Dynamic Uncertainty Management for Large Scale Problem Solving
解决大规模问题的动态不确定性管理
基本信息
- 批准号:9100530
- 负责人:
- 金额:$ 25.04万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Continuing Grant
- 财政年份:1991
- 资助国家:美国
- 起止时间:1991-09-01 至 1995-02-28
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
Current approaches to uncertainty management in AL and expert systems largely ignore the dynamics of large-scale problem solving. For example, much research has focused on the problem of computing the answer to a single query or set of queries, given a static problem model. However, advanced work in large scale problem solving, such as story and image understanding, reveals that such queries are interspersed in a larger stream of model specifications/reformulations and evidence assertions. This research has as its goal the understanding of the functionalrequirements for uncertainty management at this higher, task- oriented level, and the development of uncertainty management systems which provide efficient support for these requirements.
人工智能和专家系统中不确定性管理的当前方法 系统在很大程度上忽略了大规模问题的动态性 解决 例如,许多研究都集中在这个问题上, 计算单个查询或一组查询的答案, 给出一个静态问题模型。 然而,先进的工作, 规模问题解决,如故事和图像理解, 揭示了这样的查询散布在一个更大的流, 模型规范/重新表述和证据断言。 这项研究的目标是了解 不确定性管理的功能要求, 任务导向层次,发展不确定性 管理系统,为这些提供有效的支持 要求.
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Bruce D'Ambrosio其他文献
Local Expression Languages for Probabilistic Dependence: a Preliminary Report
- DOI:
10.1016/b978-1-55860-203-8.50016-4 - 发表时间:
1994-06 - 期刊:
- 影响因子:0
- 作者:
Bruce D'Ambrosio - 通讯作者:
Bruce D'Ambrosio
Discovering Spatio‐Temporal Models of the Spread of West Nile Virus
发现西尼罗河病毒传播的时空模型
- DOI:
10.1111/j.1539-6924.2006.00738.x - 发表时间:
2006 - 期刊:
- 影响因子:3.8
- 作者:
J. Orme;J. Jorgensen;Bruce D'Ambrosio;Eric Altendorf;P. Rossignol - 通讯作者:
P. Rossignol
An efficient approach for finding the MPE in belief networks
一种在信念网络中寻找 MPE 的有效方法
- DOI:
10.1016/b978-1-4832-1451-1.50046-9 - 发表时间:
1993 - 期刊:
- 影响因子:0
- 作者:
Z. Li;Bruce D'Ambrosio - 通讯作者:
Bruce D'Ambrosio
POMDP Learning using Qualitative Belief Spaces
- DOI:
- 发表时间:
1997 - 期刊:
- 影响因子:0
- 作者:
Bruce D'Ambrosio - 通讯作者:
Bruce D'Ambrosio
Extending the mathematics in qualitative process theory
扩展定性过程理论中的数学
- DOI:
- 发表时间:
1987 - 期刊:
- 影响因子:7
- 作者:
Bruce D'Ambrosio - 通讯作者:
Bruce D'Ambrosio
Bruce D'Ambrosio的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Bruce D'Ambrosio', 18)}}的其他基金
SBIR Phase II: Relational Bayesian Modeling for Electronic Commerce
SBIR 第二阶段:电子商务的关系贝叶斯建模
- 批准号:
0349497 - 财政年份:2004
- 资助金额:
$ 25.04万 - 项目类别:
Standard Grant
SBIR Phase I: Relational Bayesian Modeling for Electronic Commerce
SBIR 第一阶段:电子商务的关系贝叶斯建模
- 批准号:
0231961 - 财政年份:2003
- 资助金额:
$ 25.04万 - 项目类别:
Standard Grant
Probabilistic Methods in Dynamic Environments
动态环境中的概率方法
- 批准号:
9322521 - 财政年份:1994
- 资助金额:
$ 25.04万 - 项目类别:
Continuing Grant
Computational Models of Uncertainty Management and Decision Making
不确定性管理和决策的计算模型
- 批准号:
8821660 - 财政年份:1989
- 资助金额:
$ 25.04万 - 项目类别:
Continuing Grant
相似海外基金
CAREER: Uncertainty-aware sensing and management for IoT
职业:物联网的不确定性感知传感和管理
- 批准号:
2340049 - 财政年份:2024
- 资助金额:
$ 25.04万 - 项目类别:
Continuing Grant
A human-centered modeling approach to simulate best management practices and behaviors under uncertainty to meet water quality guidelines
以人为本的建模方法,用于模拟不确定情况下的最佳管理实践和行为,以满足水质准则
- 批准号:
2342309 - 财政年份:2024
- 资助金额:
$ 25.04万 - 项目类别:
Standard Grant
CAREER: Dynamic connectivity: a research and educational frontier for sustainable environmental management under climate and land use uncertainty
职业:动态连通性:气候和土地利用不确定性下可持续环境管理的研究和教育前沿
- 批准号:
2340161 - 财政年份:2024
- 资助金额:
$ 25.04万 - 项目类别:
Continuing Grant
Sustainable Management of Infrastructure Assets and Networks Under Uncertainty
不确定性下基础设施资产和网络的可持续管理
- 批准号:
RGPIN-2019-04955 - 财政年份:2022
- 资助金额:
$ 25.04万 - 项目类别:
Discovery Grants Program - Individual
Towards Robust Long-Term Infrastructure Asset Management under Deep Uncertainty
在高度不确定性下实现稳健的长期基础设施资产管理
- 批准号:
RGPIN-2022-04591 - 财政年份:2022
- 资助金额:
$ 25.04万 - 项目类别:
Discovery Grants Program - Individual
Climate Smart Forecasting and Robust Optimization of Forest Management System under Uncertainty
不确定性下的气候智能预测与森林管理系统稳健优化
- 批准号:
RGPIN-2022-04855 - 财政年份:2022
- 资助金额:
$ 25.04万 - 项目类别:
Discovery Grants Program - Individual
Condition-based risk assessment and management for infrastructure retrofit in the face of uncertainty
面对不确定性的基础设施改造的基于条件的风险评估和管理
- 批准号:
RGPIN-2017-05556 - 财政年份:2022
- 资助金额:
$ 25.04万 - 项目类别:
Discovery Grants Program - Individual
Model uncertainty and robustness in risk management
风险管理中的不确定性和稳健性模型
- 批准号:
RGPIN-2018-03823 - 财政年份:2022
- 资助金额:
$ 25.04万 - 项目类别:
Discovery Grants Program - Individual
Optimal management strategy for short food supply chains considering heterogeneity and uncertainty
考虑异质性和不确定性的短食品供应链优化管理策略
- 批准号:
22K04607 - 财政年份:2022
- 资助金额:
$ 25.04万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
BIM (Building Information Modelling) based Construction supply chain management under risk and uncertainty
基于BIM(建筑信息模型)的风险和不确定性下的建筑供应链管理
- 批准号:
RGPIN-2018-04074 - 财政年份:2022
- 资助金额:
$ 25.04万 - 项目类别:
Discovery Grants Program - Individual














{{item.name}}会员




