课题基金 / 基金详情

Due-Time Performance in Production Systems with Finished Good Buffers: A Systems Approach

Due-Time Performance in Production Systems with Finished Good Buffers: A Systems Approach
具有成品良好缓冲区的生产系统的到期性能:系统方法
批准号:
9820580
负责人:
Semyon Meerkov
金额:
$39.54万
依托单位国家:
美国
项目类别:
Continuing Grant
财政年份:
1999
资助国家:
美国
项目状态:
已结题
起止时间:
1999-06-01 至 2003-05-31

项目摘要

项目成果

Semyon Meerkov的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
In production systems with unreliable machines, the number of parts produced during a fixed interval of time is a random variable. Its distribution characterizes both the production volume and the productionvariability. The production volume has been analyzed in many publications. In contrast, the production variability has been studied in just a few recent articles where mostly production variance has been addressed. Although a useful measure of performance, it offers only a general, theoretical characterization of the production variability. Indeed, knowledge of the variance does not yet specify the probability with whicha fixed shipping schedule is satisfied. Recently, a new variability measure, referred to as the Due-Time Performance (DTP) and defined as the probability to satisfy a shipping schedule, has been introduced. The goal of this project is to develop methods for analysis and design of production systems from the point of DTP and to apply these methods in the automotive industry. Specifically, the following analysis problem will beaddressed: Given a production system, develop a constructive, analytical technique for DTP evaluation. Two design problems will be investigated. Direct problem: Given the reliability characteristics of the machines and the customer requirements on the shipping interval and shipment size, design a product delivery system so that DTP requirements are satisfied. Inverse problem: Given the customer requirements and the product delivery system, determine reliability characteristics of the machines required to satisfy a given DTP. If successful, this project will provide rigorous engineering tools for analysis and design of production systems in lean manufacturing environment operating in the pull regime. Their implementation will leadto a possibility of "calculating" a product delivery system rather than selecting it on the basis of ad hoc techniques in use today.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Equilibria, Stability, Oscillations, Chaos, and Transients in Re-entrant Lines
GOALI: Transients of Production Systems: Theory and Applications for Real-Time Productivity Improvement
GOALI: Quantitative Methods for Designing Lean Buffering in Production Systems: Theory and Applications
Feedforward Control of Data Rate in Wireless Networks
国内基金
海外基金
SERS探针诱导TAM重编程调控头颈鳞癌TIME的研究
  • 批准号:
    82360504
  • 项目类别:
    地区科学基金项目
  • 资助金额:
    32万元
  • 批准年份:
    2023
  • 负责人:
    周学军
  • 依托单位:
华蟾素调节PCSK9介导的胆固醇代谢重塑TIME增效aPD-L1治疗肝癌的作用机制研究
  • 批准号:
    82305023
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    30万元
  • 批准年份:
    2023
  • 负责人:
    王萌
  • 依托单位:
基于MRI的机器学习模型预测直肠癌TIME中胶原蛋白水平及其对免疫T细胞调控作用的研究
  • 批准号:
    --
  • 项目类别:
    面上项目
  • 资助金额:
    52万元
  • 批准年份:
    2022
  • 负责人:
    李文政
  • 依托单位:
结直肠癌TIME多模态分子影像分析结合深度学习实现疗效评估和预后预测
  • 批准号:
    62171167
  • 项目类别:
    面上项目
  • 资助金额:
    57万元
  • 批准年份:
    2021
  • 负责人:
    姜慧杰
  • 依托单位: