Collaborative Research: ITR/NGS: Multiresolution High Fidelity Earthquake Modeling: Dynamic Rupture, Basin Response, Blind Deconvolution Seismic Inversion, and Ultrascale Computing

合作研究:ITR/NGS:多分辨率高保真地震建模:动态破裂、盆地响应、盲解卷积地震反演和超大规模计算

基本信息

  • 批准号:
    0326449
  • 负责人:
  • 金额:
    --
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Continuing Grant
  • 财政年份:
    2003
  • 资助国家:
    美国
  • 起止时间:
    2003-10-01 至 2008-09-30
  • 项目状态:
    已结题

项目摘要

This project is aimed at developing a three-dimensional seismic inverse model and then using it to obtain information about the both three-dimensional structure of the Greater Los Angeles Basin and the nature of fault rupture during recent major Southern California earthquakes such as the Landers and Northridge earthquakes. At the end of the project these tools will also be applied to the Kanto Basin and the 1923 Kanto Earthquake. The project will capitalize on both the recent and projected growth in seismic networks deployed in Southern California and the increase in the capabilities of supercomputing systems. The inverse problem is very large. Part of the project involves structuring the inverse model so that it will run well on large parallel systems. Most of this work will be done on single systems such as those available at National Science Foundation and Department of Energy computing centers; however, because the inverse model requires many iterations of forward and adjoint runs, it has a coarse granularity that the investigators plan to exploit by also deploying the inverse model on the distributed computing environment of the Teragrid. The long-term benefits of this work are likely to be a better understanding of the geological structure of the Greater Los Angeles Basin, a better understanding of fault rupture, and improvements in the ability to predict strong ground motion. Sophisticated seismic inversion tools of the sort developed here will help researchers gain maximum benefit from the data that will start to come on-line in the next few years from the United States Array.
该项目旨在开发一个三维地震反演模型,然后使用它来获得有关大洛杉矶盆地的三维结构和最近南加州大地震(如兰德斯和北岭地震)期间断层破裂的性质的信息。 在项目结束时,这些工具还将应用于关东盆地和1923年关东地震。 该项目将充分利用南加州部署的地震网络最近和预计的增长以及超级计算系统能力的增加。 逆问题非常大。 该项目的一部分涉及构建逆模型,使其在大型并行系统上运行良好。 大部分工作将在单个系统上完成,例如国家科学基金会和能源部计算中心提供的系统;然而,由于逆模型需要多次迭代向前和伴随运行,因此它具有粗粒度,研究人员计划通过在Teragrid的分布式计算环境上部署逆模型来利用它。 这项工作的长期效益可能是更好地了解大洛杉矶盆地的地质结构,更好地了解断层破裂,并提高预测强地面运动的能力。 这里开发的这种复杂的地震反演工具将帮助研究人员从美国阵列未来几年将开始上线的数据中获得最大利益。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Jacobo Bielak其他文献

Galerkin boundary integral equation method for spontaneous rupture propagation problems
求解自发破裂扩展问题的伽辽金边界积分方程法
  • DOI:
  • 发表时间:
    2008
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Hiroyuki Goto;Jacobo Bielak
  • 通讯作者:
    Jacobo Bielak
有限要素法と境界積分方程式法を組み合わせた断層破壊の数値解析手法の開発
有限元法与边界积分方程法相结合的断层破裂数值分析方法的发展
  • DOI:
  • 发表时间:
    2007
  • 期刊:
  • 影响因子:
    0
  • 作者:
    後藤浩之;Jacobo Bielak;後藤浩之
  • 通讯作者:
    後藤浩之
A simplified version of Gurtin's variational principles
Numerical simulation of dynamic fault rupture propagation based on a combination of BIEM and FEM solutions
基于BIEM与FEM结合的动态断层破裂扩展数值模拟
ガラーキン境界積分方程式法を用いた自発的な断層破壊解析手法の開発
利用伽辽金边界积分方程法开发自发断层破裂分析方法
  • DOI:
  • 发表时间:
    2008
  • 期刊:
  • 影响因子:
    0
  • 作者:
    後藤浩之;Jacobo Bielak
  • 通讯作者:
    Jacobo Bielak

Jacobo Bielak的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Jacobo Bielak', 18)}}的其他基金

Indirect Bridge Health Monitoring Using Moving Vehicles
使用移动车辆进行间接桥梁健康监测
  • 批准号:
    1130616
  • 财政年份:
    2011
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
Towards Petascale Simulation of Urban Earthquake Impacts
迈向千万亿级城市地震影响模拟
  • 批准号:
    0749227
  • 财政年份:
    2007
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
NEESR-SG: High-fidelity site characterization by experimentation, field observation, and inversion-based modeling
NEESR-SG:通过实验、现场观察和基于反演的建模进行高保真场地表征
  • 批准号:
    0619078
  • 财政年份:
    2006
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
KDI: Large-Scale Inversion-Based Modeling of Complex Earthquake Ground Motion in Sedimentary Basins
KDI:沉积盆地复杂地震地面运动的大规模反演建模
  • 批准号:
    9980063
  • 财政年份:
    1999
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
Postdoc: Parallel Computations for Wave Propagation Modeling of Large Basins
博士后:大型盆地波浪传播建模的并行计算
  • 批准号:
    9503991
  • 财政年份:
    1995
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
Scientific Supercomputing, Visualization, and Animation in Geotechnical Earthquake Engineering & Engineering Seismology
岩土地震工程中的科学超级计算、可视化和动画
  • 批准号:
    9419696
  • 财政年份:
    1994
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
Seismic Canyon Interaction Effects in Earth and Rockfill Dams
土坝和堆石坝中的地震峡谷相互作用效应
  • 批准号:
    9320824
  • 财政年份:
    1994
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
Earthquake Ground Motion Modeling in Large Basins
大盆地地震地面运动模拟
  • 批准号:
    9318163
  • 财政年份:
    1993
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
Seismic Ground Motion in Sedimentary Valleys: Focusing or Chaos?
沉积谷地震动:聚焦还是混沌?
  • 批准号:
    9319339
  • 财政年份:
    1993
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
REG: A Computational Mechanics Laboratory
REG:计算力学实验室
  • 批准号:
    9212819
  • 财政年份:
    1992
  • 资助金额:
    --
  • 项目类别:
    Standard Grant

相似国自然基金

Research on Quantum Field Theory without a Lagrangian Description
  • 批准号:
    24ZR1403900
  • 批准年份:
    2024
  • 资助金额:
    0.0 万元
  • 项目类别:
    省市级项目
Cell Research
  • 批准号:
    31224802
  • 批准年份:
    2012
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Cell Research
  • 批准号:
    31024804
  • 批准年份:
    2010
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Cell Research (细胞研究)
  • 批准号:
    30824808
  • 批准年份:
    2008
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Research on the Rapid Growth Mechanism of KDP Crystal
  • 批准号:
    10774081
  • 批准年份:
    2007
  • 资助金额:
    45.0 万元
  • 项目类别:
    面上项目

相似海外基金

ITR Collaborative Research: Pervasively Secure Infrastructures (PSI): Integrating Smart Sensing, Data Mining, Pervasive Networking, and Community Computing
ITR 协作研究:普遍安全基础设施 (PSI):集成智能传感、数据挖掘、普遍网络和社区计算
  • 批准号:
    1404694
  • 财政年份:
    2013
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
ITR-SCOTUS: A Resource for Collaborative Research in Speech Technology, Linguistics, Decision Processes, and the Law
ITR-SCOTUS:语音技术、语言学、决策过程和法律合作研究的资源
  • 批准号:
    1139735
  • 财政年份:
    2011
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
ITR/NGS: Collaborative Research: DDDAS: Data Dynamic Simulation for Disaster Management
ITR/NGS:合作研究:DDDAS:灾害管理数据动态模拟
  • 批准号:
    0963973
  • 财政年份:
    2009
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
ITR/NGS: Collaborative Research: DDDAS: Data Dynamic Simulation for Disaster Management
ITR/NGS:合作研究:DDDAS:灾害管理数据动态模拟
  • 批准号:
    1018072
  • 财政年份:
    2009
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
ITR Collaborative Research: A Reusable, Extensible, Optimizing Back End
ITR 协作研究:可重用、可扩展、优化的后端
  • 批准号:
    0838899
  • 财政年份:
    2008
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
ITR Collaborative Research: Pervasively Secure Infrastructures (PSI): Integrating Smart Sensing, Data Mining, Pervasive Networking, and Community Computing
ITR 协作研究:普遍安全基础设施 (PSI):集成智能传感、数据挖掘、普遍网络和社区计算
  • 批准号:
    0833849
  • 财政年份:
    2008
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
ITR/NGS: Collaborative Research: DDDAS: Data Dynamic Simulation for Disaster Management
ITR/NGS:合作研究:DDDAS:灾害管理数据动态模拟
  • 批准号:
    0808419
  • 财政年份:
    2007
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
ITR: Collaborative Research: Modeling and Display of Haptic Information for Enhanced Performance of Computer-Integrated Surgery
ITR:协作研究:触觉信息建模和显示,以提高计算机集成手术的性能
  • 批准号:
    0711040
  • 财政年份:
    2007
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
ITR: Collaborative Research - ASE - (sim+dmc): Image-based Biophysical Modeling: Scalable Registration and Inversion Algorithms and Distributed Computing
ITR:协作研究 - ASE - (sim dmc):基于图像的生物物理建模:可扩展配准和反演算法以及分布式计算
  • 批准号:
    0849301
  • 财政年份:
    2007
  • 资助金额:
    --
  • 项目类别:
    Continuing Grant
Collaborative Research: ITR-(ASE)-(dmc): Overcoming Fractionation Errors in Cancer Treatement Planning
合作研究:ITR-(ASE)-(dmc):克服癌症治疗计划中的分割错误
  • 批准号:
    0749671
  • 财政年份:
    2006
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了