SI2-SSI: Collaborative Research: Building Sustainable Tools and Collaboration for Volcanic and Related Hazards

SI2-SSI:协作研究:针对火山及相关灾害构建可持续工具和协作

基本信息

  • 批准号:
    1339768
  • 负责人:
  • 金额:
    $ 19.49万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2013
  • 资助国家:
    美国
  • 起止时间:
    2013-10-01 至 2017-09-30
  • 项目状态:
    已结题

项目摘要

This project is focused on creating and upgrading software infrastructure for a large community of scientists engaged in volcanology research and associated hazard analysis. Specifically, the project will reengineer three widely used tools (TITAN2D - block and ash flows, TEPHRA and Puff - ash transport and dispersal) and develop support for workflows that use these tools to analyze risk from volcanic hazards. Reengineering will encompass modularization so researchers may easily experiment with different modeling approaches, incorporation of techniques to make the tools efficient on new computing architectures like GPUs and many-core chips. The workflows are intended to tackle the challenges of managing complex and often large data flows associated with these tools in validation processes and in probabilistic inference based on the outcomes of the modeling. The tools and workflows will be made available using the popular vhub.org platform. This project will help provide a standard well managed hardware/software platform and approaches to standardize the documentation associated with input data, source code, and output data. This will ensure that model calculations are reproducible.The wider use of these high fidelity tools and their use in mitigating hazards is likely to have a significant effect on hazard analysis and management. The project will also engage in several major workshops and in training activities. Project personnel will also engage in the Earthcube initiative - popularizing computational methodologies, online access and dissemination mechanisms through the VHub platform.
该项目的重点是为从事火山学研究和相关灾害分析的大型科学家群体创建和升级软件基础设施。 具体来说,该项目将重新设计三种广泛使用的工具(TITAN2D - 块体和火山灰流动、TEPHRA 和 Puff - 火山灰运输和扩散),并为使用这些工具分析火山灾害风险的工作流程提供支持。重新设计将包括模块化,因此研究人员可以轻松地尝试不同的建模方法,结合技术使工具在 GPU 和多核芯片等新计算架构上高效运行。这些工作流程旨在解决在验证过程和基于建模结果的概率推理中管理与这些工具相关的复杂且通常较大的数据流的挑战。这些工具和工作流程将通过流行的 vhub.org 平台提供。该项目将有助于提供一个标准的、管理良好的硬件/软件平台和方法来标准化与输入数据、源代码和输出数据相关的文档。这将确保模型计算的可重复性。这些高保真工具的广泛使用及其在减轻危害方面的使用可能会对危害分析和管理产生重大影响。该项目还将举办多个大型研讨会和培训活动。项目人员还将参与 Earthcube 计划——通过 VHub 平台普及计算方法、在线访问和传播机制。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Charles Connor其他文献

Integrating Computational Thinking into Geoscientific Inquiry About Volcanic Eruption Hazards and Risks
将计算思维融入有关火山喷发危害和风险的地球科学研究中

Charles Connor的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Charles Connor', 18)}}的其他基金

AGU Chapman Conference on Distributed Volcanism; Flagstaff, AZ; March 2020
AGU 查普曼分布式火山会议;
  • 批准号:
    2015861
  • 财政年份:
    2020
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
Collection of a High-Resolution Spatial and Ground-Based Dataset From the 2010 Explosive Events at Merapi Volcano, Java, Indonesia
收集 2010 年印度尼西亚爪哇默拉皮火山爆发事件的高分辨率空间和地面数据集
  • 批准号:
    1114852
  • 财政年份:
    2011
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
CDI-Type II Proposal: VHub: Collaborative Research: Cyberinfrastructure for Volcano Eruption and Hazards Modeling and Simulation
CDI-II 类提案:VHub:协作研究:火山喷发和灾害建模与模拟的网络基础设施
  • 批准号:
    0940839
  • 财政年份:
    2010
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
Estimating Eruption Model Input Parameters From Direct Observations of Deeply Eroded Basalt Conduits, San Rafael, UT
根据深度侵蚀玄武岩管道的直接观察估算喷发模型输入参数,犹他州圣拉斐尔
  • 批准号:
    0910696
  • 财政年份:
    2009
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
SGER: Extent and Impact of Distal Ash Fallout From the May 2008 Eruption of Chaiten, Chile
SGER:2008 年 5 月智利 Chaiten 喷发造成的远端火山灰沉降的范围和影响
  • 批准号:
    0838115
  • 财政年份:
    2008
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
ITR/AP(Geo): Collaborative Proposal For First Generation Model And Data Assimilation System To Reduce Volcanic Hazards
ITR/AP(Geo):减少火山灾害的第一代模型和数据同化系统的合作提案
  • 批准号:
    0130602
  • 财政年份:
    2001
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
Structure of Active Fumarole Fields: An Integrated Geophysical and Geochemical Approach
活跃喷气孔场的结构:综合地球物理和地球化学方法
  • 批准号:
    9206048
  • 财政年份:
    1992
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
RUI: Measuring and Modeling Changes in Colima Volcano's Summit Dome
RUI:测量和模拟科利马火山顶峰的变化
  • 批准号:
    9017845
  • 财政年份:
    1991
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant

相似国自然基金

考虑SSI效应的导管架式海洋平台抗震性能研究
  • 批准号:
  • 批准年份:
    2022
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
考虑SSI的层间隔震高层建筑结构在三维地震下的响应研究
  • 批准号:
    52168072
  • 批准年份:
    2021
  • 资助金额:
    35 万元
  • 项目类别:
    地区科学基金项目
考虑SSI效应的大型储罐动力学特性及其隔板减晃研究
  • 批准号:
    51978336
  • 批准年份:
    2019
  • 资助金额:
    61.0 万元
  • 项目类别:
    面上项目
考虑SSI效应的摇摆墙-框架结构抗震机理及性能评估方法研究
  • 批准号:
    51978524
  • 批准年份:
    2019
  • 资助金额:
    60.0 万元
  • 项目类别:
    面上项目
考虑能量需求和SSI效应的RC梁式桥基于性能的抗震设计方法
  • 批准号:
    50908014
  • 批准年份:
    2009
  • 资助金额:
    20.0 万元
  • 项目类别:
    青年科学基金项目

相似海外基金

Collaborative Research: SI2-SSI: Expanding Volunteer Computing
合作研究:SI2-SSI:扩展志愿者计算
  • 批准号:
    2039142
  • 财政年份:
    2020
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
SI2-SSI: Collaborative Research: Einstein Toolkit Community Integration and Data Exploration
SI2-SSI:协作研究:Einstein Toolkit 社区集成和数据探索
  • 批准号:
    2114580
  • 财政年份:
    2020
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Continuing Grant
Collaborative Research: SI2-SSI: Expanding Volunteer Computing
合作研究:SI2-SSI:扩展志愿者计算
  • 批准号:
    2001752
  • 财政年份:
    2019
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
Collaborative Research: SI2-SSI: Open Source Support for Massively Parallel, Generic Finite Element Methods
合作研究:SI2-SSI:对大规模并行、通用有限元方法的开源支持
  • 批准号:
    1741870
  • 财政年份:
    2017
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
Collaborative Research: SI2-SSI: Expanding Volunteer Computing
合作研究:SI2-SSI:扩展志愿者计算
  • 批准号:
    1664022
  • 财政年份:
    2017
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
Collaborative Research: SI2-SSI: Cyberinfrastructure for Advancing Hydrologic Knowledge through Collaborative Integration of Data Science, Modeling and Analysis
合作研究:SI2-SSI:通过数据科学、建模和分析的协作集成推进水文知识的网络基础设施
  • 批准号:
    1664061
  • 财政年份:
    2017
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
SI2-SSI: Collaborative Research: Scalable Infrastructure for Enabling Multiscale and Multiphysics Applications in Fluid Dynamics, Solid Mechanics, and Fluid-Structure Interaction
SI2-SSI:协作研究:可扩展基础设施,支持流体动力学、固体力学和流固耦合中的多尺度和多物理场应用
  • 批准号:
    1836797
  • 财政年份:
    2017
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
Collaborative Research: SI2-SSI: Modules for Experiments in Stellar Astrophysics
合作研究:SI2-SSI:恒星天体物理实验模块
  • 批准号:
    1663684
  • 财政年份:
    2017
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
Collaborative Research: SI2-SSI: Inquiry-Focused Volumetric Data Analysis Across Scientific Domains: Sustaining and Expanding the yt Community
合作研究:SI2-SSI:跨科学领域以调查为中心的体积数据分析:维持和扩展 yt 社区
  • 批准号:
    1663893
  • 财政年份:
    2017
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
Collaborative Research: SI2-SSI: Cyberinfrastructure for Advancing Hydrologic Knowledge through Collaborative Integration of Data Science, Modeling and Analysis
合作研究:SI2-SSI:通过数据科学、建模和分析的协作集成推进水文知识的网络基础设施
  • 批准号:
    1664018
  • 财政年份:
    2017
  • 资助金额:
    $ 19.49万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了