剂量相当于HL-LHC运行后预期的通量和剂量,约为4000 fb-1最终积分光度的1.5倍。在本文中,介绍了程序,并进行了研究,以确定七个ITk QA条传感器辐照和测试地点满足所有要求,以支持整个ITk项目的条传感器生产阶段的这一非常广泛的计划。
The successful pre-production delivery of strip sensors for the new Inner Tracker (ITk) for the upgraded ATLAS detector at the High Luminosity LHC (HL-LHC) at CERN was completed and based on their performance full production has commenced. The overall delivery period is anticipated to last 4 years to complete the approximately 22000 sensors required for the ITk. For Quality Assurance (QA), a number of test structures designed by the collaboration, along with a large area diode and miniature version of the main sensor, are produced in every wafer by the foundry Hamamatsu Photonics KK (HPK). As well as Quality Control (QC) checks on every main sensor, samples of the QA pieces from each delivery batch are tested both before and after irradiation with results after exposure to neutrons, gammas or protons to fluences and doses corresponding to those anticipated after operation at the HL-LHC to roughly 1.5 times the ultimate integrated luminosity of 4000 fb-1. In this paper the procedures are presented and the studies carried out to establish that the seven ITk QA Strip Sensor irradiation and test sites meet all the requirements to support this very extensive programme throughout the strip sensor production phase for the ITk project.
ATLAS Inner Tracker 条形传感器生产的质量保证方法
影响因子: 1.4
作者:
M. Ullán;P. Allport;K. Dette;V. Fadeyev;J. Fernandez;C. Fleta;L. Gonella;I. Kopsalis;R. Orr;Y. Unno
通讯作者: Y. Unno
中子、质子和伽马辐照后 ATLAS17LS 传感器表面特性的电学表征
DOI: 10.1016/j.nima.2020.164456
发表时间: 2020
期刊: Accelerators, Spectrometers, Detectors and Associated Equipment
影响因子: --
作者:
Mikestikova M
通讯作者: Mikestikova M
ATLAS ITk 条形传感器质量保证测试和 ATLAS18 预生产传感器的结果
DOI: --
发表时间: 2022
期刊:
影响因子: --
作者:
Aoki T;Kaneko Y;Kearse J;Masashi Minamide;Oogi T.;小高裕和;S. Hirose et al.
通讯作者: S. Hirose et al.
使用 ATLAS ITk 原型硅条传感器 ATLAS17LS 进行电荷收集研究
DOI: 10.1016/j.nima.2020.164422
发表时间: 2020
期刊: Accelerators, Spectrometers, Detectors and Associated Equipment
影响因子: --
作者:
Hara K
通讯作者: Hara K
用于 ATLAS 内部跟踪器升级的强辐射带状传感器的电荷收集和场分布研究
DOI: 10.1016/j.nima.2016.04.035
发表时间: 2016
期刊: Accelerators, Spectrometers, Detectors and Associated Equipment
影响因子: --
作者:
Hara K
通讯作者: Hara K