SBIR Phase I: SmartNet Applications for Mobility and Safety (SAMS)

SBIR 第一阶段:用于移动性和安全性的 SmartNet 应用 (SAMS)

基本信息

  • 批准号:
    1142381
  • 负责人:
  • 金额:
    $ 14.62万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2012
  • 资助国家:
    美国
  • 起止时间:
    2012-01-01 至 2012-10-31
  • 项目状态:
    已结题

项目摘要

This Small Business Innovation Research (SBIR) Phase I project will pursue an innovation that can dramatically improve traffic mobility and safety. This study is based on an open wireless sensor network platform that supports many sensing modes, and time-stamps all measurements. The sensing modalities include magnetic sensors that detect vehicles; new micro-radar sensors that detect bicycles, pedestrians and parked vehicles; GPS-based sensors that locate vehicles; conflict monitoring cards that measure traffic signal phase; and environmental sensors that can be added as they become cheaper. The proposed concept can be incrementally deployed to augment sensing capability and coverage area; it can be deployed over all major arterials in a city within one month. Being time-synchronous, different data sources can be combined to develop innovative applications about intersection safety, arterial delay and emissions, signal coordination, transit priority, vehicle location, and parking availability. Today, this information is unavailable (e.g. intersection safety) or needs special purpose systems (e.g. pedestrian presence.The broader impact/commercial potential of this project will benefit city administrations. Poor intersection control causes 5 to 10 percent of traffic delay on major roads. Congestion costs the peak-period traveler 38 hours of travel time and 26 gallons of fuel annually. 36 percent of crashes are intersection-related. Faced with this high cost of poor road management, city administrations are looking to analyze data to efficiently deliver transportation services. This "analytics" approach brings rich dividends through improved mobility and safety. However, collecting the data to implement this approach today is prohibitively expensive. Existing intersection safety products are primarily Red Light Enforcement (RLE) cameras. RLE is controversial. An Insurance Institute of Highway Safety (IIHS) report states: More than 25 percent of drivers oppose red light cameras; they believe that cameras can make mistakes, are used to generate revenue for governments rather than for safety; lead to more crashes because drivers speed up to beat the red light or stop suddenly and are rear-ended; or invade privacy.
这个小型企业创新研究(SBIR)第一阶段项目将致力于一项能够显著提高交通流动性和安全性的创新。这项研究是基于一个开放的无线传感器网络平台,该平台支持多种感知模式,并对所有测量数据进行时间戳。传感设备包括探测车辆的磁性传感器;探测自行车、行人和停放车辆的新型微型雷达传感器;定位车辆的基于GPS的传感器;测量交通信号相位的冲突监测卡;以及环境传感器,这些传感器可以在价格变得更低时添加。提出的概念可以逐步部署,以扩大感知能力和覆盖范围;它可以在一个月内部署在城市所有主要干线上。由于时间同步,不同的数据源可以组合在一起,开发关于十字路口安全、干线延误和排放、信号协调、交通优先、车辆位置和停车可用性的创新应用程序。今天,这些信息无法获得(例如十字路口安全)或需要特殊用途的系统(例如行人在场)。该项目的更广泛影响/商业潜力将使城市管理部门受益。交叉口控制不善导致了主干道5%至10%的交通延误。交通拥堵每年让高峰期的旅行者损失38小时的旅行时间和26加仑的燃料。36%的撞车事故与十字路口有关。面对糟糕的道路管理带来的高昂成本,城市管理部门正寻求分析数据,以高效地提供交通服务。这种“分析”方法通过提高移动性和安全性带来了丰厚的红利。然而,今天收集数据来实施这种方法的成本高得令人望而却步。现有的路口安全产品主要是红灯执法(RLE)摄像头。RLE存在争议。公路安全保险研究所(IIHS)的一份报告称:超过25%的司机反对闯红灯摄像头;他们认为摄像头可能会出错,被用来为政府创造收入,而不是为了安全;因为司机加速闯红灯或突然停车而被追尾而导致更多撞车事故;或侵犯隐私。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Pravin Varaiya其他文献

Effects of pricing on Internet user behavior
  • DOI:
    10.1023/a:1009944726255
  • 发表时间:
    2001-06-01
  • 期刊:
  • 影响因子:
    0.800
  • 作者:
    Jörn Altmann;Björn Rupp;Pravin Varaiya
  • 通讯作者:
    Pravin Varaiya
Control of multiple service, multiple resource communication networks
多服务、多资源通信网络的控制
  • DOI:
    10.1109/26.328979
  • 发表时间:
    1994
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Scott Jordan;Pravin Varaiya
  • 通讯作者:
    Pravin Varaiya
Distributed Estimation
分布式估计
Protocol design for an automated highway system
Mechanism Design for Networking Research
  • DOI:
    10.1023/a:1022085620459
  • 发表时间:
    2003-01-01
  • 期刊:
  • 影响因子:
    8.300
  • 作者:
    Jun Shu;Pravin Varaiya
  • 通讯作者:
    Pravin Varaiya

Pravin Varaiya的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Pravin Varaiya', 18)}}的其他基金

EAGER: Real-Time: Intelligent Intersections
EAGER:实时:智能交叉口
  • 批准号:
    1839843
  • 财政年份:
    2018
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Standard Grant
SBIR Phase II: Safety and Mobility System
SBIR 第二阶段:安全和移动系统
  • 批准号:
    1329477
  • 财政年份:
    2013
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Standard Grant
Collaborative Research: CyberSEES: Coupon Incentive-based Risk Aware Demand Response in Smart Grid
合作研究:Cyber​​SEES:智能电网中基于优惠券激励的风险意识需求响应
  • 批准号:
    1331692
  • 财政年份:
    2013
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Standard Grant
CPS:Medium:Collaborative Research:Information and Computation Hierarchy for Smart Grids
CPS:中:协作研究:智能电网的信息和计算层次结构
  • 批准号:
    1135872
  • 财政年份:
    2011
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Standard Grant
SBIR Phase II: Wireless Weigh-in-Motion
SBIR 第二阶段:无线动态称重
  • 批准号:
    1057566
  • 财政年份:
    2011
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Standard Grant
The Problem of Measurement Output Control under Set-membership Uncertainty
集合成员不确定性下的测量输出控制问题
  • 批准号:
    0807771
  • 财政年份:
    2008
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Continuing Grant
Wireless Sensor Networks For Traffic Surveillance
用于交通监控的无线传感器网络
  • 批准号:
    0408627
  • 财政年份:
    2004
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Continuing Grant
Multi-Agent Control: Mechanism Design and Adaptive Learning
多智能体控制:机制设计和自适应学习
  • 批准号:
    0424445
  • 财政年份:
    2004
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Standard Grant
Hierarchical Systems
层级系统
  • 批准号:
    0099824
  • 财政年份:
    2001
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Standard Grant
Real-time Estimation and Control of California Freeway Traffic
加州高速公路交通实时估计与控制
  • 批准号:
    0085739
  • 财政年份:
    2000
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Standard Grant

相似国自然基金

Baryogenesis, Dark Matter and Nanohertz Gravitational Waves from a Dark Supercooled Phase Transition
  • 批准号:
    24ZR1429700
  • 批准年份:
    2024
  • 资助金额:
    0.0 万元
  • 项目类别:
    省市级项目
ATLAS实验探测器Phase 2升级
  • 批准号:
    11961141014
  • 批准年份:
    2019
  • 资助金额:
    3350 万元
  • 项目类别:
    国际(地区)合作与交流项目
地幔含水相Phase E的温度压力稳定区域与晶体结构研究
  • 批准号:
    41802035
  • 批准年份:
    2018
  • 资助金额:
    12.0 万元
  • 项目类别:
    青年科学基金项目
基于数字增强干涉的Phase-OTDR高灵敏度定量测量技术研究
  • 批准号:
    61675216
  • 批准年份:
    2016
  • 资助金额:
    60.0 万元
  • 项目类别:
    面上项目
基于Phase-type分布的多状态系统可靠性模型研究
  • 批准号:
    71501183
  • 批准年份:
    2015
  • 资助金额:
    17.4 万元
  • 项目类别:
    青年科学基金项目
纳米(I-Phase+α-Mg)准共晶的临界半固态形成条件及生长机制
  • 批准号:
    51201142
  • 批准年份:
    2012
  • 资助金额:
    25.0 万元
  • 项目类别:
    青年科学基金项目
连续Phase-Type分布数据拟合方法及其应用研究
  • 批准号:
    11101428
  • 批准年份:
    2011
  • 资助金额:
    23.0 万元
  • 项目类别:
    青年科学基金项目
D-Phase准晶体的电子行为各向异性的研究
  • 批准号:
    19374069
  • 批准年份:
    1993
  • 资助金额:
    6.4 万元
  • 项目类别:
    面上项目

相似海外基金

UK involvement in LSST: Phase C (Imperial component)
英国参与 LSST:C 阶段(帝国部分)
  • 批准号:
    ST/X001326/1
  • 财政年份:
    2025
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Research Grant
Phase 2 - Effective and Integrated Chemical Free Robotic Milking
第 2 阶段 - 有效且集成的无化学品机器人挤奶
  • 批准号:
    10093094
  • 财政年份:
    2024
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Collaborative R&D
Net Zero Pathfinder - Phase 2 Manchester
净零探路者 - 第二阶段曼彻斯特
  • 批准号:
    10095254
  • 财政年份:
    2024
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Demonstrator
Phase Averaged Deferred Correction for Multi-Timescale Systems
多时间尺度系统的相位平均延迟校正
  • 批准号:
    EP/Y032624/1
  • 财政年份:
    2024
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Research Grant
Model order reduction for fast phase-field fracture simulations
快速相场断裂模拟的模型降阶
  • 批准号:
    EP/Y002474/1
  • 财政年份:
    2024
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Research Grant
IUCRC Phase I University of Wisconsin-Milwaukee: Center for Concrete Advancement Network (CAN), Lead Site
IUCRC 第一阶段威斯康星大学密尔沃基分校:混凝土进步网络中心 (CAN),主要站点
  • 批准号:
    2310861
  • 财政年份:
    2024
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Continuing Grant
IUCRC Phase III University of Colorado Boulder: Center for Membrane Applications, Science and Technology (MAST)
IUCRC 第三阶段科罗拉多大学博尔德分校:膜应用、科学与技术中心 (MAST)
  • 批准号:
    2310937
  • 财政年份:
    2024
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Continuing Grant
SBIR Phase II: Innovative Two-Phase Cooling with Micro Closed Loop Pulsating Heat Pipes for High Power Density Electronics
SBIR 第二阶段:用于高功率密度电子产品的创新两相冷却微闭环脉动热管
  • 批准号:
    2321862
  • 财政年份:
    2024
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Cooperative Agreement
SBIR Phase I: Industrial-Scale Technology for Drug Development in Mature Human Fat Cells
SBIR 第一阶段:成熟人类脂肪细胞药物开发的工业规模技术
  • 批准号:
    2322443
  • 财政年份:
    2024
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Standard Grant
STTR Phase II: Fabrication and Structural Testing of a 3D Concrete Printed Anchor for Floating Offshore Wind
STTR 第二阶段:用于浮动海上风电的 3D 混凝土打印锚的制造和结构测试
  • 批准号:
    2333306
  • 财政年份:
    2024
  • 资助金额:
    $ 14.62万
  • 项目类别:
    Cooperative Agreement
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了