Principals of Uncertainty and Information in Expert Systems
专家系统中的不确定性和信息原理
基本信息
- 批准号:9015675
- 负责人:
- 金额:$ 9.5万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Continuing Grant
- 财政年份:1991
- 资助国家:美国
- 起止时间:1991-07-01 至 1993-06-30
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
The principal objective of this research is to develop adequate principles for dealing with uncertainty in expert systems. The focus is on four relatively new mathematical theories of uncertainty: possibility theory, fuzzy set theory, random set theory, and the Dempster-Shafer theory of evidence. In each of these theories, as in probability theory, well-justified functions that measure uncertainty are now well established. These functions are crucial for the following three principles of uncertainty to be investigated: principles of maximum uncertainty, minimum uncertainty, and uncertainty invariance. According to the principle of maximum uncertainty, conclusions in any form of ampliative reasoning are determined by maximizing relevant uncertainty function subject to constraints that represent information available. The principle of minimum uncertainty is fundamental to a variety of problems involving unavoidable increase of relevant uncertainty, such as simplification or conflict-resolution problems. According to this principle, solutions are determined by minimizing relevant uncertainty function within constraints representing the requirements of each problem. The principle of uncertainty invariance is concerned with information-preserving transformations between distinct theories of uncertainty. This project is developing mathematical and computational foundation of the three principles as well as investigating their practical role in expert systems.
这项研究的主要目的是开发适当的 专家系统中处理不确定性的原则。 的 重点是四个相对较新的数学理论, 不确定性:可能性理论,模糊集理论,随机集 证据理论和Dempster-Shafer证据理论。 的每一个中 这些理论,如概率论, 测量不确定性的功能现在已经很好地建立起来。 这些功能对于以下三项原则至关重要: 待研究的不确定度:最大值原理 不确定性、最小不确定性和不确定性不变性。 根据最大不确定度原理, 任何形式的推理都是由最大化 相关不确定性函数受约束, 代表可用信息。最小原则 不确定性是各种问题的基础, 不可避免地增加了相关的不确定性,例如 简化或解决冲突问题。 根据 根据这一原则,解决方案是通过最小化相关 约束内的不确定性函数, 每个问题的要求。 测不准原理 不变性与信息保持有关 不同不确定性理论之间的转换。 这 该项目正在开发数学和计算基础 三个原则,并探讨其实际 专家系统的作用。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
George Klir其他文献
George Klir的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('George Klir', 18)}}的其他基金
Possibilistic Information: Theory and Applicability (Information Science)
可能性信息:理论与适用性(信息科学)
- 批准号:
8401220 - 财政年份:1984
- 资助金额:
$ 9.5万 - 项目类别:
Continuing Grant
Computer-Aided Modelling: Methods and Applications of Reconstructability Analysis (Systems Theory and Operations Research)
计算机辅助建模:可重构性分析的方法和应用(系统理论和运筹学)
- 批准号:
8219423 - 财政年份:1983
- 资助金额:
$ 9.5万 - 项目类别:
Standard Grant
Computer-Aided Reconstructability Analysis of Multidimensional Systems
多维系统的计算机辅助可重构性分析
- 批准号:
8217103 - 财政年份:1983
- 资助金额:
$ 9.5万 - 项目类别:
Standard Grant
Computer-Aided Analysis of Reconstructability of Many-Dimensional Relations
多维关系可重构性的计算机辅助分析
- 批准号:
7818954 - 财政年份:1979
- 资助金额:
$ 9.5万 - 项目类别:
Continuing Grant
相似海外基金
Managing the Uncertainty of Genetic Information in Neonates
管理新生儿遗传信息的不确定性
- 批准号:
10721451 - 财政年份:2023
- 资助金额:
$ 9.5万 - 项目类别:
Topic-Oriented Public Sentiment Assessment via Social Media under Information Uncertainty and Sparsity
信息不确定性和稀疏性下社交媒体主题舆情评估
- 批准号:
23K16954 - 财政年份:2023
- 资助金额:
$ 9.5万 - 项目类别:
Grant-in-Aid for Early-Career Scientists
An Empirical Research on Macroeconomic Uncertainty and the Usefulness of Accounting Information
宏观经济不确定性与会计信息有用性的实证研究
- 批准号:
23K01670 - 财政年份:2023
- 资助金额:
$ 9.5万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
Digital Design for Crystallisation in Advanced Pharmaceutical Manufacturing: Uncertainty of information and how to find data
先进药品制造中结晶的数字化设计:信息的不确定性以及如何查找数据
- 批准号:
2890547 - 财政年份:2022
- 资助金额:
$ 9.5万 - 项目类别:
Studentship
Information, uncertainty, and adaptive phenotypic variation
信息、不确定性和适应性表型变异
- 批准号:
RGPIN-2018-04358 - 财政年份:2022
- 资助金额:
$ 9.5万 - 项目类别:
Discovery Grants Program - Individual
BIM (Building Information Modelling) based Construction supply chain management under risk and uncertainty
基于BIM(建筑信息模型)的风险和不确定性下的建筑供应链管理
- 批准号:
RGPIN-2018-04074 - 财政年份:2022
- 资助金额:
$ 9.5万 - 项目类别:
Discovery Grants Program - Individual
Information, uncertainty, and adaptive phenotypic variation
信息、不确定性和适应性表型变异
- 批准号:
RGPIN-2018-04358 - 财政年份:2021
- 资助金额:
$ 9.5万 - 项目类别:
Discovery Grants Program - Individual
BIM (Building Information Modelling) based Construction supply chain management under risk and uncertainty
基于BIM(建筑信息模型)的风险和不确定性下的建筑供应链管理
- 批准号:
RGPIN-2018-04074 - 财政年份:2021
- 资助金额:
$ 9.5万 - 项目类别:
Discovery Grants Program - Individual
How to beat model uncertainty with more information
如何利用更多信息克服模型不确定性
- 批准号:
DE200100896 - 财政年份:2020
- 资助金额:
$ 9.5万 - 项目类别:
Discovery Early Career Researcher Award
BIM (Building Information Modelling) based Construction supply chain management under risk and uncertainty
基于BIM(建筑信息模型)的风险和不确定性下的建筑供应链管理
- 批准号:
RGPIN-2018-04074 - 财政年份:2020
- 资助金额:
$ 9.5万 - 项目类别:
Discovery Grants Program - Individual