Prediction of Integration Impacts on Engineering- Procurement-Consturction (EPC) Processes and Industrial Facility Quality
Prediction of Integration Impacts on Engineering- Procurement-Consturction (EPC) Processes and Industrial Facility Quality
批准号:
9301307
负责人:
David Ashley
金额:
$12.75万
依托单位国家:
美国
项目类别:
Continuing Grant
财政年份:
1994
资助国家:
美国
项目状态:
已结题
起止时间:
1994-04-15 至 1997-03-31
中文摘要
9301307阿什利本研究将开发一个预测模型的项目绩效的基础上的措施,在设计和施工过程中的组织和技术集成。 预测的结果包括:工程-采购-施工(EPC)过程的成本、进度、质量和完工设施质量,即,完成的设施如何满足业主/运营商的需求。 输入变量包括项目的组织和技术集成的度量,项目团队之间的合同类型以及其他因素。
英文摘要
9301307 Ashley This research will develop a predictive model of project performance based on measures of organizational and technical integration during the design and construction process. The outcomes predicted include: cost, schedule, quality of the engineering-procurement-construction (EPC) process, and completed facility quality, i.e., how well the completed facility meets the needs of the owner/operator. Input variables include measures of the organization and technical integration on the project, the types of contracts among the project team, and other factors.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Presidential Young Investigator Award: Construction ProjectDecision Structures and Data Collection
-
批准号:8352354
-
项目类别:Continuing Grant
-
资助金额:$31.25万
-
财政年份:1984
-
负责人:David Ashley
-
依托单位:
海外基金