课题基金 / 基金详情

Time-Dependent Earthquake Forecasts with a Tectonic Basis

Time-Dependent Earthquake Forecasts with a Tectonic Basis
基于构造基础的时变地震预报
批准号:
0711515
负责人:
G. Peter Bird
金额:
$41.74万
依托单位国家:
美国
项目类别:
Continuing Grant
财政年份:
2007
资助国家:
美国
项目状态:
已结题
起止时间:
2007-07-15 至 2010-06-30

项目摘要

项目成果

G. Peter Bird的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The investigators are preparing, publishing, and testing earthquake forecasts in order to resolve some basic questions about shallow seismicity, and improve knowledge of global seismic hazard. Each forecast describes a large region (of global scale), or even the entire Earth, and consists of a digital map (or set of maps) of earthquake probabilities for particular minimum/threshold magnitude(s) and for particular period(s) of time. The emphasis on large areas and moderate threshold magnitudes means that large numbers of actual earthquakes can be compared with each forecast, and relative success (compared to a null hypothesis or simpler model) can be evaluated quantitatively. This work builds on two different forecasting methods, each based on an elementary insight about seismicity: Earthquakes cluster in space and time (ETES model); and earthquakes occur at locations of fault slip and other anelastic strain (SHIFT model). In this project, each model is first undergoing refinement based on guidance from the other. Short-term earthquake clustering and triggering are being studied in five tectonic zones based on a detailed kinematic model. Also, the assumed proportionality of long-term seismicity to tectonic rate (except on mid-ocean spreading rises) is being tested using statistics that take account of clustering. The next step is to merge the two forecast models, testing several different kinds of possible combination, to create time-dependent earthquake forecasts with a tectonic basis. Finally, the investigators will determine the time-scales over which the forecast method should shift from primarily clustering-based to primarily tectonics-based. (This time is likely to be controlled by the local rate of tectonic stress accumulation.) Each hypothesis about general controls on seismicity (and/or specific parameter values) is initially evaluated by retrospective testing against existing catalogs. Hypotheses which pass these tests are further investigated in formal prospective tests administered by the Collaboratory for the Study of Earthquake Predictability. This project is creating a new combined forecasting algorithm for consideration by the Working Group on California Earthquake Probabilities and other similar groups, which provides a "seamless" transition from 1-year and 5-year forecasts to 50-year and 500-year forecasts, meeting a variety of social needs. The potential downstream social benefits may be large if more accurate earthquake forecasts can be quickly implemented on a global basis. The project is also attempting to resolve one of the most fundamental questions about seismicity: Whether low-seismicity plate boundaries are permanent, or temporary? This will guide the next generation of hypotheses about what controls seismic versus aseismic slip on cool, frictional faults.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Direct Computation and Systematic Interpretation of Plate Driving Forces Worldwide
Tectonic Modeling of New Zealand
  • 批准号:
    9902735
  • 项目类别:
    Standard Grant
  • 资助金额:
    $11.98万
  • 财政年份:
    1999
  • 负责人:
    G. Peter Bird
  • 依托单位:
Quantitative Synthesis of Structural, Paleomagnetic, and Stress Data from North America since 85 Ma
Quantitative Synthesis of Structural, Paleomagnetic and Stress Data from North America since 85 Ma
国内基金
海外基金
当归芍药散基于双向调控Ras/cAMP-dependent PKA自噬通路的“酸甘化阴、辛甘化阳”的药性基础
  • 批准号:
    81973497
  • 项目类别:
    面上项目
  • 资助金额:
    55.0万元
  • 批准年份:
    2019
  • 负责人:
    刘四军
  • 依托单位:
蒺藜苜蓿细胞周期蛋白依赖性激酶(cyclin-dependent kinase)对根瘤发育的功能研究
  • 批准号:
    31100871
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    20.0万元
  • 批准年份:
    2011
  • 负责人:
    何恒斌
  • 依托单位:
Posphoinositide-dependent kinase-1在肿瘤细胞趋化运动和转移中的作用机制
  • 批准号:
    30772529
  • 项目类别:
    面上项目
  • 资助金额:
    29.0万元
  • 批准年份:
    2007
  • 负责人:
    张宁
  • 依托单位: