Multi-degree cyclic hoist scheduling with time window constraints
Multi-degree cyclic hoist scheduling with time window constraints
复制标题
时间窗约束的多度循环提升调度
DOI:
10.1080/00207543.2010.503200
复制
发表时间:
2011-10
影响因子:
9.2
通讯作者:
Chen, Haoxun
中科院分区:
文献类型:
--
作者:
Che, Ada;Zhou, Zhen;Chu, Chengbin;Chen, Haoxun
This paper deals with the multi-degree cyclic single-hoist scheduling problem with time window constraints, in which multiple identical parts enter and leave the system during each cycle. We propose an analytical mathematical model and a branch-and-bound
登录
查看更多内容
影响因子:
9.2
作者:
Pengyu Yan;Chengbin Chu;Ada Che;Naiding Yang
通讯作者:
Naiding Yang
影响因子:
--
作者:
L. Phillips;P. S. Unger
通讯作者:
L. Phillips;P. S. Unger
DOI:
10.1109/70.660860
发表时间:
1998-02
期刊:
IEEE Trans. Robotics Autom.
影响因子:
--
作者:
Haoxun Chen;C. Chu;J. Proth
通讯作者:
Haoxun Chen;C. Chu;J. Proth
DOI:
10.1007/bf00167800
发表时间:
1996
期刊:
International Journal of Flexible Manufacturing Systems
影响因子:
--
作者:
W. Ng
通讯作者:
W. Ng
影响因子:
2.7
作者:
A. Che;C. Chu
通讯作者:
A. Che;C. Chu